Creation of a distributed system for the protection of critical infrastructure sites & nexus; connecticop & rdning; as a result of research and development (Q78556)

From EU Knowledge Graph
Revision as of 15:39, 9 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Creation of a distributed system for the protection of critical infrastructure sites & nexus; connecticop & rdning; as a result of research and development
Project in Poland financed by DG Regio

    Statements

    0 references
    1,690,737.5 zloty
    0 references
    405,777.0 Euro
    13 January 2020
    0 references
    2,492,237.5 zloty
    0 references
    598,137.0 Euro
    13 January 2020
    0 references
    67.84 percent
    0 references
    1 September 2019
    0 references
    31 August 2021
    0 references
    FCA SP. Z O.O.
    0 references
    0 references

    50°1'59.5"N, 20°13'0.5"E
    0 references
    Wnioskowany przez przedsiębiorstwo FCA Sp. z o.o. projekt polega na przeprowadzeniu prac badawczo – rozwojowych prowadzących do stworzenia innowacji produktowej na skalę krajową – rozproszonego systemu ochrony obiektów infrastruktury krytycznej – Connecticop. Gotowy system będzie składał się z autonomicznych koncentratorów alarmów, urządzenia dokonującego kolekcji danych oraz bezpiecznego systemu wymiany danych opartego o technologię Blockchain, który zapewni niepodważalność wystąpienia incydentu bezpieczeństwa w nadzorowanej infrastrukturze fizycznej. W ramach przedsięwzięcia przewidziana jest realizacja dwóch etapów prac badawczo – rozwojowych: jednego etapu badań przemysłowych oraz jednego etapu prac rozwojowych. Przewidziany czas realizacji projektu to 24 miesiące – od 1.06.2019 r. do 31.05.2021 r. Innowacyjny produkt będzie dedykowany przede wszystkim zapewnieniu bezpieczeństwa trzem systemom tzw. infrastruktury krytycznej: zaopatrzenia w energię, surowce energetyczne i paliwa; łączności oraz sieci teleinformatycznych. Efekt realizacji projektu – innowacyjny produkt zostanie wdrożony w działalność własną przedsiębiorstwa FCA Sp. z o.o. art. 25 rozporządzenia KE nr 651/2014 z dnia 17 czerwca 2014 r. uznające niektóre rodzaje pomocy za zgodne z rynkiem wewnętrznym w stosowaniu art. 107 i 108 Traktatu (Dz. Urz. UE L 187/1 z 26.06.2014)); (Polish)
    0 references
    The project requested by FCA Sp. z o.o. is to carry out a research work of & extra;development leading to the creation of product innovation at the national scale & rest;scattered protection systems for critical infrastructure sites & pressing;Connecticop.The finished system will consist of autonomous alarms, data collection devices and a secure Blockchain system for data exchange, which will ensure that there is no doubt about the occurrence of a security incident in a supervised physical infrastructure.Within the framework of the project, two phases of research and development are foreseen;development:one industrial research and development phase.The planned duration of the project is 24 months & extra;from 1.06.2019 to 31.05.2021, an innovative product will be dedicated primarily to ensuring the security of three critical infrastructure systems:energy supply, raw materials and fuels;communication and information networks.The effect of the & rest project;the innovative product will be implemented in the own business of FCA Sp. z o.o. Article 25 of Commission Regulation (EC) No 651/2014 of 17 June 2014 declaring certain categories of aid compatible with the internal market in the application of Article 107 and 108 of the Treaty (Dz.(OJ LEU L 187/1, 26.06.2014); (English)
    0 references

    Identifiers

    POIR.01.01.01-00-1042/18
    0 references