(A19_093_2016_0930033_1032) EFFFICENTITIES (Q2066468)

From EU Knowledge Graph
Revision as of 00:29, 9 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Italy financed by DG Regio
Language Label Description Also known as
English
(A19_093_2016_0930033_1032) EFFFICENTITIES
Project in Italy financed by DG Regio

    Statements

    0 references
    43,500.0 Euro
    0 references
    87,000.0 Euro
    0 references
    50.0 percent
    0 references
    29 July 2016
    0 references
    10 December 2018
    0 references
    31 October 2018
    0 references
    PUCCI SAORO S.R.L.
    0 references
    Q293157 (Deleted Item)
    0 references
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    IL PROGETTO RIGUARDA UN ISOLAMENTO TERMICO DI STRUTTURE ORIZZONTALI, IN PARTICOLARE L?ISOLAMENTO DELLA COPERTURA. LA VECCHIA COPERTURA ? STATA SOGGETTA A QUASI 30 ANNI DI EVENTI ATMOSFERICI CHE SICURAMENTE HANNO RESO PI? FRAGILE IL MATERIALE CON CUI ESSA ? STATA REALIZZATA (AMIANTO). LA COPERTURA ESISTENTE CHE ? STATA REALIZZATA IN CEMENTO AMIANTO ANDR? RIMOSSA DA PERSONALE QUALIFICATO E SMALTITA IN DISCARICHE CERTIFICATE. L'ISOLAMENTO DELLA COPERTURA AVVERR? MEDIANTE L'INSTALLAZIONE DI PANNELLI ISOLATI IN METALLO A SOSTITUZIONE DELLE LASTRE DEL CONTROSOFFITTO E IN ONDULINE CON METALLO VERNICIATE CHIARE E LUCIDE PER RIFLETTERE LA RADIAZIONE SOLARE: VERR? ISOLATO IN CONTRO-SOFFITTO PERCH? L'INTERCAPEDINE D'ARIA ? TROPPO ALTA E QUINDI VA CONSIDERATA COME UN VANO TECNICO FREDDO. IN BASE ALLE ANALISI SVOLTE DURANTE IL SOPRALLUOGO SULLE TIPOLOGIE DI IMPIANTO E SULLE DESTINAZIONI D?USO L?EDIFICIO PU? ESSERE COS? SUDDIVISO: - ZONA ?UFFICI NUOVI?: COS? DEFINITA DALLA COMMITTENZA SI TROVA AL PI (Italian)
    0 references
    THE PROJECT INVOLVES THERMAL INSULATION OF HORIZONTAL STRUCTURES, IN PARTICULAR THE INSULATION OF THE COVER. OLD COVER? WERE YOU SUBJECT TO ALMOST 30 YEARS OF WEATHER EVENTS THAT CERTAINLY MADE PI? BRITTLE HOW MATERIAL? CARRIED OUT (ASBESTOS). EXISTING COVER? REALISED FROM ANDR ASBESTOS? REMOVED BY QUALIFIED PERSONNEL AND DISPOSED OF IN CERTIFIED TIPS. INSULATION OF THE AVTRR COVERAGE? INSTALLATION OF METAL INSULATED PANELS TO REPLACE THE SUSPENDED CEILING PLATES AND IN ONDULINE WITH CLEAR AND GLOSSY METAL TO REFLECT SOLAR RADIATION: VERR? ISOLATED CONTROL-SOFFITTO PERCH? DOES THE AIR GAP? THIS IS TOO HIGH AND SHOULD THEREFORE BE CONSIDERED AS A COLD TECHNICAL ROOM. ON THE BASIS OF THE ANALYSES CARRIED OUT DURING THE SITE VISIT TO THE TYPES OF INSTALLATION AND ON THE DESTINATIONS (S) OF USE (S)? BE COS? SPLIT: NEW OFFICES?: COS? AS DEFINED BY THE PURCHASING BODY, IT IS FOUND AT THE IP. (English)
    0 references

    Identifiers