(A19_074_2015_0740020_1025) EEAMP; (Q2065816)
Jump to navigation
Jump to search
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | (A19_074_2015_0740020_1025) EEAMP; |
Project in Italy financed by DG Regio |
Statements
50,505.15 Euro
0 references
101,010.29 Euro
0 references
50.0 percent
0 references
3 March 2015
0 references
31 July 2017
0 references
3 March 2017
0 references
ALBERGO ERCOLINI & SAVI SAS DI ARMENTO LUCIA & C
0 references
L?INTERVENTO ANALIZZATO NELLA DIAGNOSI ENERGETICA ? UN INTERVENTO COMBINATO DI EFFICIENZA ENERGETICA E DI UTILIZZO DI ENERGIA RINNOVABILESI ? DECISO DI SOSTITUIRE L?IMPIANTO DI CLIMATIZZAZIONE ESISTENTE, AI PIANI PRIMO, SECONDO TERZO E QUARTO SAR? SOSTITUITO L?ATTUALE SISTEMA VRF CON UNO NUOVO AD ALTA EFFICIENZA E CON GAS FRIGORIGENO ECOLOGICO, AL PIANO TERRENO SARANNO SOSTITUITI DUE ASSORBITORI A GAS METANO PER LA CLIMATIZZAZIONE ESTIVA, MOLTO ENERGIVORI, CON UNA MACCHINA ELETTRICA ARIA/ACQUA AD ALTA EFFICIENZA.L?EDIFICIO IN OGGETTO ? DESTINATO AD ATTIVIT? DI TIPO RICETTIVO, ED ? IN PREVISIONE IL COMPLETO RIFACIMENTO DELL?IMPIANTO DI CLIMATIZZAZIONE ESTIVA ED INVERNALE.GLI IMPIANTI SARANNO INSERITI IN UN CONTESTO EDILIZIO ESISTENTE. IN TALE CONTESTO EDILIZIO SARANNO INSERITI I NUOVI IMPIANTI DI CUI AL PRESENTE PROGETTO, E PRECISAMENTE: A) IMPIANTO DI RISCALDAMENTO E RAFFRESCAMENTO AD ESPANSIONE DIRETTA E FLUSSO DI REFRIGERANTE VARIABILE, CON UNIT? INTERNE PREVALENTEMENTE A PARERE, A S (Italian)
0 references
L? INTERVENTION ANALYSED IN ENERGY DIAGNOSIS? A COMBINED ENERGY EFFICIENCY AND ENERGY USE EFFICIENCY IN THE RINNOVABESI? HAVE YOU DECIDED TO REPLACE THE EXISTING AIR-CONDITIONING SYSTEM, THE FIRST, SECOND AND FOURTH SAR PLANS? REPLACED L? THE CURRENT VRF SYSTEM WITH A NEW HIGH EFFICIENCY, AND WITH CLEAN REFRIGERANT GAS, THE LAND FLOOR WILL BE REPLACED BY TWO GAS SUPPLIERS FOR SUMMER COOLING, HIGHLY ENERGY-INTENSIVE, WITH AN ELECTRICITY-INTENSIVE AIR/WATER MACHINE (EFISENZA.L)? INTENDED TO DO SO? RECEPTIVE, AND? IN VIEW OF THE COMPLETE REFURBISHMENT OF THE AIR-CONDITIONING SYSTEM IN SUMMER, AND INVERNALE.GLI INSTALLATIONS WILL BE INCLUDED IN AN EXISTING BUILDING ENVIRONMENT. IN THIS BUILDING CONTEXT, THE NEW INSTALLATIONS COVERED BY THIS PROJECT WILL BE INCLUDED, NAMELY: (A) DIRECT EXPANSION HEATING AND COOLING SYSTEM AND VARIABLE COOLING FLOW WITH UNIT? INTERNALLY, TO S (English)
0 references
Identifiers
D58I15001420009
0 references