(A19_074_2015_0740012_1017) BELAMP; (Q2065811)

From EU Knowledge Graph
Revision as of 00:23, 9 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Italy financed by DG Regio
Language Label Description Also known as
English
(A19_074_2015_0740012_1017) BELAMP;
Project in Italy financed by DG Regio

    Statements

    0 references
    7,912.87 Euro
    0 references
    15,825.74 Euro
    0 references
    50.0 percent
    0 references
    14 March 2015
    0 references
    30 November 2017
    0 references
    14 March 2017
    0 references
    ERLA SNC DI BARENCO ERIC E CO
    0 references
    0 references
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    ERLA SNC DI BARENCO ERIC ? UNA SOCIET? CHE OPERA NEL SETTORE TURISTICO ALBERGHIERO, NELLO SPECIFICO SVOLGE ATTIVIT? DI AFFITACAMERE E BEB. IL PROGETTO OGGETTO DELLA RICHIESTA DI CONTRIBUTO PREVEDE UNA RISTRUTTURAZIONE DELL'EDIFICIO E CONTESTUALMENTE SI ATTUA UNA RIQUALIFICAZIONE ENERGETICA INTERVENENDO SU DUE FRONTI. IL PRIMO INTERVENTO (SEZIONE A) DELLA SEZIONE 1) SI ATTUA CON LA SOSTITUZIONE DI INFISSI VOLTI ALLA RIDUZIONE DELLA DISPERSIONE DI CALORE, NELL SPECIFICO L'INTERVENTO 1 PREVEDE LA SOSTITUZIONE DELLE CHIUSURE TRASPARENTI COSTITUENTI GLI INFISSI ED I SERRAMENTI DELL?EDIFICIO SECONDARIO CON CHIUSURE TRASPARENTI DI ULTIMA GENERAZIONE CON DOPPIO VETRO (ARIA NELL?INTERCAPEDINE) E TELAIO IN PVC. IN SINTESI SI PREVEDE LA SOSTITUZIONE DI N? 5 INFISSI PER UN TOTALE DI CIRCA 8.7 M2 DI INVOLUCRO VERTICALE TRASPARENTE. IN QUESTI TERMINI SI PREVEDE DI AVERE UNA DIMINUZIONE PER QUELLO CHE RIGUARDA I CONSUMI PER IL RISCALDAMENTO DEGLI AMBIENTI DELL?EDIFICIO SECONDARIO A SEGUITO DI UNA DIM (Italian)
    0 references
    ERIL SNC OF BARENCO ERIC? A SOCIETY? WHO IS ACTIVE IN THE HOTEL SECTOR, IN PARTICULAR, DOES IT WORK? AFITERARE AND BEB. THE PROJECT WHICH IS THE SUBJECT OF THE REQUEST FOR ASSISTANCE PROVIDES FOR A RENOVATION OF THE BUILDING AND, AT THE SAME TIME, ENERGY RENOVATION IS CARRIED OUT ON TWO FRONTS. THE FIRST ACTION (SECTION A) OF SECTION 1) IS IMPLEMENTED WITH THE REPLACEMENT OF WINDOW FRAMES TO REDUCE HEAT LOSS, IN PARTICULAR, ACTION 1 PROVIDES FOR THE REPLACEMENT OF THE TRANSPARENT CLOSURES THAT CONSTITUTE WINDOWS AND WINDOWS OF THE SECONDARY BUILDING WITH TRANSPARENT CLOSURES OF THE LAST GENERATION OF DOUBLE GLASS (AIR IN? GAP) AND PVC CHASSIS. IN SUMMARY, IS THE REPLACEMENT OF N? 5 FRAMES FOR A TOTAL OF APPROXIMATELY 8.7 M2 OF TRANSPARENT VERTICAL ENVELOPE. IN THESE TERMS, IS IT EXPECTED TO HAVE A DECREASE IN THE CONSUMPTION FOR HEATING THE PREMISES OF THE SECONDARY BUILDING FOLLOWING A DIM. (English)
    0 references

    Identifiers