PAMUS2 – Sustainable Mobility Action Plan + Ansion Council Access (Q2877489)

From EU Knowledge Graph
Revision as of 13:41, 20 March 2024 by DG Regio (talk | contribs) (‎Added qualifier: readability score (P590521): 0.0023071356096876)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Project Q2877489 in Portugal
Language Label Description Also known as
English
PAMUS2 – Sustainable Mobility Action Plan + Ansion Council Access
Project Q2877489 in Portugal

    Statements

    0 references
    676,006.32 Euro
    0 references
    795,301.55 Euro
    0 references
    85.0 percent
    0 references
    2 July 2020
    0 references
    31 March 2023
    0 references
    MUNICÍPIO DE ANSIÃO
    0 references

    39°54'40.97"N, 8°26'9.56"W
    0 references
    A presente candidatura, traduz-se nas seguintes ações: Ação A - CONSTRUÇÃO DOS PASSEIOS DA RUA DE SERRADA DA MATA | (CHÃO DE COUCE) Ação B - CONSTRUÇÃO DE PASSEIOS NA CIRCULAR NORTE DE ALVORGE Ação C - CONSTRUÇÃO DOS PASSEIOS DA RUA DE COIMBRA |(AVELAR) Ação D - CONSTRUÇÃO DE PASSEIOS NA RUA DA SILÉ (AVELAR) e Ação E - CONSTRUÇÃO DE PASSEIOS NA RUA DO CEMITÉRIO (SANTIAGO DA GUARDA (Portuguese)
    0 references
    This application is reflected in the following actions: Action A – CONSTRUCTION OF PASSEIOS OF THE MATA SERRADA RUA | (Couce CHION) Action B – CONSTRUCTION OF PASSEIOS IN THE CIRCULAR NORTE Action C – CONSTRUCTION OF THE PASTRUCES OF COIMBRA (Avelop) Action D – CONSTRUCTION OF PASSEI IN THE RUTE OF SILÉ (Action of Peace) (English)
    7 July 2021
    0.0023071356096876
    0 references
    Cette demande se reflète dans les actions suivantes: Action A — CONSTRUCTION DES PASSES DU TRAVAIL DU TRAVAIL DE MARQUE | (CHAN de couce) Action B — CONSTRUCTION DES PASSES AU NORD CIRCULAIRE D’Alvorge Action C — CONSTRUCTION DES PASSES DE TRAVAIL DE COIMBRA |(Avelar) Action D — CONSTRUCTION DES PASSES DANS LE TRAVAIL DE SILEN (Avel) et Action E — PASSUCTION DES PASSES DANS LA CEMITÉRY RUA (GUARDA SANTIAGO) (French)
    5 December 2021
    0 references
    Dieser Antrag spiegelt sich in folgenden Maßnahmen wider: Aktion A – KONSTRUCTION DER PASSES DER Serrade WORK OF MATA | (CHAN de couce) Aktion B – KONSTRUCTION DER PASSES IN DEN KRIRCULAR NORTH OF Alvorge Action C – CONSTRUCTION OF THE PASSES OF COIMBRA WORK |(Avelar) Aktion D – CONSTRUCTION OF PASSES IN DEN WORKEN (Avelt) und Aktion E – PASSUCTION OF PASSES IN DER CEMITÉRY RUA (GUARDA SANTIAGO) (German)
    13 December 2021
    0 references
    Deze toepassing komt tot uiting in de volgende acties: Actie A — CONSTRUCTIE VAN DE PASSES VAN HET Serrade WORK OF MATA | (CHAN de couce) Actie B — CONSTRUCTIE VAN PASSES IN DE CIRCULAR NORTH VAN Alvorge Actie C — CONSTRUCTIE VAN DE PASSES VAN COIMBRA WORK |(Avelar) Actie D — CONSTRUCTIE VAN PASSES IN HET WERK VAN SILEN (Avel) en Actie E — PASSUCTIE VAN PASSES IN DE CEMITÉRY RUA (GUARDA SANTIAGO) (Dutch)
    18 December 2021
    0 references
    Questa domanda si riflette nelle seguenti azioni: Azione A — CONSTRUTAZIONE DELLE PASSE DEL LAVORO DI MATA di Serrade | (CHAN de couce) Azione B — COSTRUZIONE DI PASSE NELLA NORTA CIRCULARE DI ALVORGA Azione C — CONSTRUTAZIONE DELLE PASSI DI COIMBRA |(Avelar) Azione D — COSTRUZIONE DI PASSE NEL LAVORO DI SILEN (Avel) e Azione E — PASSUCAZIONE DI PASSE NEL RUA CEMITARIO (GUARDA SANTIAGO) (Italian)
    17 January 2022
    0 references
    Esta aplicación se refleja en las siguientes acciones: Acción A — CONSTRUCCIÓN DE LOS PASOS DEL TRABAJO DE LA SERRADOR DE MATA | (CHAN de couce) Acción B — CONSTRUCCIÓN DE PASADOS EN EL NORUTO CIRCULAR DE ALvorge Acción C — CONSTRUCCIÓN DE LOS PASOS DE COIMBRA |(Avelar) Acción D — CONSTRUCCIÓN DE PASOS EN EL TRABAJO DE SILEN (Avel) y Acción E — PASSUCCIÓN DE PASAS EN LA CEMITÉRY RUA (GUARDA SANTIAGO) (Spanish)
    20 January 2022
    0 references
    See taotlus kajastub järgmistes tegevustes: Meede A – MATA SERRADA RUA Passeios’e CONSTRUCTION of the MATA SERRADA RUA | (Couce CHION) Action B – Passeios’e CONSTRUCTION of the CIRCULAR NORTE Action C – COIMBRA (Avelop) RASTRUCTION OF COIMBRA (Avelop) tegevus D – SILÉ RUTE (Rahumeede) passei CONSTRUCTION OF CONSTRUCTION of the RUTE OF SILÉ (Rahumeede) (Estonian)
    29 July 2022
    0 references
    Šią paraišką atspindi šie veiksmai: A ieškinys – MATA SERRADA RUA Passeios KONSTRUKCIJA | (Couce CHION) veiksmas B – Passeios KONSTRUKCIJA CIRCULAR NORTE C veiksme – COIMBRA PASTRUKCIJOS (Avelop) KONSTRUKCIJA (Lithuanian)
    29 July 2022
    0 references
    Ta se primjena odražava u sljedećim mjerama: Akcija A – KONSTRUKCIJA Passeiosa MATA SERRADA RUA | (Couce CHION) Akcija B – KONSTRUKCIJA Passeiosa U CIRKULAR NORTE Akcija C – KONSTRUKCIJA PASTRUCIJE COIMBRE (Avelop) Akcija D – KONSTRUKCIJA prolaznika U RUTE OF SILÉ (Akcija mira) (Croatian)
    29 July 2022
    0 references
    Η εφαρμογή αυτή αντικατοπτρίζεται στις ακόλουθες δράσεις: ΔΡΑΣΗ Α — ΚΑΤΑΣΚΕΥΗ ΠΑΣΣΕΙΟΥ ΤΗΣ ΜΑΤΑ ΣΕΡΡΑΔΑ RUA | (Couce CHION) Δράση Β — ΚΑΤΑΣΚΕΥΗ ΤΟΥ ΠΑΣΣΕΙΟΥ ΣΤΗ ΔΡΑΣΗ C — ΚΑΤΑΣΚΕΥΗ ΤΩΝ ΠΑΣΤΡΩΝ ΤΗΣ COIMBRA (Avelop) Δράση Δ — ΚΑΤΑΣΚΕΥΗ ΤΟΥ ΒΑΣΗΣ ΣΤΟ RUTE OF SILÉ (Δράση Ειρήνης) (Greek)
    29 July 2022
    0 references
    Táto žiadosť sa odráža v týchto opatreniach: Akcia A – Stavba Passeios of the MATA SERRADA RUA | (Couce CHION) Opatrenie B – Stavba Passeios v obvodovej NORTE akcii C – Stavba PASTRUCIE COIMBRA (Avelop) Akcia D – Stavba Passei v RUTE SILÉ (Akcia mieru) (Slovak)
    29 July 2022
    0 references
    Tämä hakemus näkyy seuraavissa toimissa: Toimi A – MATA SERRADA RUA | (Couce CHION) – Toimenpide B – Passeioiden hyväksyminen CIRCULAR-NORTE-toimissa C – COIMBRA (Kehitys) – Toimenpide D – Passeioiden hyväksyminen SILÉn RUTE:ssa (Rauhanteko) (Finnish)
    29 July 2022
    0 references
    Wniosek ten znajduje odzwierciedlenie w następujących działaniach: Działanie A – KONTRUKCJA Pasei SERRADY RUA MATA | (Couce CHION) Działanie B – KONTRUKCJA Przepustów w działaniu C – KONTRUKCJA PASTRUKCJI COIMBRY (Avelop) Działanie D – KONTRUKCJA passei w RUTE OF SILÉ (Działanie Pokoju) (Polish)
    29 July 2022
    0 references
    Ezt az alkalmazást a következő intézkedések tükrözik: A. intézkedés – A MATA SERRADA RUA Passeios SZERZŐDÉSE | (Couce CHION) B. fellépés – Passeiók CONSTRUCTION IN THE CIRCULAR NORTE Action C – A COIMBRA (Avelop) PASTRUCCIÓK D. fellépése – Passei-nek a SILÉ RUTE-jában (békecselekvés) (Hungarian)
    29 July 2022
    0 references
    Tato žádost se odráží v následujících opatřeních: Akce A – Stav Passeios of the MATA SERRADA RUA | (Couce CHION) Akce B – Stav Passeios in the CIRCULAR NORTE Action C – Stavba PASTRUCES COIMBRA (Avelop) Akce D – Zpracování pasáží v SILÉ (Action of Peace) (Czech)
    29 July 2022
    0 references
    Šis pieteikums ir atspoguļots šādās darbībās: A darbība — MATA SERRADA RUA KONSTRUCTION OF Passeios | (Couce CHION) darbība B — Passeios izmantošana CIRCULAR NORTE darbībā C — COIMBRA (Avelop) PASTRUCTION (Avelop) darbība D — Passei izmantošana SILÉ RUTE (Miera darbība) (Latvian)
    29 July 2022
    0 references
    Léirítear an t-iarratas sin sna gníomhaíochtaí seo a leanas: Gníomhaíocht A — CONSTRUCTION OF Passeios OF THE MATA Serrada RUA | (couce Chion) Gníomh B — TÓGÁIL OF Passeios IN the CIRCULAR NORTE Action C — CONSTRUCTION of the PASTRUCES of COIMBRA (Avelop) D — CONSTRUCTION OF PASSEI IN RUTE SILÉ (Gníomh na Síochána) (Irish)
    29 July 2022
    0 references
    Ta vloga se odraža v naslednjih ukrepih: Akcija A – KONSTRUKCIJA Passeios of the MATA SERRADA RUA | (Couce CHION) Akcija B – Vključitev pasej v CIRCULAR NORTE akciji C – Napoved PASTRUKCIJE COIMBRE (Avelop) Akcija D – Napoved prepustnic v SILEJI (Ukrep za mir) (Slovenian)
    29 July 2022
    0 references
    Това заявление е отразено в следните действия: Действие А — КОНСТРУКЦИЯ НА паспортите на MATA SERRADA RUA | (Couce CHION) Действие Б — КОНСТРУКЦИЯ НА Пасейите в действие C на CIRCULAR NORTE — КОНСТРУКТУЦИЯ НА ПАСТРУЧИТЕ НА КОИМБРА (Avelop) Действие Г — КОНСТРУКЦИЯ НА пастей в участъка на Силите (действие на мира) (Bulgarian)
    29 July 2022
    0 references
    Din l-applikazzjoni hija riflessa fl-azzjonijiet li ġejjin: Azzjoni A — CONSTRUCTION OF Passeios of the MATA SERRADA RUA | (Couce CHION) Azzjoni B — CONSTRUCTION OF Passeios in the CIRCULAR NORTE Action C — CONSTRUCTION TAL-PASTRUCES TAL-COIMBRA (Żvilupp) Azzjoni D — CONSTRUCTION OF passei FL-RUTE TA’ SILE (Azzjoni ta’ Paċi) (Maltese)
    29 July 2022
    0 references
    Denne ansøgning afspejles i følgende foranstaltninger: Aktion A — KONSTRUCTION AF Passeios AF MATA SERRADA RUA | (Couce CHION) Aktion B — KONSTRUCTION af Passeios i CIRCULAR NORTE Aktion C — KONSTRUCTION AF PASTRUCES AF COIMBRA (Udvikling) Aktion D — KONSTRUCTION af passi i SILÉ (aktion af fred) (Danish)
    29 July 2022
    0 references
    Această aplicație se reflectă în următoarele acțiuni: Acțiunea A – CONSTRUCȚIA Pasiunilor MATA SERRADA RUA | (Couce CHION) Acțiunea B – CONSTRUCȚIA Paseelor în acțiunea C NORTE CIRCULARă – CONSTRUCȚIA PASTRUCĂLOR COIMBRA (Avelop) Acțiunea D – CONSTRUCȚIA Passei ÎN RUTEUL SILEI (Acțiunea Păcii) (Romanian)
    29 July 2022
    0 references
    Denna ansökan återspeglas i följande åtgärder: Åtgärd A – CONSTRUCTION OF Passeios of the MATA SERRADA RUA | (Couce CHION) Action B – CONSTRUCTION of Passeios in the CIRCULAR NORTE Action C – CONSTRUCTION OF THE PASTRUCES OF COIMBRA (Avelop) Action D – CONSTRUCTION OF Passei IN THE RUTE OF SILÉ (Fredelseåtgärd) (Swedish)
    29 July 2022
    0 references
    Ansião
    0 references
    14 November 2023
    0 references

    Identifiers

    CENTRO-06-1406-FEDER-000081
    0 references