SUPPRESSANTS INDUSTRIALISATION OF CAFFÃO MOKA (Q2033446)

From EU Knowledge Graph
Revision as of 18:20, 8 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Italy financed by DG Regio
Language Label Description Also known as
English
SUPPRESSANTS INDUSTRIALISATION OF CAFFÃO MOKA
Project in Italy financed by DG Regio

    Statements

    0 references
    25,838.89 Euro
    0 references
    51,677.79 Euro
    0 references
    50.0 percent
    0 references
    12 December 2017
    0 references
    18 June 2019
    0 references
    18 March 2019
    0 references
    CAFFEMOTIVE S.R.L.
    0 references
    0 references

    45°40'37.52"N, 13°45'12.31"E
    0 references
    IL PROGETTO DI INDUSTRIALIZZAZIONE PREVEDE DI INDUSTRIALIZZARE IL SISTEMA DI CONFEZIONAMENTO DELLE COMPRESSE, NONCHé, AL FINE DI POTER RENDERE TALE SISTEMA COMPLETAMENTE OPERATIVO, PREVEDE ANCHE DI REALIZZARE DEGLI INVESTIMENTI PER COMPLETARE LA PRIMA LINEA DI PRODUZIONE DELLE COMPRESSE ED ALLESTIRE UNA SECONDA LINEA COMPLETA, PIù ALCUNE ATTREZZATURE STRUMENTALI ALLA PRODUZIONE E AL CONFEZIONAMENTO. (Italian)
    0 references
    THE DRAFT INDUSTRIALISATION PLANS TO INDUSTRIALISE THE PACKAGING SYSTEM OF THE TABLETS, IN ORDER TO BE ABLE TO MAKE THIS SYSTEM FULLY OPERATIONAL, AND TO MAKE INVESTMENTS IN ORDER TO COMPLETE THE FIRST LINE OF PRODUCTION OF THE TABLETS AND TO SET UP A COMPLETE SECOND LINE, PLUS SOME EQUIPMENT FOR PRODUCTION AND PACKAGING. (English)
    0 references

    Identifiers

    D83D18000080007
    0 references