Construction of a digital logistics centre from the point of view of Industry 4.0 (Q3060942)

From EU Knowledge Graph
Revision as of 12:29, 7 March 2024 by DG Regio (talk | contribs) (‎Added qualifier: readability score (P590521): 0.0116524013509349)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Project Q3060942 in Austria
Language Label Description Also known as
English
Construction of a digital logistics centre from the point of view of Industry 4.0
Project Q3060942 in Austria

    Statements

    0 references
    4,500,000.0 Euro
    0 references
    20 July 2016
    0 references
    30 November 2018
    0 references
    Ringana GmbH, Ringana Holding GmbH
    0 references
    0 references

    47°16'51.38"N, 15°58'9.05"E
    0 references
    62219
    0 references
    At the production site of Ringana GmbH, a logistics center is to be built from the point of view of Industry 4.0. (English)
    20 July 2021
    0.0116524013509349
    0 references
    Sur le site de production de Ringana GmbH, il est prévu de construire un centre logistique sous l’angle de l’industrie 4.0. (French)
    27 November 2021
    0 references
    Op de productielocatie van Ringana GmbH wordt vanuit het oogpunt van Industrie 4.0 een logistiek centrum gebouwd. (Dutch)
    29 November 2021
    0 references
    Am Produktionsstandort der Ringana GmbH soll ein Logistikzentrum unter den Gesichtspunkten von Industrie 4.0 errichtet werden. (German)
    0 references
    Presso lo stabilimento produttivo di Ringana GmbH, un centro logistico deve essere costruito dal punto di vista dell'Industria 4.0. (Italian)
    11 January 2022
    0 references
    En la planta de producción de Ringana GmbH se construirá un centro logístico desde el punto de vista de la Industria 4.0. (Spanish)
    12 January 2022
    0 references
    Στη μονάδα παραγωγής της Ringana GmbH, πρόκειται να κατασκευαστεί ένα κέντρο εφοδιαστικής από την άποψη της Βιομηχανίας 4.0. (Greek)
    17 August 2022
    0 references
    På Ringana GmbH's produktionssted skal der bygges et logistikcenter ud fra Industri 4.0's synspunkt. (Danish)
    17 August 2022
    0 references
    Ringana GmbH:n tuotantolaitokselle rakennetaan logistiikkakeskus Industry 4.0:n näkökulmasta. (Finnish)
    17 August 2022
    0 references
    Fis-sit tal-produzzjoni ta’ Ringana GmbH, għandu jinbena ċentru loġistiku mill-perspettiva tal-Industrija 4.0. (Maltese)
    17 August 2022
    0 references
    Ringana GmbH ražotnē tiks būvēts loģistikas centrs no Rūpniecības 4.0 viedokļa. (Latvian)
    17 August 2022
    0 references
    Vo výrobnom závode spoločnosti Ringana GmbH sa má vybudovať logistické centrum z hľadiska Priemysel 4.0. (Slovak)
    17 August 2022
    0 references
    Ag láithreán táirgthe Ringana GmbH, tá ionad lóistíochta le tógáil ó thaobh Tionscail 4.0. (Irish)
    17 August 2022
    0 references
    Ve výrobním závodě společnosti Ringana GmbH má být z hlediska Průmyslu 4.0 vybudováno logistické centrum. (Czech)
    17 August 2022
    0 references
    No local de produção da Ringana GmbH, um centro logístico deve ser construído do ponto de vista da Indústria 4.0. (Portuguese)
    17 August 2022
    0 references
    Ringana GmbH tootmiskohas ehitatakse logistikakeskus tööstuse 4.0 vaatepunktist. (Estonian)
    17 August 2022
    0 references
    A Ringana GmbH gyártási telephelyén logisztikai központot építenek az Ipar 4.0 szemszögéből. (Hungarian)
    17 August 2022
    0 references
    В производствения обект на Ringana GmbH е предвиден изграждането на логистичен център от гледна точка на Индустрия 4.0. (Bulgarian)
    17 August 2022
    0 references
    „Ringana GmbH“ gamybos vietoje bus pastatytas logistikos centras „Pramonės 4.0“ požiūriu. (Lithuanian)
    17 August 2022
    0 references
    Na proizvodnoj lokaciji tvrtke Ringana GmbH gradi se logistički centar sa stajališta industrije 4.0. (Croatian)
    17 August 2022
    0 references
    På Ringana GmbH:s produktionsanläggning ska ett logistikcenter byggas utifrån Industri 4.0. (Swedish)
    17 August 2022
    0 references
    La sediul de producție al Ringana GmbH, se va construi un centru logistic din punctul de vedere al Industriei 4.0. (Romanian)
    17 August 2022
    0 references
    Na proizvodni lokaciji podjetja Ringana GmbH je treba z vidika industrije 4.0 zgraditi logistični center. (Slovenian)
    17 August 2022
    0 references
    W zakładzie produkcyjnym Ringana GmbH, centrum logistyczne ma być zbudowany z punktu widzenia Przemysłu 4.0. (Polish)
    17 August 2022
    0 references
    Hartberg
    0 references

    Identifiers

    AUST-654
    0 references