ELECTRIC STATION PICERNO (Q2021711)

From EU Knowledge Graph
Revision as of 15:59, 8 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Italy financed by DG Regio
Language Label Description Also known as
English
ELECTRIC STATION PICERNO
Project in Italy financed by DG Regio

    Statements

    0 references
    5,784,236.38 Euro
    0 references
    7,829,660.8 Euro
    0 references
    73.88 percent
    0 references
    6 September 2017
    0 references
    31 July 2019
    0 references
    TERNA - RETE ELETTRICA NAZIONALE
    0 references
    0 references

    40°38'18.46"N, 15°38'9.13"E
    0 references
    L'INTERVENTO RIGUARDA LA REALIZZAZIONE DI UNA NUOVA STAZIONE RTN IN DOPPIA SBARRA A 150 KV DA INSERIRE IN ENTRA-ESCE SUI NUOVI COLLEGAMENTI A 150 KV 'CP TITO SMISTAMENTO-CP AVIGLIANO' E 'CP TITO SMISTAMENTO-TANAGRO'.LA REALIZZAZIONE DI TALE STAZIONE SI RENDE NECESSARIA PER AUMENTARE L'AFFIDABILITà DELLA RTN IN UN'AREA NELLA QUALE VI Ê UN'ELEVATA RICHIESTA DI CONNESSIONI (STMG APPROVATE PER 479 MW) OLTRE A PREVENTIVI ACCETTATI DAL DISTRIBUTORE (63 MW SULLA RETE AT E 6 MW SULLA RETE BTBT) CHE, IN ASSENZA DELL'OPERA IN ESAME, NON POTREBBERO ESSERE IMMESSE IN RETE A CAUSA DELLA LIMITATA PORTATA DELLE DIRETTRICI 150 KV 'TANAGRO-POTENZA' E 'TANAGRO-TITO-POTENZA' CHE HANNO UNA CAPACITà DI TRASPORTO NOMINALE DI CIRCA 145 MW CIASCUNA, PER UN TOTALE COMPLESSIVO PARI A 290 MW.L'INTERVENTO OLTRE ALLA REALIZZAZIONE DELLA NUOVA S.E. RIGUARDERà ANCHE LA REALIZZAZIONE DEI RELATIVI RACCORDI I CUI TRACCIATI SI DIRAMANO DAI DUE ELETTRODOTTI ESISTENTI TITO SMISTAMENTO-AVIGLIANO E TITO SMISTAMENTO-TA (Italian)
    0 references
    THE INTERVENTION CONCERNS THE CONSTRUCTION OF A NEW 150 KV DOUBLE RAIL NETWORK STATION TO BE INTEGRATED INTO ENTRA-ESEC ON THE NEW 150 KV ‘CP TITO SMISTINGTO-CP AVILIANO’ AND ‘CP TITO SMISTINGTO-TANAGRO’. THE CONSTRUCTION OF THIS STATION IS NECESSARY TO INCREASE L’AFFIDABILITY IN AN AREA WHERE THERE IS A HIGH DEMAND FOR CONNECTIONS (479 MW ON THE TA NETWORK AND 6 MW ON THE BTBT NETWORK), WHICH, IN THE ABSENCE OF THE WORK IN QUESTION, CANNOT BE PLACED ON THE NETWORK BECAUSE OF THE LIMITED SCOPE OF THE 63 KV GUIDELINES ‘TANAGRO-JUDGMENT’ AND ‘TANAGRO-TITO-POWERED’, WHICH ALSO HAVE THE CONNECTIONS SET OUT IN THE TWO EXISTING LINES, TITO SMISTINGTO-AVIOGLIANO AND TITO SMISTINGTO-TA. (English)
    0 references

    Identifiers

    G83G17000880007
    0 references