Construction of infrastructure for the production of electricity from renewable sources on public buildings in Rudnik Municipality (Q123770)

From EU Knowledge Graph
Revision as of 14:31, 13 December 2023 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project Q123770 in Poland
Language Label Description Also known as
English
Construction of infrastructure for the production of electricity from renewable sources on public buildings in Rudnik Municipality
Project Q123770 in Poland

    Statements

    0 references
    489,002.27 zloty
    0 references
    108,705.2 Euro
    13 January 2020
    0 references
    575,296.77 zloty
    0 references
    127,888.47 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    10 October 2018
    0 references
    30 November 2020
    0 references
    GMINA RUDNIK
    0 references

    50°9'15.8"N, 18°10'13.8"E
    0 references

    50°5'13.09"N, 18°12'0.29"E
    0 references
    Projekt polega na montażu instalacji fotowoltaicznych wpiętych do sieci na 10-ciu budynkach użyteczności publicznej w gminie Rudnik: a) Budynek biurowo-mieszkalny- GOPS w Rudniku, ul. Arc.Gawliny 2a, Rudnik 47-411 b) Budynek biurowo-mieszkalny- ZWiUK w Rudniku, ul. Arc.Gawliny 2a, Rudnik 47-411 c) Budynek Urzędu Gminy w Rudniku, ul. Kozielska 1, Rudnik 47-411 d) Sala gimnastyczna przy SP w Rudniku, ul. Słoneczna 1, Rudnik 47-411 e) Szkoła Podstawowa w Rudniku, ul. Słoneczna 1, Rudnik 47-411 f) Sala gimnastyczna przy SP w Grzegorzowicach, ul. Powst. Śląskich 22, Grzegorzowice 47-411 g) Szkoła Podstawowa w Grzegorzowicach, ul. Powst. Śląskich 22, Grzegorzowice 47-411 h) Szkoła Podstawowa w Brzeźnicy, ul. Kozielska 11, Brzeźnica 47-411 i) SPZLA w Rudniku, ul. Kozielska 2a, Rudnik 47-411 j) SPZLA w Łubowicach, ul. Młyńska 1, Grzegorzowice 47-411 Planowany termin zakończenia projektu - 10. 2020r. W budynkach/lokalach, dla których dublują się adresy zamontowane są niezależne liczniki (Polish)
    0 references
    The project consists of assembling photovoltaic installations plugged into the grid on 10 public buildings in Rudnik commune: a) Office and residential building – GOPS in Rudnik, ul. Arc.Gawliny 2a, Rudnik 47-411 b) Office and residential building- ZWiUK in Rudnik, ul. Arc.Gawliny 2a, Rudnik 47-411 c) Building of the Municipal Office in Rudnik, ul. Kozielska 1, Rudnik 47-411 d) Gymnastics hall at the SP in Rudnik, ul. Sunny 1, Rudnik 47-411 e) Primary school in Rudnik, ul. Sunny 1, Rudnik 47-411 f) Gymnastics hall at the SP in Grzegorzowice, ul. Oh, stop it. Śląskskie 22, Grzegorzowice 47-411 g) Primary School in Grzegorzowice, ul. Oh, stop it. Śląskskie 22, Grzegorzowice 47-411 h) Primary School in Brzeźnica, ul. Kozielska 11, Brzeźnica 47-411 i) SPZLA in Rudnik, ul. Kozielska 2a, Rudnik 47-411 j) SPZLA in Łubowice, ul. Młyńska 1, Grzegorzowice 47-411 The planned completion date of the project – 10. 2020. Independent counters are installed in buildings/locals for which addresses are duplicated (English)
    21 October 2020
    0 references
    Le projet consiste en l’installation d’installations photovoltaïques reliées au réseau sur 10 bâtiments publics de la commune de Rudnik: a) Bâtiment de bureaux et résidentiels — GOPS à Rudnik, ul. Arc.Gawliny 2a, Rudnik 47-411 b) Bâtiment de bureaux et d’habitation — ZWiUK à Rudnik, ul. Arc.Gawliny 2a, Rudnik 47-411 c) Bâtiment du bureau municipal de Rudnik, ul. Kozielska 1, Rudnik 47-411 d) Gymnasium au SP à Rudnik, ul. Solar 1, Rudnik 47-411 e) École primaire à Rudnik, ul. Solar 1, Rudnik 47-411 f) Gymnasium au SP à Grzegorzowice, ul. C’est une retenue. Śląskich 22, Grzegorzowice 47-411 g) École primaire à Grzegorzowice, ul. C’est une retenue. Śląskich 22, Grzegorzowice 47-411 h) Ecole primaire à Brze’nica, ul. Kozielska 11, Brze’nica 47-411 i) SPZLA à Rudnik, ul. Kozielska 2a, Rudnik 47-411 j) SPZLA à Łubowice, ul. Młyńska 1, Grzegorzowice 47-411 La date prévue d’achèvement du projet — 10. Vous tous en 2020. Des compteurs indépendants sont installés dans les bâtiments/locaux pour lesquels les adresses sont dupliquées. (French)
    2 December 2021
    0 references
    Das Projekt besteht aus der Installation von Photovoltaik-Anlagen, die an das Netzwerk an 10 öffentlichen Gebäuden in der Gemeinde Rudnik angeschlossen sind: A) Büro- und Wohngebäude – GOPS in Rudnik, ul. Arc.Gawliny 2a, Rudnik 47-411 b) Büro- und Wohngebäude- ZWiUK in Rudnik, ul. Arc.Gawliny 2a, Rudnik 47-411 c) Gebäude des Gemeindeamtes in Rudnik, ul. Kozielska 1, Rudnik 47-411 d) Gymnasium bei SP in Rudnik, ul. Solar 1, Rudnik 47-411 e) Grundschule in Rudnik, ul. Solar 1, Rudnik 47-411 f) Gymnasium am SP in Grzegorzowice, ul. Es ist eine Zurückhaltung. Śląskich 22, Grzegorzowice 47-411 g) Grundschule in Grzegorzowice, ul. Es ist eine Zurückhaltung. Śląskich 22, Grzegorzowice 47-411 h) Grundschule in Brzeźnica, ul. Kozielska 11, Brzeźnica 47-411 i) SPZLA in Rudnik, ul. Kozielska 2a, Rudnik 47-411 j) SPZLA in Łubowice, ul. Młyńska 1, Grzegorzowice 47-411 Der geplante Fertigstellungstermin – 10. Alles im Jahr 2020. Unabhängige Zähler werden in Gebäuden/Lokalen installiert, für die Adressen dupliziert werden. (German)
    8 December 2021
    0 references
    Het project bestaat uit de installatie van fotovoltaïsche installaties verbonden met het netwerk op 10 openbare gebouwen in de gemeente Rudnik: A) Kantoor- en woongebouw- GOPS in Rudnik, ul. Arc.Gawliny 2a, Rudnik 47-411 b) Kantoor- en woongebouw- ZWiUK in Rudnik, ul. Arc.Gawliny 2a, Rudnik 47-411 c) Gebouw van het gemeentekantoor in Rudnik, ul. Kozielska 1, Rudnik 47-411 d) Gymnasium bij SP in Rudnik, ul. Solar 1, Rudnik 47-411 e) Basisschool in Rudnik, ul. Solar 1, Rudnik 47-411 f) Gymnasium bij de SP in Grzegorzowice, ul. Het is een terughoudendheid. Śląskich 22, Grzegorzowice 47-411 g) Basisschool in Grzegorzowice, ul. Het is een terughoudendheid. Śląskich 22, Grzegorzowice 47-411 h) Basisschool in Brzeźnica, ul. Kozielska 11, Brzeźnica 47-411 i) SPZLA in Rudnik, ul. Kozielska 2a, Rudnik 47-411 j) SPZLA in Łubowice, ul. Młyńska 1, Grzegorzowice 47-411 De geplande voltooiingsdatum van het project — 10. Jullie allemaal in 2020. Onafhankelijke meters worden geïnstalleerd in gebouwen/lokalen waarvoor adressen worden gedupliceerd. (Dutch)
    17 December 2021
    0 references
    Il progetto consiste nell'installazione di impianti fotovoltaici collegati alla rete su 10 edifici pubblici del comune di Rudnik: a) Ufficio e edificio residenziale — GOPS a Rudnik, ul. Arc.Gawliny 2a, Rudnik 47-411 b) Ufficio e edificio residenziale- ZWiUK a Rudnik, ul. Arc.Gawliny 2a, Rudnik 47-411 c) Edificio dell'Ufficio Comunale di Rudnik, ul. Kozielska 1, Rudnik 47-411 d) Palestra presso SP a Rudnik, ul. Solar 1, Rudnik 47-411 e) Scuola primaria a Rudnik, ul. Solar 1, Rudnik 47-411 f) Palestra presso la SP a Grzegorzowice, ul. È una moderazione. Śląskich 22, Grzegorzowice 47-411 g) Scuola primaria a Grzegorzowice, ul. È una moderazione. Śląskich 22, Grzegorzowice 47-411 h) Scuola primaria a Brzeźnica, ul. Kozielska 11, Brzeźnica 47-411 i) SPZLA in Rudnik, ul. Kozielska 2a, Rudnik 47-411 j) SPZLA a Łubowice, ul. Młyńska 1, Grzegorzowice 47-411 La data prevista di completamento del progetto — 10. Tutti nel 2020. I contatori indipendenti sono installati in edifici/locali per i quali gli indirizzi sono duplicati. (Italian)
    15 January 2022
    0 references
    El proyecto consiste en la instalación de instalaciones fotovoltaicas conectadas a la red en 10 edificios públicos del municipio de Rudnik: a) Edificio de oficinas y viviendas- GOPS en Rudnik, ul. Arc.Gawliny 2.a, Rudnik 47-411 b) Edificio de oficinas y viviendas — ZWiUK en Rudnik, ul. Arc.Gawliny 2.a, Rudnik 47-411 c) Edificio de la Oficina Municipal en Rudnik, ul. Kozielska 1, Rudnik 47-411 d) Gimnasio en SP en Rudnik, ul. Solar 1, Rudnik 47-411 e) Escuela Primaria en Rudnik, ul. Solar 1, Rudnik 47-411 f) Gimnasio en el SP en Grzegorzowice, ul. Es una restricción. Śląskich 22, Grzegorzowice 47-411 g) Escuela Primaria en Grzegorzowice, ul. Es una restricción. Śląskich 22, Grzegorzowice 47-411 h) Escuela Primaria en Brzeșnica, ul. Kozielska 11, Brzeżnica 47-411 i) SPZLA en Rudnik, ul. Kozielska 2.a, Rudnik 47-411 j) SPZLA en Łubowice, ul. Młyńska 1, Grzegorzowice 47-411 La fecha prevista de finalización del proyecto — 10. Todos en 2020. Los contadores independientes se instalan en edificios/locales para los que se duplican las direcciones. (Spanish)
    18 January 2022
    0 references
    Projektet består i installation af solcelleanlæg, der er tilsluttet nettet på 10 offentlige bygninger i Rudnik kommune: a) Kontor- og beboelsesbygning — GOPS i Rudnik, ul. Arc.Gawliny 2a, Rudnik 47-411 b) Kontor og beboelsesejendom — ZWiUK i Rudnik, ul. Arc.Gawliny 2a, Rudnik 47-411 c) Bygningen af det kommunale kontor i Rudnik, ul. Kozielska 1, Rudnik 47-411 d) Gymnasium ved SP i Rudnik, ul. Solar 1, Rudnik 47-411 e) Primærskole i Rudnik, ul. Solar 1, Rudnik 47-411 f) Gymnasium ved SP i Grzegorzowice, ul. Det er en tilbageholdenhed. Śląskich 22, Grzegorzowice 47-411 g) Primærskole i Grzegorzowice, ul. Det er en tilbageholdenhed. Śląskich 22, Grzegorzowice 47-411 h) Primary School i Brzeźnica, ul. Begivenheder i Rudnik 11, Brzeźnica 47-411 i) SPZLA in Rudnik, ul. Kozielska 2a, Rudnik 47-411 j) SPZLA in Łubowice, ul. Młyńska 1, Grzegorzowice 47-411 Den planlagte dato for projektets færdiggørelse — 10. I'alle i 2020. Uafhængige målere installeres i bygninger/lokaler, hvor adresserne duplikeres. (Danish)
    2 July 2022
    0 references
    Το έργο συνίσταται στην εγκατάσταση φωτοβολταϊκών εγκαταστάσεων που συνδέονται με το δίκτυο σε 10 δημόσια κτίρια του δήμου Rudnik: α) Γραφείο και κτίριο κατοικιών- GOPS στο Rudnik, ul. Arc.Gawliny 2a, Rudnik 47-411 β) Γραφείο και κτίριο κατοικιών- ZWiUK στο Rudnik, ul. Arc.Gawliny 2a, Rudnik 47-411 c) Κτίριο του Δημοτικού Γραφείου στο Rudnik, ul. Kozielska 1, Rudnik 47-411 δ) Γυμνάσιο στο SP στο Rudnik, ul. Solar 1, Rudnik 47-411 e) Δημοτικό σχολείο στο Rudnik, ul. Solar 1, Rudnik 47-411 f) Γυμνάσιο στο SP στο Grzegorzowice, ul. Είναι αυτοσυγκράτηση. Grzegorzowice 47-411 g) Δημοτικό σχολείο στο Grzegorzowice, ul. Είναι αυτοσυγκράτηση. Iląskich 22, Grzegorzowice 47-411 h) Δημοτικό σχολείο στην Brzennnica, ul. Kozielska 11, Brzeрnica 47-411 i) SPZLA στο Rudnik, ul. Kozielska 2a, Rudnik 47-411 j) SPZLA στο Łubowice, ul. Młyńska 1, Grzegorzowice 47-411 Η προγραμματισμένη ημερομηνία ολοκλήρωσης του έργου — 10. Όλοι το 2020. Ανεξάρτητοι μετρητές εγκαθίστανται σε κτίρια/τοπικούς για τους οποίους διευκρινίζονται οι διευθύνσεις. (Greek)
    2 July 2022
    0 references
    Projekt se sastoji od ugradnje fotonaponskih instalacija priključenih na mrežu na 10 javnih zgrada u općini Rudnik: a) Ured i stambena zgrada- GOPS u Rudniku, ul. Arc.Gawliny 2a, Rudnik 47 – 411 b) Ured i stambena zgrada- ZWiUK u Rudniku, ul. Arc.Gawliny 2a, Rudnik 47 – 411 c) Zgrada Općinskog ureda u Rudniku, ul. Kozielska 1, Rudnik 47 – 411 d) Gimnazija na SP u Rudniku, ul. Solar 1, Rudnik 47 – 411 e) Osnovna škola u Rudniku, ul. Solarni 1, Rudnik 47 – 411 f) Gimnazija na SP u Grzegorzowicama, ul. To je suzdržanost. Śląskich 22, Grzegorzowice 47 – 411 g) Osnovna škola u Grzegorzowicama, ul. To je suzdržanost. Śląskich 22, Grzegorzowice 47 – 411 h) Osnovna škola u Brzeňnici, ul. Kozielska 11, Brzeňnica 47 – 411 i) SPZLA u Rudniku, ul. Kozielska 2a, Rudnik 47 – 411 j) SPZLA u Łubowicama, ul. Młyńska 1, Grzegorzowice 47 – 411 Planirani datum završetka projekta – 10. Y’all u 2020. Neovisna brojila ugrađuju se u zgrade/lokalne objekte za koje se udvostručuju adrese. (Croatian)
    2 July 2022
    0 references
    Proiectul constă în instalarea instalațiilor fotovoltaice conectate la rețea pe 10 clădiri publice din comuna Rudnik: a) clădire de birouri și rezidențială – GOPS în Rudnik, ul. Arc.Gawliny 2a, Rudnik 47-411 b) Birou și clădire rezidențială – ZWiUK în Rudnik, ul. Arc.Gawliny 2a, Rudnik 47-411 c) Clădirea Oficiului Municipal din Rudnik, ul. Kozielska 1, Rudnik 47-411 d) Gimnaziu la SP în Rudnik, ul. Solar 1, Rudnik 47-411 e) Școala primară din Rudnik, ul. Solar 1, Rudnik 47-411 f) Gimnaziu la SP în Grzegorzowice, ul. E o restricție. Śląskich 22, Grzegorzowice 47-411 g) Școala primară din Grzegorzowice, ul. E o restricție. Śląskich 22, Grzegorzowice 47-411 h) Școala primară din Brzeźnica, ul. Kozielska 11, Brzeźnica 47-411 i) SPZLA în Rudnik, ul. Kozielska 2a, Rudnik 47-411 j) SPZLA în Łubowice, ul. Młyńska 1, Grzegorzowice 47-411 Data planificată de finalizare a proiectului – 10. Voi toți în 2020. Sunt instalate contoare independente în clădiri/locale pentru care adresele sunt duplicate. (Romanian)
    2 July 2022
    0 references
    Projekt pozostáva z inštalácie fotovoltických zariadení pripojených k sieti na 10 verejných budovách v obci Rudnik: a) Kancelársky a bytový dom- GOPS v Rudniku, ul. Arc.Gawliny 2a, Rudnik 47 – 411 b) Kancelársky a bytový dom- ZWiUK v Rudnik, ul. Arc.Gawliny 2a, Rudnik 47 – 411 c) Budova mestského úradu v Rudniku, ul. Kozielska 1, Rudnik 47 – 411 d) Gymnázia na SP v Rudnik, ul. Solar 1, Rudnik 47 – 411 e) Základná škola v Rudnik, ul. Solar 1, Rudnik 47 – 411 f) Gymnasium na SP v Grzegorzowice, ul. Je to zdržanlivosť. Šląskich 22, Grzegorzowice 47 – 411 g) Základná škola v Grzegorzowiciach, ul. Je to zdržanlivosť. Šląskich 22, Grzegorzowice 47 – 411 h) Základná škola v Brzeźnici, ul. Kozielska 11, Brzeźnica 47 – 411 i) SPZLA v Rudnik, ul. Kozielska 2a, Rudnik 47 – 411 j) SPZLA in Łubowice, ul. Młyńska 1, Grzegorzowice 47 – 411 Plánovaný termín dokončenia projektu – 10. Vy všetci v roku 2020. Nezávislé merače sú inštalované v budovách/miestnostiach, pre ktoré sú adresy duplikované. (Slovak)
    2 July 2022
    0 references
    Il-proġett jikkonsisti fl-installazzjoni ta’ installazzjonijiet fotovoltajċi konnessi man-netwerk f’għaxar binjiet pubbliċi fil-muniċipalità ta’ Rudnik: a) Uffiċċju u bini residenzjali — GOPS f’Rudnik, ul. Arc.Gawliny 2a, Rudnik 47–411 b) Uffiċċju u bini residenzjali — ZWiUK f’Rudnik, ul. Arc.Gawliny 2a, Rudnik 47–411 c) Il-bini tal-Uffiċċju Muniċipali f’Rudnik, ul. Kozielska 1, Rudnik 47–411 d) Gymnasium fl-SP f’Rudnik, ul. Solar 1, Rudnik 47–411 e) Skola Primarja f’Rudnik, ul. Solar 1, Rudnik 47–411 f) Gymnasium fl-SP fi Grzegorzowice, ul. Huwa trażżin. Śląskich 22, Grzegorzowice 47–411 g) Skola Primarja fi Grzegorzowice, ul. Huwa trażżin. Śląskich 22, Grzegorzowice 47–411 h) Skola Primarja fi Brzeźnica, ul. Kozielska 11, Brzeźnica 47–411 i) SPZLA f’Rudnik, ul. Kozielska 2a, Rudnik 47–411 j) SPZLA f’Łubowice, ul. Młyńska 1, Grzegorzowice 47–411 Id-data ppjanata għat-tlestija tal-proġett — 10. Y’all fl-2020. Miters indipendenti huma installati fil-bini/lokali li għalihom l-indirizzi huma duplikati. (Maltese)
    2 July 2022
    0 references
    O projeto consiste na instalação de instalações fotovoltaicas ligadas à rede em 10 edifícios públicos do município de Rudnik: a) Edifício de escritórios e residenciais — GOPS em Rudnik, ul. Arc.Gawliny 2a, Rudnik 47-411 b) Edifício de escritórios e residenciais- ZWiUK em Rudnik, ul. Arc.Gawliny 2a, Rudnik 47-411 c) Edifício do Escritório Municipal em Rudnik, ul. Kozielska 1, Rudnik 47-411 d) Ginásio em SP em Rudnik, ul. Solar 1, Rudnik 47-411 e) Escola Primária em Rudnik, ul. Solar 1, Rudnik 47-411 f) Ginásio no SP em Grzegorzowice, ul. É uma restrição. Śląskich 22, Grzegorzowice 47-411 g) Escola Primária em Grzegorzowice, ul. É uma restrição. Śląskich 22, Grzegorzowice 47-411 h) Escola Primária em Brzeźnica, ul. Kozielska 11, Brzeźnica 47-411 i) SPZLA em Rudnik, ul. Kozielska 2a, Rudnik 47-411 j) SPZLA em Łubowice, ul. Młyńska 1, Grzegorzowice 47-411 A data prevista para a conclusão do projeto — 10. Todos vocês em 2020. Contadores independentes são instalados em edifícios/locais para os quais os endereços são duplicados. (Portuguese)
    2 July 2022
    0 references
    Hanke koostuu verkkoon liitettyjen aurinkosähkölaitteistojen asentamisesta 10 julkiseen rakennukseen Rudnikin kunnassa: a) Toimisto ja asuinrakennus- GOPS Rudnik, ul. Arc.Gawliny 2a, Rudnik 47–411 b) Toimisto ja asuinrakennus- ZWiUK Rudnik, ul. Arc.Gawliny 2a, Rudnik 47–411 c) Rudnikin kaupungintoimiston rakennus, ul. Kozielska 1, Rudnik 47–411 d) Gymnasium SP Rudnik, ul. Solar 1, Rudnik 47–411 e) Rudnikin peruskoulu, ul. Solar 1, Rudnik 47–411 f) Gymnasium SP: ssä Grzegorzowicessa, ul. Se on hillintä. Śląskich 22, Grzegorzowice 47–411 g) Peruskoulu Grzegorzowicessa, ul. Se on hillintä. Śląskich 22, Grzegorzowice 47–411 h) Peruskoulu Brzeźnicassa, ul. Kozielska 11, Brzeźnica 47–411 i) SPZLA in Rudnik, ul. Kozielska 2a, Rudnik 47–411 j) SPZLA in Łubowice, ul. Młyńska 1, Grzegorzowice 47–411 Hankkeen suunniteltu valmistumispäivä – 10. Kaikki vuonna 2020. Riippumattomat mittarit asennetaan rakennuksiin/paikkoihin, joiden osoitteet ovat päällekkäisiä. (Finnish)
    2 July 2022
    0 references
    Projekt obsega namestitev fotonapetostnih inštalacij, povezanih z omrežjem na 10 javnih stavbah v občini Rudnik: a) Pisarniška in stanovanjska stavba – GOPS v Rudniku, ul. Arc.Gawliny 2a, Rudnik 47–411 b) Pisarniška in stanovanjska stavba- ZWiUK v Rudniku, ul. Arc.Gawliny 2a, Rudnik 47–411 c) Zgradba občinske pisarne v Rudniku, ul. Kozielska 1, Rudnik 47–411 d) Gimnazija na SP v Rudniku, ul. Solar 1, Rudnik 47–411 e) Osnovna šola v Rudniku, ul. Solar 1, Rudnik 47–411 f) Gimnazija na SP v Grzegorzowicah, ul. To je omejitev. Śląskich 22, Grzegorzowice 47–411 g) Osnovna šola v Grzegorzowicah, ul. To je omejitev. Śląskich 22, Grzegorzowice 47–411 h) Osnovna šola v Brzeźnici, ul. Kozielska 11, Brzeźnica 47–411 i) SPZLA in Rudnik, ul. Kozielska 2a, Rudnik 47–411 j) SPZLA v Łubowice, ul. Młyńska 1, Grzegorzowice 47–411 Načrtovani datum zaključka projekta – 10. Vsi v letu 2020. Neodvisni števci so nameščeni v stavbah/lokalih, za katere se podvajajo naslovi. (Slovenian)
    2 July 2022
    0 references
    Projekt spočívá v instalaci fotovoltaických zařízení napojených na síť na 10 veřejných budov v obci Rudnik: a) Kancelářská a obytná budova- GOPS v Rudniku, ul. Arc.Gawliny 2a, Rudnik 47–411 b) Kancelářská a obytná budova- ZWiUK v Rudniku, ul. Arc.Gawliny 2a, Rudnik 47–411 c) Budova Městského úřadu v Rudníku, ul. Kozielska 1, Rudnik 47–411 d) Gymnázium SP v Rudniku, ul. Solar 1, Rudnik 47–411 e) Základní škola v Rudníku, ul. Solar 1, Rudnik 47–411 f) Gymnázium na SP v Grzegorzowice, ul. Je to zdrženlivost. Śląskich 22, Grzegorzowice 47–411 g) Základní škola v Grzegorzowicích, ul. Je to zdrženlivost. Śląskich 22, Grzegorzowice 47–411 h) Základní škola v Brzeźnici, ul. Kozielska 11, Brzeźnica 47–411 i) SPZLA in Rudnik, ul. Kozielska 2a, Rudnik 47–411 j) SPZLA in Łubowice, ul. Młyńska 1, Grzegorzowice 47–411 Plánované dokončení projektu – 10. Vy všichni v roce 2020. Nezávislé měřiče jsou instalovány v budovách/místech, pro které jsou adresy duplikovány. (Czech)
    2 July 2022
    0 references
    Projektą sudaro fotovoltinių įrenginių, prijungtų prie tinklo, įrengimas 10 viešųjų pastatų Rudniko savivaldybėje: a) Biuro ir gyvenamasis pastatas- GOPS Rudnik, ul. Arc.Gawliny 2a, Rudnik 47–411 b) Biuro ir gyvenamasis pastatas- ZWiUK Rudnik, ul. Arc.Gawliny 2a, Rudnik 47–411 c) Savivaldybės pastatas Rudnike, ul. Kozielska 1, Rudnik 47–411 d) gimnazija SP Rudnik, ul. Solar 1, Rudnik 47–411 e) Pradinė mokykla Rudnik, ul. Saulės 1, Rudnik 47–411 f) Gimnazija prie SP Grzegorzowice, ul. Tai yra santūrumas. Śląskich 22, Grzegorzowice 47–411 g) Pradinė mokykla Grzegorzowice, ul. Tai yra santūrumas. Śląskich 22, Grzegorzowice 47–411 h) Pradinė mokykla Brzeźnica, ul. Kozielska 11, Brzeźnica 47–411 i) SPZLA Rudnik, ul. Kozielska 2a, Rudnik 47–411 j) SPZLA Łubowice, ul. Młyńska 1, Grzegorzowice 47–411 Planuojama projekto užbaigimo data – 10. Visi 2020 m. Pastatuose/vietose, kurių adresai dubliuojami, įrengti nepriklausomi skaitikliai. (Lithuanian)
    2 July 2022
    0 references
    Projekts ietver fotoelementu iekārtu, kas savienotas ar tīklu, uzstādīšanu 10 sabiedriskajās ēkās Rudnik pašvaldībā: a) Birojs un dzīvojamā ēka — GOPS Rudnikā, ul. Arc.Gawliny 2a, Rudnik 47–411 b) birojs un dzīvojamā ēka — ZWiUK Rudnik, ul. Arc.Gawliny 2a, Rudnik 47–411 c) Pašvaldības biroja ēka Rudnik, ul. Kozielska 1, Rudnik 47–411 d) Vingrošana SP Rudnikā, ul. Solar 1, Rudnik 47–411 e) sākumskola Rudnik, ul. Solar 1, Rudnik 47–411 f) ģimnāzija pie SP Grzegorzowice, ul. Tas ir ierobežojums. Śląskich 22, Grzegorzowice 47–411 g) pamatskola Grzegorzowice, ul. Tas ir ierobežojums. Šląskich 22, Grzegorzowice 47–411 h) sākumskola Brzeźnica, ul. Kozielska 11, Brzeźnica 47–411 i) SPZLA Rudnikā, ul. Kozielska 2a, Rudnik 47–411 j) SPZLA in Łubowice, ul. Młyńska 1, Grzegorzowice 47–411 Projekta plānotais pabeigšanas datums — 10. Y’all 2020. gadā. Ēkās/vietējās ēkās, kuru adreses tiek dublētas, tiek uzstādīti neatkarīgi skaitītāji. (Latvian)
    2 July 2022
    0 references
    Проектът се състои в инсталирането на фотоволтаични инсталации, свързани с мрежата, на 10 обществени сгради в община Рудник: а) Офис и жилищна сграда- GOPS в Rudnik, ул. Arc.Gawliny 2a, Rudnik 47—411 б) Офис и жилищна сграда- ZWiUK в Rudnik, ул. Arc.Gawliny 2a, Rudnik 47—411 c) Сграда на Общинското управление в Рудник, ул. Козилска 1, Рудник 47—411, г) гимназия при СП в Рудник, ул. Солар 1, Рудник 47—411 д) Основно училище в Рудник, ул. Слънчева 1, Rudnik 47—411 f) гимназия в SP в Grzegorzowice, ул. Това е сдържаност. Śląskich 22, Grzegorzowice 47—411 g) Основно училище в Grzegorzowice, ул. Това е сдържаност. Śląskich 22, Grzegorzowice 47—411 h) Основно училище в Бжезница, ул. Козилска 11, Бжезница 47—411 i) SPZLA в Рудник, ул. Kozielska 2a, Rudnik 47—411 j) SPZLA в Любовице, ул. Młyńska 1, Grzegorzowice 47—411 Планираната дата на завършване на проекта — 10. Всички вие през 2020 г. В сгради/места се монтират независими измервателни уреди, за които адресите са дублирани. (Bulgarian)
    2 July 2022
    0 references
    A projekt a Rudnik településen található 10 középület hálózatához kapcsolódó fotovoltaikus létesítmények telepítéséből áll: a) Iroda és lakóépület- GOPS Rudnik, ul. Arc.Gawliny 2a, Rudnik 47–411 b) Iroda és lakóépület – ZWiUK Rudnik, ul. Arc.Gawliny 2a, Rudnik 47–411. c) A városi iroda épülete Rudnikban, ul. Kozielska 1, Rudnik 47–411 d) Gymnasium at SP in Rudnik, ul. Solar 1, Rudnik 47–411. e) Rudnik Általános Iskola, ul. Solar 1, Rudnik 47–411 f) Gimnázium az SP-ben Grzegorzowice, ul. Ez egy visszafogottság. Śląskich 22, Grzegorzowice 47–411 g) Grzegorzowice, ul. Ez egy visszafogottság. Śląskich 22, Grzegorzowice 47–411 h) Brzeźnica, ul. Kozielska 11, Brzeźnica 47–411 i) SPZLA in Rudnik, ul. Kozielska 2a, Rudnik 47–411 j) SPZLA in Łubowice, ul. Młyńska 1, Grzegorzowice 47–411 A projekt tervezett befejezésének időpontja – 10. Mindannyian 2020-ban. Független mérők vannak felszerelve olyan épületekben/helyszíneken, ahol a címeket duplikálják. (Hungarian)
    2 July 2022
    0 references
    Is éard atá sa tionscadal suiteáil suiteálacha fótavoltacha atá nasctha leis an líonra ar fhoirgnimh phoiblí 10 i bhardas Rudnik: a) Oifig agus foirgneamh cónaithe- GOPS i Rudnik, ul. Arc.Gawliny 2a, Rudnik 47-411 b) Oifig agus foirgneamh cónaithe- ZWiUK i Rudnik, ul. Arc.Gawliny 2a, Rudnik 47-411 c) Foirgneamh na hOifige Bardasach i Rudnik, ul. Kozielska 1, Rudnik 47-411 d) Giomnáisiam ag SP i Rudnik, ul. Gréine 1, Rudnik 47-411 e) Bunscoil i Rudnik, ul. Gréine 1, Rudnik 47-411 f) Giomnáisiam ag an SP i Grzegorzowice, ul. Tá moill ar an lódáil, is cosúil. 22, Grzegorzowice 47-411 g) Bunscoil i Grzegorzowice, ul. Tá moill ar an lódáil, is cosúil. 22, Grzegorzowice 47-411 h) Bunscoil na mBráithre Críostaí, ul. 11, An Bhreac 47-411 i) SPZLA i Rudnik, ul. 2a, Rudnik 47-411 j) SPZLA i Łubowice, ul. Młyńska 1, Grzegorzowice 47-411 Dáta críochnaithe an tionscadail atá beartaithe — 10. Y’all sa bhliain 2020. Suiteáiltear méadair neamhspleácha i bhfoirgnimh/áitiúla a bhfuil a seoltaí dúbailte. (Irish)
    2 July 2022
    0 references
    Projektet består av installation av solcellsinstallationer som är anslutna till nätet i 10 offentliga byggnader i Rudnik kommun: a) Kontor och bostadshus- GOPS i Rudnik, ul. Arc.Gawliny 2a, Rudnik 47–411 b) Kontor och bostadshus- ZWiUK i Rudnik, ul. Arc.Gawliny 2a, Rudnik 47–411 c) Kommunalkontorets byggnad i Rudnik, ul. Kozielska 1, Rudnik 47–411 d) Gymnasium på SP i Rudnik, ul. Sol 1, Rudnik 47–411 e) Grundskola i Rudnik, ul. Solar 1, Rudnik 47–411 f) Gymnasium vid SP i Grzegorzowice, ul. Det är en återhållsamhet. Śląskich 22, Grzegorzowice 47–411 g) Grundskola i Grzegorzowice, ul. Det är en återhållsamhet. Śląskich 22, Grzegorzowice 47–411 h) Grundskola i Brzeźnica, ul. Kozielska 11, Brzeźnica 47–411 i) SPZLA i Rudnik, ul. Kozielska 2a, Rudnik 47–411 j) SPZLA i Łubowice, ul. Młyńska 1, Grzegorzowice 47–411 Det planerade datumet för projektets slutförande – 10. Alla år 2020. Oberoende mätare installeras i byggnader/lokaler för vilka adresser är dubblerade. (Swedish)
    2 July 2022
    0 references
    Projekt hõlmab võrku ühendatud fotogalvaaniliste seadmete paigaldamist Rudniku omavalitsuse kümnele avalikule hoonele: a) Kontori- ja eluhoone- GOPS Rudnik, ul. Arc.Gawliny 2a, Rudnik 47–411 b) Kontori- ja eluhoone- ZWiUK Rudnik, ul. Arc.Gawliny 2a, Rudnik 47–411 c) Rudniku linnavalitsuse hoone, ul. Kozielska 1, Rudnik 47–411 d) Gümnaasium SP Rudnik, ul. Solar 1, Rudnik 47–411 e) Rudniku algkool, ul. Solar 1, Rudnik 47–411 f) Gümnaasium SP juures Grzegorzowice, ul. See on vaoshoitud. Śląskich 22, Grzegorzowice 47–411 g) Primary School in Grzegorzowice, ul. See on vaoshoitud. Śląskich 22, Grzegorzowice 47–411 h) Põhikool Brzeźnicas, ul. Kozielska 11, Brzeźnica 47–411 i) SPZLA Rudnik, ul. Kozielska 2a, Rudnik 47–411 j) SPZLA in Łubowice, ul. Młyńska 1, Grzegorzowice 47–411 Projekti kavandatud valmimise kuupäev – 10. Te kõik olete 2020. aastal. Sõltumatud arvestid paigaldatakse hoonetesse/kohalikesse kohtadesse, mille aadressid on dubleeritud. (Estonian)
    2 July 2022
    0 references
    WOJ.: ŚLĄSKIE, POW.: raciborski
    0 references
    13 December 2023
    0 references

    Identifiers

    RPSL.04.01.02-24-0677/18
    0 references