Reconstruction of Uusmõisa manor park (Q3079343)

From EU Knowledge Graph
Revision as of 05:30, 12 June 2023 by Admin (talk | contribs) (BatchIngestion)
Jump to navigation Jump to search
Project Q3079343 in Estonia
Language Label Description Also known as
English
Reconstruction of Uusmõisa manor park
Project Q3079343 in Estonia

    Statements

    0 references
    348,429.45 Euro
    0 references
    409,917.0 Euro
    0 references
    85.0 percent
    0 references
    1 October 2015
    0 references
    1 October 2018
    0 references
    Haapsalu Linnavalitsus
    0 references
    0 references
    0 references

    58°56'30.23"N, 23°32'12.98"E
    0 references
    90504
    0 references
    Puhastatakse pargi tiik ja lävivoolukraav; likvideeritakse sobimatud, ohtlikud puud (72); rekonstrueeritakse pargi taristut (jalgteed, drenaaž, jalakäijate sillad (2), allee, peenrad). Projekti omafinantseering kaasfinantseeritakse KIKi Keskkonnaprogrammist. (Estonian)
    0 references
    The park pond and threshold ditch are cleaned; eliminate unsuitable, hazardous trees (72); the park infrastructure (footways, drainage, pedestrian bridges (2), alleys, beds) will be reconstructed. The self-financing of the project is co-financed by the Environmental Programme of EIC. (English)
    16 August 2021
    0 references
    L’étang du parc et le fossé de seuil sont nettoyés; éliminer les arbres inadaptés et dangereux (72); L’infrastructure du parc (passages, drainage, ponts piétonniers (2), ruelles, lits) sera reconstruite. L’autofinancement du projet est cofinancé par le programme environnemental du CEI. (French)
    26 November 2021
    0 references
    Der Parkteich und der Schwellengraben werden gereinigt; Beseitigung ungeeigneter, gefährlicher Bäume (72); die Parkinfrastruktur (Fußwege, Entwässerung, Fußgängerbrücken (2), Gassen, Betten) wird rekonstruiert. Die Eigenfinanzierung des Projekts wird durch das Umweltprogramm des EIC kofinanziert. (German)
    30 November 2021
    0 references
    De parkvijver en de drempelgoot worden gereinigd; ongeschikte, gevaarlijke bomen elimineren (72); de parkinfrastructuur (wegen, drainage, voetgangersbruggen (2), steegjes, bedden) zal worden gereconstrueerd. De zelffinanciering van het project wordt medegefinancierd door het milieuprogramma van de EIC. (Dutch)
    5 December 2021
    0 references
    Lo stagno del parco e il fosso di soglia sono puliti; eliminare gli alberi inadatti e pericolosi (72); L'infrastruttura del parco (passi, drenaggio, ponti pedonali (2), vicoli, letti) sarà ricostruita. L'autofinanziamento del progetto è cofinanziato dal programma ambientale del CEI. (Italian)
    12 January 2022
    0 references
    Se limpian el estanque del parque y la zanja del umbral; eliminar árboles peligrosos y inadecuados (72); la infraestructura del parque (caminos, drenaje, puentes peatonales (2), callejones, camas) será reconstruida. La autofinanciación del proyecto está cofinanciada por el Programa Medioambiental del Consejo Europeo de Innovación. (Spanish)
    13 January 2022
    0 references
    Parken dammen og tærskel grøften rengøres; fjerne uegnede, farlige træer (72) parkens infrastruktur (fodveje, dræning, fodgængerbroer (2), gyder, senge) vil blive rekonstrueret. Selvfinansieringen af projektet samfinansieres af EIC's miljøprogram. (Danish)
    11 July 2022
    0 references
    Η λίμνη του πάρκου και η τάφρος κατωφλίου καθαρίζονται· εξάλειψη ακατάλληλων, επικίνδυνων δένδρων (72)· η υποδομή του πάρκου (πόδια, αποστράγγιση, γέφυρες πεζών (2), σοκάκια, κρεβάτια) θα ανακατασκευαστεί. Η αυτοχρηματοδότηση του έργου συγχρηματοδοτείται από το περιβαλλοντικό πρόγραμμα του ΕΣΚ. (Greek)
    11 July 2022
    0 references
    Park ribnjak i prag jarak su očišćeni; eliminirati neprikladna, opasna stabla (72); obnovit će se infrastruktura parka (putovi, odvodnja, pješački mostovi (2), uličice, kreveti). Samofinanciranje projekta sufinancirano je iz Programa zaštite okoliša EIC-a. (Croatian)
    11 July 2022
    0 references
    Iazul parcului și șanțul-prag sunt curățate; eliminarea arborilor neadecvați și periculoși (72); infrastructura parcului (drumuri, drenaj, poduri pietonale (2), alei, paturi) va fi reconstruită. Autofinanțarea proiectului este cofinanțată de programul de mediu al CEI. (Romanian)
    11 July 2022
    0 references
    Rybník parku a prah priekopy sú vyčistené; eliminovať nevhodné, nebezpečné stromy (72); obnoví sa infraštruktúra parku (cesty, kanalizácia, mosty pre chodcov (2), uličky, lôžka). Samofinancovanie projektu je spolufinancované z environmentálneho programu EIC. (Slovak)
    11 July 2022
    0 references
    Jitnaddfu l-għadira tal-park u l-għatba; jeliminaw siġar perikolużi u mhux adattati (72); l-infrastruttura tal-park (saqajn, drenaġġ, pontijiet pedonali (2), alleys, sodod) se tiġi rikostruwita. L-awtofinanzjament tal-proġett huwa kofinanzjat mill-Programm Ambjentali tal-EIC. (Maltese)
    11 July 2022
    0 references
    A lagoa do parque e a vala do limiar são limpas; eliminar árvores inapropriadas e perigosas (72); a infraestrutura do parque (pés, drenagem, pontes pedonais (2), becos, camas) será reconstruída. O autofinanciamento do projeto é cofinanciado pelo Programa Ambiental do CEI. (Portuguese)
    11 July 2022
    0 references
    Puiston lampi ja kynnysoja puhdistetaan; poistaa sopimattomat, vaaralliset puut (72); puiston infrastruktuuri (jalkakäytävät, kuivatus, jalankulkijoiden sillat (2), kujat, sängyt) rekonstruoidaan. Hankkeen omarahoitus rahoitetaan Euroopan innovaationeuvoston ympäristöohjelmasta. (Finnish)
    11 July 2022
    0 references
    Staw parkowy i rów progowy są czyszczone; wyeliminować nieodpowiednie, niebezpieczne drzewa (72); infrastruktura parkowa (drogi, drenaż, mosty dla pieszych (2), alejki, łóżka) zostanie przebudowana. Samofinansowanie projektu jest współfinansowane z Programu Ochrony Środowiska EIC. (Polish)
    11 July 2022
    0 references
    Parkovni ribnik in mejni jarki se očistijo; odpraviti neprimerna, nevarna drevesa (72); rekonstruirana bo infrastruktura parka (noge, drenaža, mostovi za pešce (2), ulice, ležišča). Samofinanciranje projekta se sofinancira iz okoljskega programa EIC. (Slovenian)
    11 July 2022
    0 references
    Jezírko v parku a příkop prahu jsou vyčištěny; eliminovat nevhodné, nebezpečné stromy (72); bude rekonstruována infrastruktura parku (stopy, odvodnění, mosty pro pěší (2), uličky, lůžka). Samofinancování projektu je spolufinancováno z programu ERI v oblasti životního prostředí. (Czech)
    11 July 2022
    0 references
    Parko tvenkinys ir slenkstinis griovys būtų valomi; pašalinti netinkamus, pavojingus medžius (72); parko infrastruktūra (pėdkelių, drenažo, pėsčiųjų tiltų (2), alėjos, lovų) bus rekonstruota. Paties projekto finansavimas yra bendrai finansuojamas pagal EIC aplinkos programą. (Lithuanian)
    11 July 2022
    0 references
    Parka dīķis un sliekšņa grāvis ir iztīrīti; likvidēt nepiemērotus, bīstamus kokus (72); tiks rekonstruēta parka infrastruktūra (kājas, drenāža, gājēju tilti (2), alejas, gultas). Projekta pašfinansējumu līdzfinansē EIC Vides programma. (Latvian)
    11 July 2022
    0 references
    Парковото езеро и праговата канавка се почистват; премахване на неподходящи, опасни дървета (72); инфраструктурата на парка (пътища, дренажи, пешеходни мостове (2), алеи, легла) ще бъде реконструирана. Самофинансирането на проекта се съфинансира от Програмата за околната среда на ЕСИ. (Bulgarian)
    11 July 2022
    0 references
    A park tavat és a küszöbárkot megtisztítják; a nem megfelelő, veszélyes fák felszámolása (72); a park infrastruktúráját (feljárók, vízelvezetés, gyalogoshidak (2), sikátorok, ágyak) rekonstruálják. A projekt önfinanszírozását az EIC környezetvédelmi programja társfinanszírozza. (Hungarian)
    11 July 2022
    0 references
    Glantar lochán na páirce agus díog tairsí; crainn ghuaiseacha atá mí-oiriúnach a dhíothú (72); déanfar bonneagar na páirce (cosáin, draenáil, droichid coisithe (2), alleys, leapacha) a atógáil. Tá féinmhaoiniú an tionscadail á chómhaoiniú ag Clár Comhshaoil EIC. (Irish)
    11 July 2022
    0 references
    Parken damm och tröskel dike rengörs; eliminera olämpliga, farliga träd (72), parkens infrastruktur (gångvägar, dränering, gångbroar (2), gränder, sängar) kommer att rekonstrueras. Självfinansieringen av projektet samfinansieras av EIC:s miljöprogram. (Swedish)
    11 July 2022
    0 references

    Identifiers

    2014-2020.8.01.005.01.15-0019
    0 references