Development and reconstruction of the system for the collection, collection and treatment of rainwater and mites, including the construction of water retention basins in Sierakowice (Q122512)

From EU Knowledge Graph
Revision as of 13:50, 7 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Development and reconstruction of the system for the collection, collection and treatment of rainwater and mites, including the construction of water retention basins in Sierakowice
Project in Poland financed by DG Regio

    Statements

    0 references
    4,413,406.23 zloty
    0 references
    1,059,217.4952 Euro
    13 January 2020
    0 references
    6,304,866.04 zloty
    0 references
    1,513,167.8495999998 Euro
    13 January 2020
    0 references
    70.0 percent
    0 references
    8 January 2018
    0 references
    30 September 2019
    0 references
    GMINA SIERAKOWICE
    0 references
    Projekt będzie realizowany w m. Sierakowice (gm. Sierakowice), w powiecie kartuskim, woj. pomorskim. Zakres inwestycji w obrębie ul.: Lęborskiej, Legionów, Dworcowej, Ks. B. Łosińskiego (teren Ołtarza Papieskiego) obejmuje przebudowę i budowę sieci kan. deszczowej o łącznej dł. 2 029,30 m z uzbrojeniem: osadniki wirowe jednokomorowe (2kpl.) oraz separator koalescencyjny w komorze (2kpl.), 2 zbiorniki retencyjne o poj.: 3 300 m3 i 9 100 m3, a także budowę i przebudowę kolektora kan. deszczowej w obszarze kolejowym i gruncie Skarbu Państwa o łącznej dł. 183,5 m. Retencyjność kolektora na terenie Ołtarza Papieskiego - 788 m3. Celem projektu jest wzmocnienie odporności Sierakowic na zagrożenia naturalne, takie jak powódź, czy susze. Wskaźniki produktu: Poj. obiektów małej retencji - 13 188m3 Dł. wybudowanej sieci kan. deszczowej - 0,72km Dł. przebudowanej sieci kan. deszczowej - 1,48km Wskaźnik rezultatu: Liczba ludności odnoszącej korzyści ze środków ochrony przeciwpowodziowej - 2 227os. (Polish)
    0 references
    The project will be implemented in (m. Sierakowice), county district, Pomorskie province. Extent of investment within the area: Lęborska, Legionella, stations, Kons B. Łosian (the forest area of Papian) consists of the reconstruction and construction of a rainwater system with a total length. 2 029.30 m with weapons: single-chamber rotor tanks (2kpl.) and a chamber separator for the chamber (2kpl.), 2 holding tanks: 3 300 m³ and 9 100 m³ as well as the construction and conversion of the sewer of the storm in the area of rail and the land of the State Treasury with a total length of time 183.5 m. the storage of the collectors on the land of the altar Pearski — 788 m³. The project aims to strengthen the resilience of Sierowice to natural hazards such as flooding or drought. Product indicators: In the case of small retention facilities — 13 188 m³. the length of the storm water network built — 0.72 km long distance of the reclaimed storm water network — 1.48 km indicator result indicator: Population benefiting from flood protection measures — 2 227os. (English)
    0 references

    Identifiers

    RPPM.11.01.00-22-0012/16
    0 references