Solar Photovoltaic Photovoltaic (Q137729)

From EU Knowledge Graph
Revision as of 13:22, 7 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Solar Photovoltaic Photovoltaic
Project in Poland financed by DG Regio

    Statements

    0 references
    1,554,005.88 zloty
    0 references
    372,961.4112 Euro
    13 January 2020
    0 references
    3,713,696.03 zloty
    0 references
    891,287.0471999999 Euro
    13 January 2020
    0 references
    77.35 percent
    0 references
    4 January 2016
    0 references
    25 June 2019
    0 references
    ROZTOCZE ENERGIA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    Przedmiotem planowej inwestycji jest budowa nowej farmy słonecznej (elektrowni fotowoltaicznej) o mocy do 1 MW ( 0,883 MWp) na terenie województwa zachodniopomorskiego w Gminie Choszczno. Na obszarze farmy planowane jest usytuowanie 3.300 sztuk paneli o mocy 295 Wp każdy. Panele zostaną zamontowane na konstrukcji wsporczej w zestawach połączonych przewodami i kablami w blok o mocy ok. 1 MWp. Zastosowane panele będą współpracowały z 30 inwerterami, które będą połączone złączami kablowymi z kontenerową stacją transformatorową, podłączoną bezpośrednio do sieci przesyłowej Krajowego Systemu Energetycznego. Projekt ma charakter stacjonarny i będzie realizowany w 2 etapach: 1) prace przygotowawcze; 2) Budowa farmy fotowoltaicznej. (Polish)
    0 references
    The planned investment is the construction of a new solar farm (photovoltaic power plant) with a capacity of up to 1 MW (0,883 MWp) in the Zachodniopomorskie Province in the municipality of Choszzno. It is intended that 3.300 units of 295 Wp panels are to be located within the farm area. The panels will be mounted on the supporting structure in a set of connected conductors and cables in a block with a power of approximately. 1 MWp. The panels used will cooperate with 30 inverters that will be connected by cable connections to a container transformer station, which is connected directly to the National Energy System. The project is of a stationary nature and will be implemented in 2 stages: 1) preparatory work; 2) Construction of a photovoltaic farm. (English)
    0 references

    Identifiers

    RPZP.02.10.00-32-B015/17
    0 references