Energy renovation of the municipal building in Lucakawa and in the building of the Group of Schools in Jasionka (Q118672)

From EU Knowledge Graph
Revision as of 12:19, 7 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Energy renovation of the municipal building in Lucakawa and in the building of the Group of Schools in Jasionka
Project in Poland financed by DG Regio

    Statements

    0 references
    434,655.92 zloty
    0 references
    104,317.42079999999 Euro
    13 January 2020
    0 references
    723,273.34 zloty
    0 references
    173,585.6016 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    23 March 2016
    0 references
    31 October 2017
    0 references
    GMINA TRZEBOWNISKO
    0 references
    Projekt obejmuje zadania inwestycyjne polegające na wykonaniu prac termomodernizacyjnych w 2 budynkach użyteczności publicznej zlokalizowanych w gminie Trzebownisko : 1. Budynek użyteczności publicznej w Łukawcu, 2. Budynek Zespołu Szkół w Jasionce, Dotychczasowy stan techniczny i energetyczny budynków objętych projektem jest dalece niezadowalający. Budynki wykazują znaczne straty energii cieplnej co spowodowane jest nieocieplonymi ścianami, stropami i nieefektywnym systemem cieplnym. W budynku komunalnym w Łukawcu zaplanowano:- izolacja ścian budynku styropianem o współczynniku przewodzenia ciepła ? = 0,033 W/(m*K),- ocieplenie stropodachu płytami wełny mineralnej o współczynniku przewodzenia ciepła ? = 0,035 W/(m*K), - wymiana starych okien na nowe o współczynniku przenikania ciepła nie gorszym niż U = 0,9 W/(m2*K), - wymiana starych drzwi na nowe o współczynniku przenikania ciepła nie gorszym niż U = 1,3 W/(m2*K), -modernizacja systemu CWU. Likwidacja lokalnych podgrzewaczy elektrycznych i montaż centralnej instalacji CWU zasilanej z kotła gazowego,- modernizacja systemu grzewczego. W budynku Zespołu Szkół w Jasionce zaplanowano:- ocieplenie stropu zewnętrznego (poddasze) płytami wełny mineralnej o współczynniku przewodzenia ciepła ? = 0,033 W/(m*K),- wymiana starych drzwi zewnętrznych na nowe o współczynniku przenikania ciepła nie gorszym niż U = 1,3 W/(m2*K), - wymiana starych okien zewnętrznych na nowe o współczynniku przenikania ciepła nie gorszym niż U = 0,9 W/(m2*K).Realizacja inwestycji pozwoli na uzyskanie:1. W budynku komunalnym w Łukawcu wskaźnika EP na poziomie 202,95 [kWh/m2/rok] oraz zostanie zmniejszone zapotrzebowanie na zużycie energii o 77%,2. W budynku ZS w Jasionce wskaźnika EP na poziomie 198,40 [kWh/m2/rok] oraz zostanie zmniejszone zapotrzebowanie na zużycie energii o 25%, W wyniku projektu prace termomodernizacyjne przeprowadzone zostaną w dwóch budynkach o łącznej kubaturze 15 961,08 m3. (Polish)
    0 references
    The project consists of investment tasks consisting of the completion of thermal modernisation works in 2 public buildings located in the municipality of Trzebowlow: 1. Public amenity building in Lucatecu, 2. A building group building in the Jasionka School, the current technical and energy condition of the buildings covered by the project is very unsatisfactory. Buildings show a significant loss of heat as a result of non-insulated walls, ceilings and an inefficient thermal system. The following is planned in the municipal building in Lukawica: — the insulation of the building wall with a heat leadership coefficient? = 0,033 W/(m * K), — warming up of the mineral wool sheet with a heat conduction coefficient? = 0,035 W/(m * K), — replacement of old windows with new heat transfer factors no worse than U = 0,9 W/(m² * K), — replacement of old doors with a new heat transfer coefficient of not less than U = 1,3 W/(m² * K), The dismantling of local electric heaters and the installation of a central installation of CWU powered by a gas boiler, — modernisation of the heating system. In the building of the School Complex in Jasionka, “- insulation of the outer ceiling (lighter) of mineral wool plates with a thermal conductivity is planned? = 0,033 W/(m * K), — replacement of old external doors with a new heat transfer coefficient of not less than U = 1,3 W/(m² * K), — replacement of old external windows with new heat transfer factors not worse than U = 0,9 W/(m² * K).Implementation of the investment will enable: 1. The EP level 202,95 [kWh/m²/year] will be reduced by 77 % for energy consumption and 2 for energy consumption. In the ZS building in Jasionka, the ‘EP’ ratio of 198,40 [kWh/m²/year] and a reduced energy consumption demand of 25 % will be reduced, as a result of the project, energy efficiency works will be carried out in two buildings with a total volume of 15 961.08 m³. (English)
    0 references