IMPROVING THE WATER AND WASTEWATER MANAGEMENT IN THE MUNICIPALITY AND IN THE CITY (Q102063)

From EU Knowledge Graph
Revision as of 11:38, 7 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
IMPROVING THE WATER AND WASTEWATER MANAGEMENT IN THE MUNICIPALITY AND IN THE CITY
Project in Poland financed by DG Regio

    Statements

    0 references
    13,501,897.35 zloty
    0 references
    3,240,455.3639999996 Euro
    13 January 2020
    0 references
    23,160,240.43 zloty
    0 references
    5,558,457.703199999 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    3 July 2017
    0 references
    30 December 2020
    0 references
    ZAKŁAD WODOCIĄGÓW I KANALIZACJI W WARCIE SP. Z O.O.
    0 references

    51°42'29.5"N, 18°37'30.4"E
    0 references
    Projekt polega na budowie sieci kanalizacji sanitarnej i deszczowej, rozbudowie i przebudowie istniejącej oczyszczalni ścieków w miejscowości Warta ze szczególnym uwzględnieniem rozbudowy i przebudowy układu gospodarki osadowej, zakupie urządzeń do eksploatacji sieci kanalizacyjnej, a także na wdrożeniu system monitoringu i zarządzania siecią wodociągową, siecią kanalizacji sanitarnej i siecią kanalizacji deszczowej w aglomeracji Warty. Projekt spełnia wszystkie cele programowe i przyczynia się w szczególności do poprawy jakości życia mieszkańców oraz ochrony środowiska naturalnego Warty poprzez modernizację procesu oczyszczania ścieków wraz z niezbędną infrastrukturą. Oczyszczalnia, do której będą odprowadzane ścieki, spełnia wymogi określone w załączniku I.B do Dyrektywy nr 91/271/EWG. Projekt wynika z Tabeli głównej Master Planu dla dyrektywy Rady 91/271/EWG, zgodnie z którą RLM rzeczywiste dla aglomeracji Warta wynosi 3 805. Projekt jest realizowany na obszarze aglomeracji od 2 do poniżej 10 tys. RLM. W wyniku realizacji projektu nastąpi standaryzacja systemu oczyszczania ścieków komunalnych i ochrona lokalnego środowiska wodnego (likwidacja istniejących zbiorników bezodpływowych) w wyniku rozbudowy i przebudowy oczyszczalni ścieków i objęcia siecią kanalizacyjną nowych gospodarstw w Warcie. Dzięki realizacji projektu wzrośnie jakość życia mieszkańców Gminy oraz polepszy się stan środowiska naturalnego. Realizacja projektu pozwoli na korzystanie z nowej, spełniającej wymagane normy infrastruktury, jednocześnie stanowiąc ochronę dla lokalnego środowiska wodnego przed zrzutem nieoczyszczonych ścieków do wód i gleb. Nastąpi zwiększenie bezpieczeństwa oraz efektywności istniejącej sieci kanalizacyjnej. Liczba osób, które skorzystają z ulepszonego oczyszczania ścieków – łącznie 1353 osób, w tym 364 osoby w nowo podłączonych gospodarstwach. Projekt został przygotowany w zgodzie z założeniami koncepcji projektowania uniwersalnego. (Polish)
    0 references
    The project consists of the construction of a sewage and storm-water sewage system, the extension and reconstruction of the existing sewage treatment plant in the town of Warta with special regard to the extension and conversion of the sludge management system, the purchase of equipment for the operation of the sewage system and the implementation of a system for monitoring and managing the water supply network, the sewage system and the storm water system in the agglomeration of Warta. The project meets all the programme objectives and contributes, in particular, to the improvement of the quality of life of the inhabitants and to the protection of the environment, through the modernisation of the waste water treatment process, together with the necessary infrastructure. The treatment plant to which the waste water will be discharged complies with the requirements set out in Annex I.B to Directive 91/271/EEC. The project results from the Master Plan for Council Directive 91/271/EEC according to which the actual p.e. for the agglomeration of Warta is 3 805. The project is carried out in an area of agglomerations of between 2 and less than 10. P.E. The project will result in the standardisation of the urban waste water treatment system and the protection of the local water environment (decommissioning of existing septic tanks) as a result of the extension and conversion of the sewage treatment plant and the extension of the sewerage network to the new Warsaw farm. The project will increase the quality of life of the local population and improve the environment. The project will allow the use of a new infrastructure meeting the required infrastructure, while protecting the local water environment from untreated waste water to water and soil. The safety and efficiency of the existing sewerage system will be improved. Number of people who benefit from an improved waste water treatment — a total of 1353 people, including 364 people in newly connected farms. The project has been prepared in line with the design of the universal design concept. (English)
    0 references

    Identifiers

    RPLD.05.03.02-10-0006/17
    0 references