CONSTRUCTION OF A POWER PLANT WITH STRENGTHS OF 200 KW AND 2.08 KW
Project in Poland financed by DG Regio

    Statements

    0 references
    578,280.0 zloty
    0 references
    138,787.19999999998 Euro
    13 January 2020
    0 references
    900,360.0 zloty
    0 references
    216,086.4 Euro
    13 January 2020
    0 references
    79.0 percent
    0 references
    15 October 2017
    0 references
    30 January 2018
    0 references
    DENTAMED ZESPÓŁ PRYWATNYCH GABINETÓW LEKARSKICH I STOMATOLOGICZNYCH IWONA ŚMIAŁEK-TOKARZ
    0 references

    51°21'16.9"N, 19°22'36.8"E
    0 references

    51°13'18.1"N, 19°18'22.7"E
    0 references
    Cele projektu zbieżne z celami strategicznymi województwa oraz gospodarki niskoemisyjnej, w tym: zwiększona produkcja energii ze źródeł odnawialnych oraz ograniczenie emisji CO2 i innych szkodliwych pyłów. Infrastruktura w projekcie będzie współpracowała z istniejąca siecią. Energia będzie przeznaczona na potrzeby własne obiektu a w części na sprzedaż. Zarządzający tą infrastrukturą (wnioskodawca) będzie współpracował z operatorem sieci (w zakresie części energii przeznaczonej na sprzedaż). Celem działań w projekcie jest uruchomienie produkcji energii z oze (potrzeby własne i sprzedaż), wpływ na redukcję emisji CO2 i innych pyłów (PM10, PM 2,5 i innych), wzrost wykorzystania OZE w produkcji energii (przejście na gospodarkę niskoemisyjną i zmniejszenie udziału energii konwencjonalnej). Cele projektu zostały jasno określone i wynikają ze zdefiniowanych problemów interesariuszy projektu, w tym potrzeb wnioskodawcy (zastąpienie energii pobieranej z sieci energią z instalacji oze, obniżenie kosztów bieżących). Cele w projekcie określone zostały mierzalnymi wskaźnikami produktu i rezultatu zgodnymi z celem działania RPO WŁ. Projekt zapewnia spadek emisji CO2 i innych pyłów (jako suma: redukcji u wnioskodawcy i emisji unikniętej) a tym samym posłuży poprawie realizacji celów strategicznych, w tym celów RPO WŁ. Zakres rzeczowy projektu obejmuje: montaż modułów fotowoltaicznych, inwerterów, okablowanie i system monitoringu efektywności pracy instalacji. Ogólna wartość projektu wyniesie 762652,00 zł netto (938061,96 zł brutto) - wydatki kwalifikowane projektu to 762652,00 zł. Realizacja projektu obejmuje fazę budowy oraz eksploatacji (w okresie trwałości). Projekt wpłynie na zwiększenie produkcji energii ze źródeł odnawialnych co jest zgodne z zapisami SZOOP RPO WŁ. W projekcie zastosowano koncepcję projektowania uniwersalnego – efekty projektu są w największym stopniu użyteczne dla wszystkich odbiorców(interesariuszy projektu). Grupa docelowa: użytkownik, wnioskodawca. (Polish)
    0 references
    Project objectives aligned with the region’s strategic objectives and the low carbon economy, including: increased production of renewable energy and CO2 and other harmful dust emissions. The infrastructure in the project will work with the existing network. The energy will be used for the own purpose of the plant and, in part, for sale. The manager of that infrastructure (the applicant) will cooperate with the network operator (for the part of the energy intended for sale). The project aims at mobilising energy production from oze (own needs and sales), the impact on the reduction of CO2 emissions and other particulates (PM10, PM 2,5 and others), an increase in the use of RES in energy production (transition to a low-carbon economy and a reduction in the share of conventional energy). The objectives of the project have been clearly defined and stem from the identified problems of the project stakeholders, including the needs of the applicant (replacement of energy from the installation with an installation with a reduction in running costs). The objectives of the project are set out in measurable output and result indicators in line with the objective of the ROP RDP. The project ensures a decrease in CO2 and other dust emissions (as the sum of: the reduction in the applicant and the avoided emissions), thereby improving the achievement of the strategic objectives, including the objectives of the ROP ROP. The scope of the project includes: installation of solar modules, inverters, cabling and monitoring of the operational efficiency of installations. The total value of the project will be PLN 762652,00 (PLN 938061,96 gross) — eligible expenditure of the project is PLN 762652,00. The implementation of the project covers the construction and operation phases (during the lifetime). The project will increase the production of energy from renewable sources, which is in line with the provisions of the RA ROP. The project has applied the concept of universal design — the project’s outputs are most useful for all consumers (project stakeholders). Audience: user, applicant. (English)
    0 references

    Identifiers

    RPLD.04.01.02-10-0012/16
    0 references