Increasing the permeability of the ecological corridors in the Parsęta river basin (Q85562)

From EU Knowledge Graph
Revision as of 10:49, 7 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Increasing the permeability of the ecological corridors in the Parsęta river basin
Project in Poland financed by DG Regio

    Statements

    0 references
    5,055,366.5 zloty
    0 references
    1,213,287.96 Euro
    13 January 2020
    0 references
    5,947,490.0 zloty
    0 references
    1,427,397.5999999999 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 October 2017
    0 references
    31 December 2020
    0 references
    ZWIĄZEK MIAST I GMIN DORZECZA PARSĘTY
    0 references
    0 references

    53°43'13.1"N, 16°40'45.1"E
    0 references

    53°44'15.4"N, 16°33'34.6"E
    0 references
    Celem projektu jest wzrost bioróżnorodności poprzez przywrócenie morfologicznej ciągłości wodnych korytarzy ekologicznych na 3 dopływach rzeki Parsęty: Raduszy, Gęsiej i Perznicy. Realizacja projektu umożliwi likwidację barier, które tworzy istniejąca infrastruktura oraz zapewni warunki do swobodnego przemieszczania się gatunków ryb i minogów na SOOS Natura 2000 Dorzecze Parsęty PLH320007. Udrożnienie korytarza ekol. odbędzie się poprzez dostosowanie budowli hydrotechnicznych do ekologii migrujących gat.: minoga rzecznego, minoga strumieniowego, łososia atlantyckiego, głowacza białopłetwego i kozy. Dorzecze Parsęty stanowi w miarę spójny ekosystem, jednak na przestrzeni wielu lat liczne bud. hydrotechn. spowodowały znaczne zmniejszenie się różnorodności biol. utrudniając lub całkowicie uniemożliwiając dotarcie rybom na tarliska. Mimo występowania dogodnych, naturalnych miejsc tarliskowych (w szcz. na Gęsiej, Raduszy i Perznicy)dostęp do nich jest mocno utrudniony, a w niektórych przypadkach wręcz niemożliwy. Gł. elementy projektu: 1. Przygotowanie dok. techn. dot. przebudowy infrastruktury hydrotechnicznej. 2.Przebudowa urządzeń infrastr. hydrotechnicznej zapewniającej swobodną migrację ryb i minogów (przywrócenie ciągłości na rzekach Perznica, Radusza i Gęsia). Likwidacja 14 stopni, 5 zastawek i 1 jazu. Budowa 47 bystrzy, ustabilizowanie dna, narzut kamienny z profilowaniem spadku, ścianki szczelne przeciwfiltracyjne, wbudowanie substratu żwirowego. 3.Aktywna ochrona siedlisk (walka z kłusownictwem, ogr. presji wędkarskiej 4.Przeprowadzenie badań dotyczących osiągniętych efektów ekol 5.Informacja i promocja projektu 6.Zarządzanie projektem (Polish)
    0 references
    The aim of the project is to increase biodiversity by restoring the morphological continuity of the ecological corridors on the 3 tributaries of the Parsęta river:Raduza, goose and Peernica.The implementation of the project will allow the removal of the barriers that existing infrastructure will create and the conditions for free movement of fish species and minotails for SOOS Natura 2000, Parsęta Parsęta PLH320007.By adapting the hydrotechnical structures to migrant ecology, the ekoli corridor will be made more expensive:the river lampreys, the lamprey, the Atlantic salmon, the head of the Community’s protein and the goat.The Parsęta basin is a cohesive ecosystem in many years, however, over a number of years, a large number of hydrotechn developments have given rise to a significant reduction in the diversity of biologists, making it difficult or impossible for fish to reach spawning grounds.Despite the existence of convenient, natural spawning sites (in the rat, Radears and Peernica), access to these places is very difficult and in some cases impossible.Project elements:1.Preparation of technical specifications for conversion of hydrotechnical infrastructure.2.Upgrading of infrastructure equipment that provides free migration of fish and mines (restoring continuity to the Przenica, Radza and goose rivers).Removal of 14 degrees, 5 rates and 1 jazu.Construction of 47 male, stabilised bottom, rock guard with drop profiling, anti-filter walls, gravel substrate building.3.Conservation of habitats (anti-poaching, high level 4.Performance of research on the environmental effects achieved 5.Information and project promotion 6.Project management (English)
    0 references

    Identifiers

    POIS.02.04.00-00-0033/17
    0 references