Reconstruction and extension of the basic school building. Prof. J. Tischner in Stary Sączu, Professor 1: Installation of a gym with the hinterland (Q114398)

From EU Knowledge Graph
Revision as of 10:28, 7 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Reconstruction and extension of the basic school building. Prof. J. Tischner in Stary Sączu, Professor 1: Installation of a gym with the hinterland
Project in Poland financed by DG Regio

    Statements

    0 references
    4,653,057.37 zloty
    0 references
    1,116,733.7688 Euro
    13 January 2020
    0 references
    7,471,193.69 zloty
    0 references
    1,793,086.4856 Euro
    13 January 2020
    0 references
    65.0 percent
    0 references
    1 June 2017
    0 references
    31 December 2019
    0 references
    GMINA STARY SĄCZ
    0 references
    Projektowaną rozbudowę sali gimnastycznej usytuowano w części południowej działki i styka się ścianą oddzielenia przeciwpożarowego z budynkiem istniejącej szkoły podstawowej. Część zabudowy kolidująca z projektowaną rozbudową przeznaczona jest do rozbiórki.Projektuje się drogę wewnętrzną wzdłuż granicy północnozachodniej. Drzewa kolidujące z projektowaną drogą przewidziano do wycinki w ilości 70 sztuk, a w zamian projektuje się nowe drzewa od strony południowej działki w ilości 59 sztuk. Przy drodze wewnętrznej zaprojektowano 38 miejsca postojowe dla obsługi budynku istniejącego i projektowanego. Istniejące ogrodzenie kolidujące z projektowaną budową drogi będzie zdemontowane i wykonane w granicy działki budowlanej. Dla części projektowanej przewidziano się nowe instalacje kanalizacji deszczowej, kanalizacji sanitarnej i wody realizowane na warunkach gestorów. Wzdłuż nowej drogi wewnętrznej projektuje się oświetlenie zewnętrzne. Przyłącza na bazie istniejących.BILANS TERENU:powierzchnia dz. budowlanej 1,3246hapow. zabudowy projektowanej 0,1719ha pow. zabudowy istniejącej 0,1494ha pow. utwardzona projektowana 0,3005haw tym:pow. utwardzona dróg 0,1227hapow. utwardzona chodników 0,1294hapow. utwardzona parkingów 0,0484hapow. utwardzona istniejąca 0,1985ha pow. biolog. czynna trawa 0,5043ha ZESTAWIENIE POWIERZCHNI DLA CAŁEGO BUDYNKU:Zestawienie powierzchni PRZED ROZBUDOWĄ I PRZEBUDOWĄ:POWIERZCHNIA UŻYTKOWA 2273,27 m2KUBATURA 9860,40 m3POWIERZCHNIA ZABUDOWY 1494,00 mZestawienie powierzchni OBJETEJ OPRACOWANIEM:POWIERZCHNIA UŻYTKOWA 2056,38 m2KUBATURA 19275,32 m3POWIERZCHNIA ZABUDOWY 1719,00 mZestawienie powierzchni PO ROZBUDOWIE I PRZEBUDOWIE:POWIERZCHNIA UŻYTKOWA 4329,65 m2KUBATURA 29135,72 m3POWIERZCHNIA ZABUDOWY 3213,00 m (Polish)
    0 references
    The projected installation of a gym is situated in the southern part of the plot of land and is in contact with the wall of the fire separation with the existing primary school. The part of the building which conflicts with the planned extension is intended for demolition. the design shall be the internal road along the North West border. The trees at issue were predicted to be harvested up to 70 pieces and, in return, a new tree is being taken from the southern side of the plot of 59 pieces. By means of an internal design, 38 parking spaces for existing and design buildings are designed. The existing fence opposing the design of the road will be dismantled and constructed within the boundary of the building plot. New sewerage, sanitary and water sewage systems are planned for the planned part of the project. External lighting shall be designed along the new internal road. Connections based on the existing TERENCE building site: the surface of 1.3246 ha of construction project of 0.1719 ha of 0.1494 ha of paved construction. the paved road of 0.3005 ha. paved the ground: 0.1227 ha. paved roads with 0.1294 ha. paved the ground. 0.0484 ha. paved ground. 0.1985 ha. paved ground. an active grass surface 0,5043 m2273,27KUBATURA 2 m9860,40POGZCHNIA ZABUDA 3 mSummary of the surface of the area covered by the development: floor area 1494,00 m2056,38KBATURA 2 m19275,32POGZCHNIA ZABUDA 3 mth of the surface area of the extension and conversion area: 1719,00 m4329,65KUBATURA 2 m29135,72POGZCHNIA ZABUDA 3 m (English)
    0 references

    Identifiers

    RPMP.11.01.02-12-0897/17
    0 references