Thermal modernisation of the Public Building of Primary School in Sardinia (Q98208)

From EU Knowledge Graph
Revision as of 10:01, 7 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal modernisation of the Public Building of Primary School in Sardinia
Project in Poland financed by DG Regio

    Statements

    0 references
    754,147.76 zloty
    0 references
    180,995.4624 Euro
    13 January 2020
    0 references
    1,132,528.0 zloty
    0 references
    271,806.72 Euro
    13 January 2020
    0 references
    84.71 percent
    0 references
    11 April 2016
    0 references
    5 October 2018
    0 references
    GMINA LUBRANIEC
    0 references
    Przedmiotem projektu jest termomodernizacja budynku Publicznej Szkoły Podstawowej w Sarnowie. Budynek szkoły będący przedmiotem inwestycji zlokalizowany jest na działce nr 104 w obrębie ewidencyjnym 0037 Wiktorowo położonej w miejscowości Sarnowo, gmina Lubraniec. Ogólny stan elementów konstrukcyjnych budynku jest dobry jednak ściany zewnętrzne, ściany fundamentu, dach mają niewystarczającą izolacyjność termiczną co charakteryzuje się wysoką przepuszczalnością ciepła i wzrostem kosztów związanych z ogrzewaniem budynku. Ponadto instalacja wewnętrzna i grzejniki są w złym stanie technicznym i kwalifikują się do kompletnej wymiany. Zakres robót związanych z projektem będzie obejmował: wymianę całej instalacji centralnego ogrzewania wraz z grzejnikami, montaż kotła olejowego wraz z remontem komina spalinowego, montaż pompy ciepła oraz instalacji fotowoltaicznej, ocieplenie stropodachu niewentylowanego styropianem laminowanym (styropapą) - 720 m2, ocieplenie ścian zewnętrznych styropianem gr. 15 cm. (metoda lekka mokra) - 616 m2, ocieplenie ścian zewnętrznych fundamentu polistyrenem ekstrudowanym grubości 12 cm - 240m2, wymiana okien - 168 m2 oraz wymiana drzwi zewnętrznych na tzw. drzwi "ciepłe" - 12 m2. Elewacja budynku również zostanie wymieniona na nową. Inwestycja zostanie wykonana w jednym etapie. Całkowity koszt robót związanych z termomodernizacją budynku wyniesie 1 143 737,07 zł - wartość kosztorysowa robót. Roczne zużycie energii zmniejszy się z obecnych 882GJ do 227 GJ po termomodernizacji, a więc o 655 GJ - 181 944,44 kWh. Nastąpi również znaczna redukcja pyłu PM 10 - 99,73% oraz CO2 - 53,26177 tony. Dzięki zastosowaniu w projekcie nowoczesnych rozwiązań i technologii zużycie energii do ogrzania budynku zmniejszy się, a przyroda zostanie odciążona z nadmiernej emisji gazów cieplarnianych i innych szkodliwych związków. (Polish)
    0 references
    The project is a thermo-modernisation of the Public Building of the Primary School in Sardinia. The building which is the subject of the investment is located on plot No 104 within the cadastral district of 0037 Victoria, Lubraiec, in the municipality of Lubraiec. However, the general building elements of the building are good external walls, the foundation walls, the roof has insufficient thermal insulation, which is characterised by a high heat transmission and an increase in the costs associated with the heating of the building. Moreover, internal installation and radiators are in poor technical condition and are eligible for complete replacement. The scope of the works relating to the project will be as follows: the replacement of the entire central heating installation with radiators, assembly of the oil boiler, installation of the exhaust boiler, the installation of the heat pump and the photovoltaic installation, the insulation of the non-ventilated sealed pipe (styropapa) — 720 m², the insulation of the outer wall of the stills 15 cm. (light wet method) — 616 m², insulation of the wall of the outer wall of the polystyrene extruded polystyrene with an extruded thickness of 12 cm — 240 m², replacement of windows — 168 m², and the replacement of external doors on the so called ‘warm’ door — 12 m². The building will also be replaced. The investment will be made at a single stage. The total cost of the works related to the thermal modernisation of the building will be PLN 1 143 737,07 — the cost estimate for the works. The annual energy consumption will be reduced from the current 882GJ to 227 GJ after thermal modernisation, i.e. by 655 GJ to 181 944.44 kWh. PM 1099.73 % and CO2-53,26177 tonnes will also be significantly reduced. Thanks to the design of modern solutions and technologies, the energy consumption to heat the building will be reduced and nature will be cut off from excessive GHG emissions and other harmful compounds. (English)
    0 references

    Identifiers

    RPKP.03.03.00-04-0037/16
    0 references