Bicycle paths and place of tourism in the Gulf of Zakeliczyński (Q112953)

From EU Knowledge Graph
Revision as of 09:55, 7 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Bicycle paths and place of tourism in the Gulf of Zakeliczyński
Project in Poland financed by DG Regio

    Statements

    0 references
    4,633,952.62 zloty
    0 references
    1,112,148.6288 Euro
    13 January 2020
    0 references
    7,354,644.7 zloty
    0 references
    1,765,114.728 Euro
    13 January 2020
    0 references
    67.5 percent
    0 references
    2 January 2018
    0 references
    31 August 2020
    0 references
    GMINA SIEPRAW
    0 references
    Ścieżki rowerowe oraz punkt turystyczny nad Zatoką ZakliczyńskąBudowa 2 kładek stalowodrewnianych wraz z umocnieniem skarp i cieku wodnego oraz z zagospodarowaniem terenu w ciągu trasy nr 4B ciąg pieszy;Budowa drogi pieszorowerowej oraz wykonanie remontu istniejącej drogi gminnej wraz z budową punktu turystycznego z wiatą przystankową, podestem widokowym, schodami terenowymi i małą architekturą trasa nr 5; Budowa drogi pieszorowerowej oraz wykonanie remontu istniejącej drogi gminnej trasa nr 6;Budowa drogi pieszorowerowej oraz punktu turystycznego z placem zabaw, siłownią zewnętrzną, parkingiem wraz z oświetleniem, budową oświetlenia na ul. Nad Zalewem, wieżą widokową, wiatą przystankową i małą architekturą trasa nr 7;Budowa drogi pieszorowerowej oznaczonej numerem 11A, oraz utworzenie punktu turystycznego wraz z małą architekturą. Budowa kładki stalowodrewnianej wraz z zagospodarowaniem terenu oraz przebudową ciągu komunikacyjnego w ciągu trasy nr 11A.W toku opracowania założeń projektu oraz dokumentacji technicznej dla projektu nie wykorzystano formuły konkursu urbanistycznoarchitektonicznego ani konkursu architektonicznego.Łączna długość odcinków tras wynosi 9710m w tym: atrasy w ruchu ogólnym 3547mbtrasy rowerowe lub pieszorowerowe 4991mctrasy piesze 1172m.Projektowane samodzielne trasy pieszorowerowe są zgodne z 46 oraz 47 ust. 1 oraz 48 ust 1 i ust. 2. Zatem zarówno szerokości ścieżek jak i pochylenia podłużne i poprzeczne są zgodne z ww Rozporządzenia Ministra Transportu i Gospodarki Morskiej z dnia 2 marca 1999r. w sprawie warunków technicznych, jakim powinny odpowiadać drogi publiczne i ich usytuowanie Dz.U. z 2016 r., poz.124. szerokość nowobudowanej ścieżki wynosi będzie 3,0 m. (Polish)
    0 references
    The bicycle paths and the tourist point above the Gulf of Zakeliczyt Construction of 2 laying steel frames together with the consolidation of the turbot and the watercourse and to the management of the site within route No 4B (walking string); construction of the roundabout road and the renovation of the existing municipal road, along with the construction of a tourist point with a stop, visibility, field stairs and small-scale architecture, route No 5; Construction of the rugged road and the construction of the existing road No 6 from the municipality; construction of a pedestrian network and a tourist point with a playground, an external cylinder, a car park and lighting; construction of lighting on the street. It will be on the recommendation, with a view of visibility, a stop at a stop and a small architecture, route No 7; construction of a ‘11A’ express road, and the creation of a tourist destination with a small architecture. The design of the project and technical documentation for the project have not been used as part of the design of the design and technical documentation for the project and the design of the design and technical documentation for the project have not been used as part of the design of the design contest or the architectural competition. the 4991mter is in motion for either an atlas of general traffic, 3547mba cycle or mops for pedestrians, 1 172 m.Projektprojekter is in accordance with 46 and 47. 1 and 48 paragraphs 1 and. 2. Therefore, both the breadth of tracks and longitudinal and lateral inclination are in line with the Regulation of the Minister of Transport and Maritime Economy of 2 March 1999 on the technical conditions to be met by public roads and their location (Journal of Laws of 2016, item 124). the width of the newly built path is 3.0 m. (English)
    0 references

    Identifiers

    RPMP.06.03.03-12-0309/17
    0 references