Rehabilitation and development of cultural and tourist destinations of the historical station together with a park in Buszyn. (Q112749)

From EU Knowledge Graph
Revision as of 09:49, 7 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Rehabilitation and development of cultural and tourist destinations of the historical station together with a park in Buszyn.
Project in Poland financed by DG Regio

    Statements

    0 references
    754,842.86 zloty
    0 references
    181,162.28639999998 Euro
    13 January 2020
    0 references
    1,586,100.04 zloty
    0 references
    380,664.0096 Euro
    13 January 2020
    0 references
    65.0 percent
    0 references
    1 June 2016
    0 references
    31 May 2019
    0 references
    OFTALDENT TADEUSZ ŁABNO SPÓŁKA JAWNA
    0 references
    Przedmiotem projektu jest rewitalizacja i zagospodarowanie na cele kulturalno-turystyczne zabytkowego dworku wraz z parkiem w miejscowości Burzyn. Wnioskodawca w ramach przedmiotowego projektu planuje zrealizować 2 zadania: 1. Rewitalizacja dworku. 2. Rewitalizacja i zagospodarowanie parku. Wnioskodawca przyjął optymalne rozwiązania architektoniczne, techniczne i technologiczne, które są zgodne z najlepszymi praktykami. Zaplanowane wydatki są racjonalne - optymalna relacja jakości do ceny. ZAD.1 Prace remontowo- konserwatorskie. Cel przywrócenie odpowiednich walorów estetycznych budynkowi oraz przywrócenie funkcji mieszkalnej jaką miał początkowo. Prace wykonywane w ramach kompleksowego remontu uzgodnione w Tarnowskiej Delegaturze Wojewódzkiego Konserwatora Zabytków w Krakowie. Prace mają na celu zatrzymanie i wyeliminowanie procesów niszczących, usuniecie z elewacji nieestetycznych dokonań poprzednich prac remontowych.Zakres: odnowa wszystkich elewacji budynku w zakresie docieplenia budynku wełną mineralną z gładkim tynkiem oraz wymianę stolarki okiennej i drzwiowej. Wykonane zostanie nowe pokrycie dachowe z dachówki ceramicznej. Wymiana w razie potrzeby częściowa i wzmocnienie konstrukcji dachu. Wzmocnienie drewnianej konstrukcji stropu.Przegrody zewnętrzne odpowiadają wymaganiom izolacyjności cieplnej oraz innym wymaganiom związanym z oszczędzaniem energii. Parametry współczynnika przenikania ciepła dla poszczególnych przegród budowlanych nie przekraczają dopuszczalnych wartości Należy również zająć się zawilgoceniem fundamentów i gruntu i ewentualnym osuszeniem dolnych partii murów oraz izolacji fundamentów. Jak również podbiciem fundamentów aby zapobiec osadzaniu się budynku. Zabezpieczenie przeciwwilgociowe fundamentów i podbicie zapewni trwałość wykonywanych prac remontowych. Postępowanie konserwatorskie obejmuje: a) cokół - należy usunąć warstwę tynku pokrywającego kamieniarkę cokołową; - doczyszczenie elementów kamieniarki metodą piaskowania (Ce-Pe), co (Polish)
    0 references
    The project involves the rehabilitation and development of cultural and tourist destinations of the historic station together with a park in Buszyn. In this project, the applicant plans to carry out 2 tasks: 1. Regeneration of the train station. 2. Regeneration and development of the park. The applicant has accepted optimal architectural, technical and technological solutions that are in line with best practice. The planned expenditure is reasonable — an optimal quality to price ratio. 1 Work and repair works. The objective of restoring the appropriate aesthetic qualities of the building and the restoration of the home function which it originally had. Work carried out as part of the comprehensive renovation works agreed at the Vienna Regional Office for Monuments in Kraków. Work is aimed at halting and eliminating destroying processes, deleting from the façade unaesthetic achievements of previous works. scope: renewal of all the façade of the building as regards the insulation of the building’s mineral wool with smooth plastering and the replacement of window and door frames. A new roof covering for the ceramic roof will be constructed. Replacing, if necessary, the construction of a roof. The reinforcement of the wooden floor structure shall meet the requirements of thermal efficiency and other energy saving requirements. The parameters of the heat transfer coefficient for each building envelope shall not exceed the limit values. it shall also be necessary to deal with the foundation and ground of the ground and the drying of the lower walls of walls and laying the foundations. As well as laying the foundations to prevent the building from being deposited. The protection against humidity of the foundations and the support will ensure that the renovation works are carried out as long as the repair works are carried out. The maintenance proceedings shall include: wheel — remove a layer of plaster to cover coating quarry; — cleaning of the building elements of sandblasting (Ce-Pe), which (English)
    0 references

    Identifiers

    RPMP.06.01.01-12-0125/16
    0 references