Improving the energy efficiency of the municipal buildings of the municipality of Krasocin (Q127643)

From EU Knowledge Graph
Revision as of 07:21, 7 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Improving the energy efficiency of the municipal buildings of the municipality of Krasocin
Project in Poland financed by DG Regio

    Statements

    0 references
    1,797,954.7 zloty
    0 references
    431,509.12799999997 Euro
    13 January 2020
    0 references
    2,569,735.23 zloty
    0 references
    616,736.4552 Euro
    13 January 2020
    0 references
    73.98 percent
    0 references
    31 January 2017
    0 references
    15 November 2018
    0 references
    GMINA KRASOCIN
    0 references
    Projekt zakłada przeprowadzenie głębokiej termomodernizacji 4 obiektów publicznych w gminie: - budynku administr. po byłej poczcie /"wójtostwo", dz. Ew.580/2/ - modern. przegród budowl. w tym ścian w gruncie, ścian zewn., stropu nad ostatnią kondygnacją, wymiana zewn. stolarki okiennej oraz wykonanie robót dodatkowych, modern. instalacji grzewczej - GOPS /dz.ew. 781/2/ - modern. przegród budowl. w tym ścian w gruncie, ścian zewn., dachu, drzwi zewn. oraz wykonanie robót dodatk., remont pokrycia dachowego - SP w Cieślach /dz. Ew.354/ - modern. przegród budowl. w tym ścian piwnic, ścian fundamentowych, ścian zewn., stropu nad ostatnią kondygnacją, dachu, częściowa wymiana zewn. stolarki okiennej oraz wykonanie robót dodatkowych, modern. instalacji ciepłej wody użytk., modern. instalacji grzewczej, wraz z wymianą kotła i osprzętu - UG w Krasocinie /dz. Ew.580/2/ - modern. przegród budowl. w tym ścian w gruncie, ścian zewn., stropu nad ostatnią kondygnacją, wymiana zewn. stolarki okiennej oraz wykonanie robót dodatkowych, modern. instalacji grzewczej W ramach zadania w każdym z budynków zamontowane zostaną m.in. indyw. liczniki ciepła i ciepłej wody użytkowej. Poprzez realizację projektu zwiększona zostanie efektywność energ. budynków, co bezpośrednio realizuje cel szczegółowy działania. Działaniami dodat.: wykonanie dokumentacji projektowej, promocja. Poprzez realizację zadania planowane są do osiągnięcia następujące wskaźniki: - szacowany roczny spadek emisji gazów cieplarnianych - 514,04 tony równow. CO2 - liczba zmodernizowanych źródeł ciepła - 1 szt. - zmniejszenie rocznego zużycia energii pierwotnej w budynkach publ. - 1 681174,00 kWh/rok - powierzchnia użytkowa budynków poddanych termomodernizacji - 2 845,51 m2 - liczba zmodernizowanych energetycznie budynków - 4 szt. - zmniejszenie zużycia energii końcowej w wyniku realizacji projektów - 5 502,03 GJ/rok - ilość zaoszczędzonej energii cieplnej - 5 502,03 GJ/rok (Polish)
    0 references
    The project involves carrying out a deep thermal renovation of 4 public works in the municipality: — The former administrative building of the former Post/wójt, dz. Ew.580/2/— Moderate of enclosure walls in the land, internal wall, costume over the last floor, replacement of window frames and performance of auxiliary works, heating installation for heating installation — GOPS/dz.w. 781/2/— moderator of the building envelope. in the ground, internal wall, roof, external doors and execution of the allowance, renovation of roof covering — SP in Cieszyn/dz. Ew.354/— Moderator of the building envelope, including basement walls, foundation walls, internal walls, costume over the last floor, roof, partial replacement of window frames and performance of ancillary works, heating installation for hot water use., Moderator of the heating installation, including replacement of a boiler and fittings — UG in Krasocinie/dz. Ew.580/2/— Moderate of building partitions inside the ground, internal wall, costume over the last floor, replacement of window frames and performance of ancillary works, heating installation. the task in each of these buildings will include the supply of heat meters and domestic hot water in each of the buildings. By implementing the project, the energy efficiency of buildings will be strengthened and the specific objective of the action is directly achieved. Added: implementation of project documentation, promotion. The following indicators are planned to be achieved through the implementation of the task: — an estimated annual decrease in greenhouse gas emissions — 514,04 tonnes equivalent. CO2 — number of improved heat sources — 1 — reducing annual primary energy consumption in public buildings. 1 681 174.00 kWh/year — usable surface area of buildings undergoing thermomodernisation — 2 845.51 m² — number of modernised buildings — 4. Reduction in final energy consumption due to projects — 5 502,03 GJ/year — amount of heat energy saved — 5 502,03 GJ/year (English)