Thermal modernisation of the nursery school building in the city of Great Britain. (Q112234)

From EU Knowledge Graph
Revision as of 07:18, 7 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal modernisation of the nursery school building in the city of Great Britain.
Project in Poland financed by DG Regio

    Statements

    0 references
    176,169.69 zloty
    0 references
    42,280.7256 Euro
    13 January 2020
    0 references
    691,134.29 zloty
    0 references
    165,872.2296 Euro
    13 January 2020
    0 references
    27.3 percent
    0 references
    1 September 2017
    0 references
    31 December 2018
    0 references
    GMINA WOJNICZ
    0 references
    Budynek posiada dwie kondygnacje nadziemne. Wykonany jest w technologii murowanej ze ścianami z cegły pełnej 42 cm grubości. Stropy żelbetowe i gęsto-żebrowe Fert grubości 25 cm. Budynek jest w całości nieocieplony. Stropodach wyłożono płytą cementowo-wiórową suprema grubości 5 cm – należy go traktować również jako nieocieplony. Nad częścią pomieszczeń parteru znajduje się taras żelbetowy nieocieplony, który wyprowadza ciepło na zewnątrz budynku, zwiększając jeszcze jego straty. Dla budynku wykonano audyt energetyczny. Projekt posiada kompletną dokumentację techniczną wraz z prawomocną decyzją pozwolenia na budowę. Charakterystyka stanu istniejącego: 1. Przegrody zewnętrzne mają niezadawalające wartości współczynnika przenikania ciepła. 2. Okna drewniane są nieszczelne, bez uszczelek. 3. W okresie zimowym występuje nadmierny napływ zimnego powietrza, co zwiększa zużycie gazu na ogrzewanie. 4. Instalacja ciepłej wody użytkowej jest przestarzała (stare podgrzewacze elektryczne). 5. Instalacja c.o. typu tradycyjnego z regulacją systemu centralną ręczną na kotle gazowym z 1999 roku, który jest mocno wyeksploatowany. Instalacja rurowa z lat 50-tych, grzejniki bez termostatów, odpowietrzanie wykonano na pionach. Brak izolacji rur c.o. Usunięcie skutków zaistniałych problemów: 1. Należy ocieplić przegrody zewnętrzne i zapewnić obecnie wymagany opór cieplny. 2. Konieczna jest wymiana drewnianych okien na okna z profili PCV o wymaganym współczynniku przewodzenia ciepła. 3. Obniżyć zużycie ciepła poprzez wprowadzenie wentylacji kontrolowanej z zastosowanie nawiewników. 4. Należy zastosować podgrzewanie c.w.u. w zasobniku kotłem gazowym kondensacyjnym oraz zastosować perlatory. 5. Należy wymienić instalację c.o. na nową, odpowiadającą obecnym standardom w zakresie przewodów, grzejników, regulacji, zastosować energooszczędne kotły gazowe kondensacyjne dla całego budynku. (Polish)
    0 references
    The building has two levels of hopes. It is constructed in a mal-wall technology with a wall thickness of 42 cm thick. 25 cm glinker and cm thick but not less steep (cm thick). The building is completely insulated. The ceilings are lined with a 5 cm cement/particle board, and must also be treated as not being insulated. The part of the ground floor is located with a non-insulated terrace which vents the heat to the outside of the building, increasing its losses. An energy audit was carried out for the building. The project has a complete technical file with the final decision of the building permit. Existing status: 1. The building envelope is of unsatisfactory value for the heat transfer coefficient. 2. Wooden windows are leaking without sealing. 3. In winter, there is an excess flow of cold air, which increases the consumption of gas for heating. 4. The installation of hot water is outdated (old electric heaters). 5. An installation of a secondary system with a manual system on the gas boiler from 1999, which is heavily used. The piping of the 50s, radiators without thermostats, was carried out on perpendiculars. No isolation of the effect (s) of the problems encountered: 1. The building envelope is warming up and the required thermal resistance now needs to be ensured. 2. It is necessary to replace wooden windows into PCV windows with the required heat transfer coefficient. 3. Reduce heat consumption by introducing ventilation with controlled conditions. 4. Use heating hot service water heating boilers in the gas condensing boiler and use percolators. 5. Reference should be made to the installation of a c.o installation, which corresponds to the current standards for cables, radiators and regulations, for the use of energy efficient gas condensing boilers for the whole building. (English)
    0 references

    Identifiers

    RPMP.04.03.02-12-0212/16
    0 references