Reducing motorised traffic at the centre of the city of Millia through the construction of a cycle-ring road for the city. (Q95747)

From EU Knowledge Graph
Revision as of 03:06, 7 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Reducing motorised traffic at the centre of the city of Millia through the construction of a cycle-ring road for the city.
Project in Poland financed by DG Regio

    Statements

    0 references
    818,675.97 zloty
    0 references
    196,482.2328 Euro
    13 January 2020
    0 references
    963,148.2 zloty
    0 references
    231,155.56799999997 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    15 February 2018
    0 references
    31 October 2018
    0 references
    GMINA MILICZ
    0 references
    Przedmiotem inwestycji jest wykonanie ścieżki pieszo-rowerowej przy rzece Barycz oraz jej połączenie z istniejącą ścieżką rowerową przy ul. Wojska Polskiego w Miliczu. Około 90 % powierzchni gminy wchodzi w skład Parku Krajobrazowego utworzonego z myślą o ochronie terenów leśnych i stawowych. Analizowany teren znajduje się przy rzece Barycz. Obecnie tereny zielone przy rzece są nie zagospodarowane. Aby zwiększyć dostępność przewiduje się połączenie ich z otoczeniem za pomocą ciągu pieszo-rowerowego, ścieżek rowerowych jak i dróg dojazdowych.Dzięki realizacji projektu nastąpi poprawa warunków poruszania się na rowerze w mieście, poprawa bezpieczeństwa ruchu drogowego, popularyzacja roweru jako przyjaznego dla środowiska środka transportu, poprawa jakości życia przez zwiększenie swobody wyboru środka transportu. Inicjatywa przeprowadzenia inwestycji zainicjowana została przez gminę Milicz, która jednocześnie jest wnioskodawcą oraz realizatorem projektu. Działania zaplanowane w ramach realizacji projektu stanowią niezbędny element poprawności wykonania inwestycji.Ścieżka zaprojektowana zostanie zgodnie z zapisami rozporządzenia Ministra Transportu i Gospodarki Morskiej z dnia 2.03.1999 r. w sprawie warunków technicznych, jakim powinny odpowiadać drogi publiczne i ich usytuowanie oraz z przepisami ustawy Prawo o ruchu drogowym, a także według Standardów projektowych i wykonawczych dla infrastruktury rowerowej województwa dolnośląskiego – załącznik do uchwały nr 1987/V/16 Zarządu Województwa Dolnośląskiego z dnia 22.03.2016 r.. Wartość wydatków oszacowana została na podstawie kosztorysu, którego sporządzenie zostało zlecone wykwalifikowanej w tym zakresie osobie. Planowany zakres prac obejmuje niezbędne wydatki. Inwestorem inwestycji jest gmina Milicz, w związku z czym zapewnione zostanie niezbędne zaplecze organizacyjno-techniczne niezbędne z punktu widzenia prawidłowej realizacji projektu. Przeprowadzenie całości inwestycji zostało zaplanowane na 2017 rok. (Polish)
    0 references
    The purpose of the investment is to carry out a pedestrian path along the Barycz river and connect it to an existing bicycle path at ul. The Polish Army in Milu. Approximately 90 % of the area of the municipality is part of the Landscape Park for the protection of forest and pond areas. The site is located on the Barycz river. Currently the green areas of the river are not developed. In order to increase accessibility, it is envisaged to link them to their surroundings by means of pedestrians and cyclists, cycle paths and access roads. the project will improve cycling conditions in the city, improve road safety, promote cycling as an environmentally friendly means of transport, improve quality of life by increasing the freedom of choice of means of transport. The investment initiative has been initiated by the municipality of Militia, which is both the applicant and the project leader. The actions planned in connection with the implementation of the project are an essential element of the correct implementation of the investment. in accordance with the provisions of the Regulation of the Minister for Transport and the Maritime Economy of 2.03.1999 on the technical conditions to be met by public roads and their location and with the provisions of the Road Traffic Act, and in accordance with the provisions of the Road Traffic Act, and in accordance with the provisions of the “Road Traffic Act”, the annex to Resolution No 1987/V/16 of the Administrative Board of Dolnośląskie Province of 22.03.2016 is attached. The value of the expenditure was estimated on the basis of the cost estimate which a qualified person was required to draw up. The planned scope of work includes the necessary expenditure. The investment investor is a municipality of Militia and therefore the necessary organisational and technical facilities necessary for the correct implementation of the project will be provided. The whole of the investment has been planned for 2017. (English)
    0 references

    Identifiers

    RPDS.03.04.01-02-0006/16
    0 references