Comprehensive disposal of waste containing asbestos in a multi-dwelling apartment building at ul. Spring 291 of RadLines (Q124334)

From EU Knowledge Graph
Revision as of 22:25, 6 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Comprehensive disposal of waste containing asbestos in a multi-dwelling apartment building at ul. Spring 291 of RadLines
Project in Poland financed by DG Regio

    Statements

    0 references
    265,399.65 zloty
    0 references
    63,695.916000000005 Euro
    13 January 2020
    0 references
    490,628.4 zloty
    0 references
    117,750.816 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    8 June 2016
    0 references
    31 December 2017
    0 references
    SPÓŁDZIELNIA MIESZKANIOWA MARCEL
    0 references

    50°2'28.3"N, 18°27'52.9"E
    0 references
    Projekt pn. "Kompleksowe unieszkodliwianie odpadów zawierających azbest w wielorodzinnym budynku mieszkalnym przy ul. Wiosny Ludów 291 w Radlinie" polega na demontażu płyt acekolowych zawierających azbest z elewacji budynku, a także ich utylizacji oraz na termomodernizacji ścian zewnętrznych budynku przez przymocowanie do ścian od strony zewnętrznej płyt styropianowych o grubości 16 i 14 cm, płyt wełny mineralnej o grubości 16 cm i pokryciem ich cienką wyprawą elewacyjną wzmocnioną tkaniną zbrojącą. Ocieplenie ścian tą metodą będzie wykonane ściśle wg wytycznych szczegółowych producenta wybranego systemu. Nadzór nad wykonaniem ocieplenia tą metodą będzie sprawowany przez osoby uprawnione o odpowiednich kwalifikacjach zawodowych. (Polish)
    0 references
    The project entitled: “A comprehensive disposal of waste containing asbestos in a multi-apartment block of a residential building at ul. The ‘Rady’ spring of 291 works to dismantle the asbestos fibres containing asbestos from the façade of the building as well as their disposal and the thermal renovation of the building’s walls by attaching to the walls of the outer side panels between 16 and 14 cm in the panels, the mineral wool panels with a thickness of 16 cm and the cover of their thin film with an enhanced wired fabric. The insulation of walls will be carried out strictly according to the specific guidelines of the manufacturer of the chosen system. Supervision of the implementation of warming will be carried out by qualified persons with appropriate professional qualifications. (English)
    0 references

    Identifiers

    RPSL.05.02.02-24-08B6/17
    0 references