Increase the growth potential of STAMBET-BUD and increase its competitiveness in the industry by engaging with the scientific unit. (Q107817)

From EU Knowledge Graph
Revision as of 19:58, 6 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Increase the growth potential of STAMBET-BUD and increase its competitiveness in the industry by engaging with the scientific unit.
Project in Poland financed by DG Regio

    Statements

    0 references
    97,500.0 zloty
    0 references
    23,400.0 Euro
    13 January 2020
    0 references
    159,900.0 zloty
    0 references
    38,376.0 Euro
    13 January 2020
    0 references
    75.0 percent
    0 references
    1 March 2016
    0 references
    31 December 2016
    0 references
    "STAMBET-BUD" MROCZKOWSKA, MROCZKOWSKI SPÓŁKA JAWNA
    0 references

    52°6'23.8"N, 20°37'52.7"E
    0 references
    Firma STAMBET-BUD Mroczkowska Mroczkowski s.j. z siedzibą w Grodzisku Mazowieckim jest wytwórnią betonu towarowego od 1993 roku. W ciągu 20 lat działalności znaleźliśmy się w ścisłej czołówce betoniarni działających na terenie Mazowsza. Posiadamy certyfikat rzetelnej firmy. Nasz sukces zawdzięczamy przede wszystkim sprzedaży najwyższej jakości betonu, piasku, żwiru i innych naszych wyrobów. W związku z potrzebą ciągłego rozwoju zdecydowaliśmy się na rozbudowę naszego potencjału technicznego o nową linię do produkcji betonu. W celu jej automatyzacji konieczne jest opracowanie innowacyjnego systemu sterującego procesem z szczególnym uwzględnieniem betonu towarowego. Ze względu na specyfikę procedur wytwarzania oraz nasze oczekiwania wobec systemu (swoboda dozowania odpowiednich komponentów, dobór odpowiednich parametrów wilgotności, zgodność produkcji z laboratoryjną recepturą itp.) koniecznym jest stworzenie inteligentnych i funkcjonalnych rozwiązań opartych na sprecyzowanych pod kątem naszej firmy algorytmach przeliczeniowych. Do tej pory cały proces technologiczny odbywał się ręcznie, co z jednej w wielu przypadkach powodowało odchylenia od normy a także znacząco zwiększało koszty produkcji (źle przygotowana mieszanka musiała zostać zutylizowana a beton wytworzony ponownie). W celu wyeliminowania ww. wad konieczne jest (w oparciu o nasze wskazania oraz audyt na miejscu) przeprowadzenie prac badawczych nad aplikacją sterującą pełnym procesem technologicznym. Ze względu na szereg ww. funkcjonalności a także zastosowanie komputerowych mechanizmów kontrolujących (funkcje dozoru produkcyjnego oraz kontrolera jakości) konieczne jest powierzenie wykonania ww. zadania profilowanej uczelni wyższej. Złożoność procesów oraz ich pełna integracja wymaga prowadzenia badań nad kształtem architektury zintegrowanego systemu wraz z opracowaniem prototypu demonstracyjnego w postacie oprogramowania. Do tej pory firma nie prowadziła ani prac badawczych ani nie wdrażała ich wyników. (Polish)
    0 references
    The company STAMBET-BUD Myearkowska Mannzkowski s.j. with its registered office in Grodzisk Mazowiecki is a manufacturing company since 1993. Within 20 years of activity, we have found themselves at the top of the betonic in the Masovia area. We have a certificate from a reliable company. In particular, our success is thanks to the sale of excellent concrete, sand, gravel and other products. In view of the need for continuous development, we have decided to build up our technical capacity with a new line for concrete production. For the purpose of automation it is necessary to develop an innovative process steering control with a focus on concrete freight. Due to the specific nature of manufacturing procedures and our expectations towards the system (the freedom of the respective components, the choice of the appropriate parameters of moisture content, conformity of production with laboratory recipe, etc.), it is necessary to set up smart and functional solutions based on the precision of our company’s conversion algorithm. So far, the entire process has been carried out manually, which in many cases has led to deviations from the standard and also significantly increased production costs (ill-prepared mixture had to be disposed of and concrete produced again). In order to eliminate these shortcomings, it is necessary (based on our indications and an on-the-spot audit) to carry out research on the process of the full process control application. In view of the various functions referred to above, as well as the use of computer surveillance mechanisms (production surveillance functions and quality control), it is necessary to entrust the performance of the above mentioned tasks to a higher education establishment. The complexity of the processes and their full integration requires research into the architecture of the integrated system with the development of a software demonstration prototype. So far, the company has not carried out or performed research and results. (English)
    0 references

    Identifiers

    RPMA.01.02.00-14-4514/16
    0 references