Development and improvement of the use of solar energy in urban organisational units in Szczecin — stage II (Q137690)

From EU Knowledge Graph
Revision as of 19:27, 26 March 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Development and improvement of the use of solar energy in urban organisational units in Szczecin — stage II
Project in Poland financed by DG Regio

    Statements

    0 references
    5,681,560.59 zloty
    0 references
    1,363,574.5415999999 Euro
    13 January 2020
    0 references
    6,684,188.94 zloty
    0 references
    1,604,205.3456000001 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 June 2016
    0 references
    31 August 2019
    0 references
    GMINA MIASTO SZCZECIN
    0 references
    Przedmiotem projektu jest montaż instalacji fotowoltaicznej na dachach 23 budynków miejskich jednostek organizacyjnych w Szczecinie. Budynki są obiektami użyteczności publicznej: obiekty, w których funkcjonują jednostki oświatowe – (11 obiektów); obiekty, w których funkcjonują jednostki pomocy społecznej - (10 obiektów) i obiekty w których funkcjonują przedszkola – (2 obiekty). Projekt realizuje najbardziej efektywny sposób użytkowania zakładający wariant z włączeniem do sieci i wykorzystaniem maksymalnie dostępnej efektywnej powierzchni w celu uzyskania produkcji maksymalnej ilości energii elektrycznej nie przekraczającej zapotrzebowania na nią danego obiektu. Na dachach zostanie zamontowanych 2446 paneli o mocy 280 kWp. Łączna moc jaka zostanie zainstalowana na dachach budynków wyniesie 684,92kWp. Produkcja energii elektrycznej z nowo wybudowanych/ nowych mocy wytwórczych instalacji wykorzystujących OZE wyniesie 665,46 MWhe/rok. Planowane instalacje PV pokryją średnio ok. 58% zapotrzebowania na energię elektryczną budynków. Efekty jakie zostaną osiągnięte w wyniku realizacji projektu to redukcja emisji CO2 o 548,04 MgCO2/rok. Projektowana instalacja fotowoltaiczna składać się będą z następujących elementów wyposażenia: • modułów fotowoltaicznych, • inwerterów, • systemów montażowych. Moduły fotowoltaiczne: Instalacja składać się będzie z modułów fotowoltaicznych polikrystalicznych o mocy szczytowej 280 Wp. Parametry pojedynczego modułu w warunkach STC (standardowe warunki testu: napromieniowanie 1000 W/m2, temperatura ogniw 25 °C i współczynnik masy powietrza AM 1,5). Inwertery: Urządzeniami odpowiedzialnymi za współpracę z generatorami będą beztransformatorowe falowniki trójfazowe o maksymalnym napięciu wejściowym 1000 V i minimalnym napięciu wejściowym 150 V. System montażowy: Jako konstrukcja wsporczą instalacji PV wykorzystany zostanie aluminiowy system montażowy dobrany do każdego dachu indywidualnie. (Polish)
    0 references
    The project involves the installation of a photovoltaic installation on the rooftops of 23 urban buildings in Szczecin. Buildings are public utility facilities: premises where educational entities are operated (11 sites); facilities serving social assistance units (10 sites) and nursery facilities (2 sites). The project shall deliver the most efficient use, with the option to integrate into the network and to use the maximum effective area available in order to obtain the production of a maximum amount of electricity that does not exceed its demand. On rooftops 2446 panels with a capacity of 280 kWp will be installed. The total power to be installed on the roof of the buildings will be 684,92kWp. Production of electricity from newly built/new generation capacity of RES installations will be 665,46 MWhe/year. Planned PV installations will cover on average around 58 % of the electricity demand for buildings. The results of the project are the reduction of CO2 emissions by 548,04 MgCO2/rok. The design of the photovoltaic installation will consist of the following items of equipment: • solar modules,• inverters,• assembly systems. Solar modules: The installation will be composed of polycrystalline photovoltaic modules with a peak capacity of 280 Wp. The parameters of the individual module under the conditions of the STC (standard test conditions: irradiation 1000 W/m², temperature of cells 25 °C and air mass ratio AM 1,5). Inverters: The equipment responsible for cooperation with generators will be non-transformer of the three-phase wave with a maximum input voltage of 1000 V and a minimum input voltage of 150 V. Assembly system: An aluminium PV installation will be used as a structure to support the installation of an aluminium assembly system chosen for each roof individually. (English)
    0 references

    Identifiers

    RPZP.02.10.00-32-A046/16
    0 references