Construction of cycle roads in the municipality of Kołbaskowo in order to gain communication and improve security within the metropolitan area — stage II (Q137554)

From EU Knowledge Graph
Revision as of 19:17, 26 March 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of cycle roads in the municipality of Kołbaskowo in order to gain communication and improve security within the metropolitan area — stage II
Project in Poland financed by DG Regio

    Statements

    0 references
    4,500,000.0 zloty
    0 references
    1,080,000.0 Euro
    13 January 2020
    0 references
    5,641,090.7 zloty
    0 references
    1,353,861.768 Euro
    13 January 2020
    0 references
    79.77 percent
    0 references
    27 May 2019
    0 references
    31 December 2020
    0 references
    GMINA KOŁBASKOWO
    0 references
    Analizowane przedsięwzięcie pn.: „Budowa dróg rowerowych na terenie Gminy Kołbaskowo w celu uzyskania dostępności komunikacyjnej i poprawy bezpieczeństwa w ramach obszaru metropolitalnego- etap II” obejmuje swoim zakresem: 1. ODCINEK KARWOWO-PRZECŁAW: 1.1. budowa drogi gminnej o dł. 126 m, 1.2. budowa drogi pieszo-rowerowej o szer. 3 m od i dł. 2504 m., 2. ODCINEK KAMIENIEC-KOŁBASKOWO: 2.1. budowa ścieżki pieszo-rowerowej o szer. 3 m i dł. 1700 m, 2.2. przebudowa drogi gminnej wew. o dł. 398,57 m. - - - Etapy realizacji: * ODC. KARWOWO-PRZECŁAW: - Wybór Wykonawcy dokumentacji projektowej oraz robót w formule „zaprojektuj i wybuduj”: 2 kw. 2019, - Dokumentacja projektowo-wykonawcza: 2 kw. 2019 – 1 kw. 2020, - Usługa Nadzór Inwestorski [koszt poza projektem]: 2 – 4 kw. 2020, - Roboty budowlane: 2 – 4 kw. 2020, - Promocja projektu [koszt poza projektem]: 4 kw. 2020, - Odbiór końcowy: 4 kw. 2020. * ODC. KAMIENIEC-KOŁBASKOWO: - Wybór Wykonawcy prac budowlanych: 2 kw. 2019, - Usługa Nadzór Inwestorski [koszt poza projektem]: 2 – 4 kw. 2019, - Roboty budowlane: 2 – 4 kw. 2019, - Promocja projektu [koszt poza projektem]: 4 kw. 2020, - Odbiór końcowy: 4 kw. 2019. - - - Wnioskodawca posiada w ramach opisanych struktur majątkowo-administracyjnych zasoby techniczne, kadrowe i wiedzę gwarantujące uruchomienie infrastruktury bezpośrednio po zakończeniu projektu (SW 3.2). Projekt będzie realizowany za pomocą Zespołu ds. Wdrażania Projektu oraz podmiotów zew. (SW 3.2.2) - - - Zgodność projektu z zapisami pkt 1.2 Regulaminu naboru: - typ projektu – 1, - inwestycja wskazana w Strategii i wdrażana na obszarze ZIT SOM, - wsparcie na działania usprawniające komunikację publiczną, - dotyczy obszaru, dla którego stworzony został PGN oraz PZMM (SW 2.2.7), - przedmiot projektu znajduje się na terenie strefy przemysłowej, - inwestycja powiązana z działaniami „miękkimi” w ramach PGN. (Polish)
    0 references
    The project: ‘Construction of bicycle roads in the municipality of Kolbaskowo in order to obtain communication and improve security within the metropolitan area — phase II’, covers the following: 1. SECTION KARWAOWO-TRANSFER: 1.1. construction of a municipal road with the length of the municipality. 126 m, 1.2. 3 m from and from the length of the 2 504 m, 2. SECTION KAMIENIEC-KOŁBASKOO: 2.1. construction of the forward path. 3 m and length 1 700 m, 2.2th reconstruction of the municipal road by length 398.57 m — - — Steps towards completion: * C. KARWOOO-TRANSFER: — Selection of design documentation and “design and demolition” works: 2 quarter 2019, — Design/Executive documentation: 2 quarter 2019-1 quarters 2020, — Investor’s supervision [cost out of project]: 2-4 quarters 2020, — Construction works: 2-4 quarters 2020, — Project promoter [cost out of project]: 4 quarter 2020, — Final acceptance: 4 quarter 2020. * C. KAMIENIEC-KOŁBASKOO: — Selection of the Contractor of the construction work: 2 quarter 2019, — Investor’s supervision [cost out of project]: 2-4 quarters 2019, — Construction works: 2-4 quarters 2019, — Project promoter [cost out of project]: 4 quarter 2020, — Final acceptance: 4 quarter 2019. — — — The applicant has, within the framework of the property and administrative structures described, technical, personnel and knowledge to ensure that the infrastructure is put in place immediately after the end of the project (SW 3.2). The project will be carried out with the assistance of the Team Implementation of the Project and of the entities of the (s3.2.2) — - — Compatibility of the project with the provisions of point 1.2 of the selection procedure: — project type — 1, — investment indicated in the Strategy and implemented in the area of ITI SOM — support to public communication activities, — concerns the area for which the PGN and PZMM (SW 2.2.7) are created, the subject of the project is located in an industrial area, an investment linked to the ‘soft’ measure under the PGN. (English)
    0 references

    Identifiers

    RPZP.02.02.00-32-0004/19
    0 references