We include good energy! Construction of small RES installations in Biała Podlaska. (Q104806)

From EU Knowledge Graph
Revision as of 18:17, 26 March 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
We include good energy! Construction of small RES installations in Biała Podlaska.
Project in Poland financed by DG Regio

    Statements

    0 references
    8,997,231.26 zloty
    0 references
    2,159,335.5023999996 Euro
    13 January 2020
    0 references
    12,269,394.19 zloty
    0 references
    2,944,654.6056 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    15 April 2016
    0 references
    30 July 2020
    0 references
    GMINA MIEJSKA BIAŁA PODLASKA
    0 references
    W ramach projektu zrealizowanych zostanie 829 instalacji OZE, w tym: - 304 zestawy kolektorów słonecznych o łącznej mocy 1,15 MW, - 201 instalacji fotowoltaicznych o łącznej mocy 0,64 MW. - 228 powietrznych pomp ciepła o łącznej mocy 0,39 MW, - 96 pieców na biomasę o łącznej mocy 1,52MW. Całkowita moc zainstalowana dla energii cieplnej: 3,06 MW, elektrycznej: 0,64 MW. Zestawy kolektorów słonecznych i fotowoltaicznych w części zlokalizowane będą na elewacjach i dachach prywatnych budynków mieszkalnych (projekt nie uwzględnia obiektów publicznych i obiektów z prowadzoną działalnością gospodarczą). Ich wysokość, łącznie ze stelażami konstrukcyjnymi, nie przekroczy 3 m. Wdrożony zostanie system do zarządzania energią z OZE w oparciu o technologie TIK, w którego skład wejdą: m.in. moduł do pobierania danych z instalacji oraz moduł do wizualizacji danych z instalacji na interaktywnych mapach. Udostępniony zostanie także formularz do transakcji on-line. Dostępne będą następujące funkcje: zawieranie umów, przesyłanie informacji o stanie liczników, informowanie o stanie opłat i rozliczeń, przesyłanie skarg i uwag. Umożliwi również zgłaszanie zapotrzebowania na zakup paliwa (biomasy) dla użytkowników pieców na biomasę w ramach wspólnych zamówień publicznych. Utworzone zostanie jedno miejsce pracy - do obsługi infrastruktury zatrudniona zostanie osoba pochodząca z marginalizowanych na terenie miasta grup społecznych. Poprzez ograniczenie emisji "niskiej" z palenisk domowych, w tym w szczególności pyłu zawieszonego PM10, którego ponadnormatywne stężenia 24-godzinne stwierdzono w całej strefie lubelskiej, projekt przyczynia się do realizacji założeń "Programu ochrony powietrza dla strefy lubelskiej" (została zakwalifikowana jako strefa C, a tym samym zobligowana do opracowania Programu). W samym mieście stwierdzono przekroczenia stężeń: PM10, Pył PM2,5 oraz benzoapirenu, co potwierdza potrzebę i racjonalność przedmiotowego przedsięwzięcia. (Polish)
    0 references
    829 RES installations will be implemented as part of the project, including: — 304 solar collectors units with a total capacity of 1.15 MW, — 201 photovoltaic installations with a total capacity of 0.64 MW. 228 heat pumps with a total capacity of 0.39 MW, — 96 biomass furnaces with a total capacity of 1.52 MW. Total installed capacity for thermal energy: 3.06 MW, electric: 0.64 MW. The solar and solar collectors kits will be located on the façade and rooftops of private dwellings (the project does not take into account public works and business premises). Their amount, including the construction stepies, shall not exceed 3 m. a system will be implemented for the management of energy from RES based on ICT which will be composed of: among others, the installation data module and the module to visualise data from an installation on interactive maps. A form for online transactions will also be made available. The following functions will be available: the conclusion of contracts, the transmission of information on the status of meters, information on the state of charges and billing, the sending of complaints and observations. It will also make it possible to report the demand for the purchase of biomass fuel for users of biomass furnaces in the framework of joint procurement contracts. One place of work will be created — a person coming from marginalised communities in the city of social groups will be recruited as part of the infrastructure. By reducing the “low” emissions of domestic furnaces, including in particular particulate matter PM10, which has been found in the whole 24-hour limit in the Lubelskie region, the project contributes to the objectives of the ‘air quality programme for the Lublin area’ (classified as Area C and thus obliged to draw up a programme). In the city itself, concentrations have been identified: PM10, PM2,5 and TFP, which confirms the need and soundness of the project. (English)
    0 references

    Identifiers

    RPLU.04.01.00-06-0251/16
    0 references