Construction of a school pitch, refurbishment of a gym and the purchase of teaching aids in the School of Lifelong Learning in Lubaczów (Q119289)

From EU Knowledge Graph
Revision as of 18:09, 26 March 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of a school pitch, refurbishment of a gym and the purchase of teaching aids in the School of Lifelong Learning in Lubaczów
Project in Poland financed by DG Regio

    Statements

    0 references
    912,862.42 zloty
    0 references
    219,086.9808 Euro
    13 January 2020
    0 references
    1,207,505.25 zloty
    0 references
    289,801.26 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    22 December 2016
    0 references
    29 December 2017
    0 references
    POWIAT LUBACZOWSKI
    0 references
    Celem ogólnym projektu jest poprawa warunków edukacji ogólnej ponadgimnazjalnej w powiecie lubaczowskim. Cele szczegółowe projektu to: - poprawa dostępności budynku sali gimnastycznej LO dla osób niepełnosprawnych, - poprawa warunków realizacji minimum programowego w zakresie sprawności fizycznej uczniów LO poprzez zwiększenie dostępności do infrastruktury sportowej, - wyposażenie pracowni biologicznej LO w sprzęt i pomoce dydaktyczne umożliwiające przekaz wiedzy w najwyższym standardzie. W ramach zadania zostaną wykonane: 1) Boisko wielofunkcyjne o nawierzchni syntetycznej o wym. 32,0x44,0m (po 2 pola gry do koszykówki i siatkówki, pole gry do piłki ręcznej); 2) kort tenisowy o nawierzchni z trawy sztucznej o pow. 667,,22 m2,; 3) Ogrodzenie boiska wielofunkcyjnego i kortu tenis – 221,00 mb; 4) Odwodnienie płyty boiska (przyłącz kanalizacji deszczowej, rów otwarty z ciekiem betonowym drogowym na dnie, drenaż odwadniający kort i boisko wielofunkcyjne), 5) Niezbędne dojście do boisk z kostki betonowej o szerokości 2,0 m; 6) Podjazd dla niepełnosprawnych z dojściem wykonany z kostki brukowej 6 cm; 7) Demontaż jednych starych drzwi zewnętrznych i montaż nowych dwuskrzydłowych (przy podjeździe); 8) Przebudowę szatni i zaplecza sanitarnego łącznie z magaz. na sprzęt sportowy. Roboty obejmują wyburzenia i zamurowania, wymianę posadzek łącznie z ich dociepleniem styropianem grubości 10cm, wymianę stolarki drzwiowej wewnętrznej, demontaż i montaż nowych instalacji c.o. wod. kan i elektr.. Dzięki dociepleniu posadzek, wymianie instalacji CO oraz elektrycznej aluminiowej na miedzianą łącznie z montażem lamp energooszczędnych ulegnie poprawie efektywności energetycznej budynku; 9) Zakupione pomoce dydaktyczne do pracowni biologicznej (laptop-szt. 8; projektor multimedialny-szt.1; ekran elektryczny-szt.1; telewizor 49”-szt.1; mikroskop szkolny z kamerą USB – szt. 8; gablota ekspozycyjna stojąca – szt. 5; stół laboratoryjny wyspowy z szafkami i nadstawkami na odczynniki– 1 szt. (Polish)
    0 references
    The general objective of the project is to improve the conditions for general upper-secondary education in the novads of lubachev. The specific objectives of the project are to: — improving the accessibility of the building hall building room LO for people with disabilities — improving the conditions for the implementation of a minimum programme for the physical well-being of LO students by increasing accessibility to sports infrastructure, — the equipment of a biological worker LO in equipment and teaching aids to enable knowledge to be transferred to the highest standard. The following tasks will be carried out: 1) Polyvalent Boisko with a synthetic surface. 32,0x44.0 m (2 fields of basketball and volleyball, handball game fields); 2) teiy cord with an artificial grass surface. 667.22 m²; 3) Tanning of the multifunctional sports field and the tennis player — 221,00 mb; (4) drainage of the pitches (connection of storm-water system, open with a road concrete road to the bottom, drain drainage and the multifunctional ground), (5) Unneeded access to the field of concrete cube 2.0 m wide; 6) a lift for a disabled with a milking ankle, made of 6 cm cube; (7) The installation of one old external door and the installation of new two wing doors (at the crossing); 8) Reconstruction of cloakrooms and sanitary facilities, including sports equipment. The works include demolition and murdering, replacement of the floor including their insulation in a thickness of 10 cm, replacement of doors of internal doors, dismantling and installation of new cane-water installations. The insulation of the floor, the replacement of the CO and aluminium electricity on copper combined with the installation of energy efficient lamps will improve the energy efficiency of the building; 9) The teaching aids to a biological worker (laptop computers) have been purchased. 8; projector multimedialy-sz.1; electric screen (.1); television 49’ -unit 1; USB stick school microscope 8; display floating range — pcs. 5; laboratory table sent out of cupboards and overrates (1) (English)
    0 references

    Identifiers

    RPPK.06.04.03-18-0026/16
    0 references