Thermal modernisation of the three public buildings, including the replacement of the source of heat and the installation of renewable energy sources in the municipality of the Radmno (Q118681)

From EU Knowledge Graph
Revision as of 17:55, 26 March 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal modernisation of the three public buildings, including the replacement of the source of heat and the installation of renewable energy sources in the municipality of the Radmno
Project in Poland financed by DG Regio

    Statements

    0 references
    2,238,155.41 zloty
    0 references
    537,157.2984 Euro
    13 January 2020
    0 references
    3,045,388.94 zloty
    0 references
    730,893.3456 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    29 December 2015
    0 references
    31 December 2017
    0 references
    GMINA RADYMNO
    0 references
    Głównym celem realizacji projektu jest zmniejszenie zużycia energii końcowej/pierwotnej, obniżenie kosztów wytwarzania energii cieplnej oraz energii elektr. w bud. objętych przedmiotowym projektem, wytwarzanie energii elektr./cieplnej z OZE oraz zmniejszenie ilości zanieczyszczeń do atmosfery.Projekt dot. termomodernizacji wraz z wymianą źródła ciepła oraz montażem OZE 3 bud. użyt. publ.: ZS w Łazach, ZS w Ostrowie, ZS Korczowa budynek w Młynach.W ZS w Łazach zaplanowano:-docieplenie stropu pod nieogrz. poddaszem-482,00m2-docieplenie ścian zewn.-524,6m2-docieplenie podłóg na gruncie-482,00m2-modernizację inst. ogrzewania wraz z montażem kotła na biomasę o mocy 100kW-wymianę okien o łącznej pow.181,64m2 i drzwi o łącznej pow.11,60m2-montaż paneli PV o mocy 3,36kWW ZS Korczowa, bud. w Młynach zaplanowano:-docieplenie stropu pod nieogrz. poddaszem-443,00m2-docieplenie ścian zewn.-611,60m2-docieplenie podłóg na gruncie-405,80m2-modernizację inst. ogrzewania wraz z montażem kotła na biomasę o mocy 60kW-wymianę okien o łącznej pow. 112,82m2 i drzwi o łącznej pow. 17,84m2-montaż paneli PV o mocy 3,08kWW ZS w Ostrowie zaplanowano:-wymianę okien o łącznej pow. 308,62m2 i drzwi o łącznej pow. 13,51m2-docieplenie stropu pod nieogrz. poddaszem-472,3m2-docieplenie dachów-696,5m2-docieplenie ścian zewn.-1452,20m2-docieplenie podłóg na gruncie-1083,50m2-modernizację inst. ogrzewania wraz z montażem kaskady 2 kotłów gazowych kondensacyjnych, każdy o mocy 100kW-montaż paneli PV o mocy 4,20kW-inst. kol. słon. o mocy 6,61kWRealizacja inwest. pozwoli na uzyskanie:a)w ZS w Łazach wskaźnika EP na poziomie 47,55kWh/(m2*rok)oraz zostanie zmniejszone zapotrzeb. na zużycie energii o 60,79%b)w ZS w Korczowej, budynek w Młynach wskaźnika EP na poziomie 59,93kWh/(m2*rok) oraz zostanie zmniejszone zapotrzeb. na zużycie energii o 63,17%c)w ZS w Ostrowie wskaźnika EP na poziomie 80,62kWh/(m2*rok) oraz zostanie zmniejszone zapotrzebowanie na zużycie energii o 55,69% (Polish)
    0 references
    The main objective of the project is a reduction in final/primary energy consumption, a reduction in the cost of generating heat and electricity in the construction project, the production of electricity from RES and the reduction of atmospheric pollutants. ZS in Laami, ZS in Ostrów, ZS Korczowa building in Młnachch.In ZS, in Łazko, is designed to heat up the floor to 482.00 m² — for heating — 482.00 m² — for heating the floor on land — 524.6 m² — for the modernisation of the heating body and the installation of a 100 kW-exchange of windows with a total of more than 181.64 m² and the door with a total of 11.60 m² — installation of the panel of the panels, with 3,36kWW ZS Korczowa, to be constructed. 112.82 m² and a combined door. 17.84 m² — installation of PV panels with a 3,08xWW ZS panel in Ostrów is planned for the replacement of windows of total area. 308.62 m² and a combined door. 13.51 m² -heat insulation floor for 472.3 m² — insulation of roof walls — 696.5 m² — heat insulation floor for land — 1 452.20 m² — for the heating of floor to 1 083.50 m² — for the heating of floor space on land — 100 m² — for the modernisation of heating and the installation of 2 vapour heating boilers, each with a cascade installation of 6,61 boilers for gas-fired condensing units. it will result in a 47.55 kW-installation of the panels with a capacity of 4.20 kW-int.; it will result in a reduced energy consumption of 60.79 % b) in ZS in Korczowa, a building in the EP indicator mills at 59.93 kWh/(m² * year), and will be reduced by 63.17 % in energy consumption (c) in the ZS in Ostrów of the indicator EP at 80.62 kWh/(m² * year), and a reduction in energy consumption needs by 55.69 %. (English)
    0 references