Modernisation and extension of the waste water treatment plant in Wydmines (Q132498)

From EU Knowledge Graph
Revision as of 17:07, 26 March 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Modernisation and extension of the waste water treatment plant in Wydmines
Project in Poland financed by DG Regio

    Statements

    0 references
    3,359,549.74 zloty
    0 references
    806,291.9376000001 Euro
    13 January 2020
    0 references
    5,311,915.48 zloty
    0 references
    1,274,859.7152 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    19 December 2016
    0 references
    26 September 2019
    0 references
    PRZEDSIĘBIORSTWO USŁUG KOMUNALNYCH I ZIELENI SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references

    53°58'54.8"N, 22°1'56.6"E
    0 references
    Przedsięwzięcie dot. modernizacji istniejącej instalacji do oczyszczania ścieków komunalnych w Wydminach. Oczyszczalnia usytuowana jest na wsch. od m.Wydminy w obrębie w.Mazuchówka na dz. nr 385, stanowiącej własność PUKiZ sp. z o.o. Obiekt został wybudowany w l. 1996 -1998. Instalacja służy do obsługi terenu Aglomeracji Wydminy PLWM060 o 2668 RLM. Głównym powodem planowanej modernizacji mechaniczno-biologicznej oczyszczalni jest wyeksploatowanie istniejących obiektów i urządzeń. Pomimo mniejszej od projektowanej pierwotnie ilości przyjmowanych ścieków, ładunki zanieczyszczeń w dopływie są większe od projektowanych. Wysokie stężenia zanieczyszczeń w dopływie, powodują okresowe trudności eksploatacyjne co skutkuje okresowymi przekroczeniami dopuszczalnej koncentracji azotu ogólnego w odpływie. Zakres rzeczowy projektu obejmuje: a)budowę: - wiaty składowania osadu odwodnionego, - budynku obsługi reaktora MBR, - kanału odcieków z wiaty, - rurociągu powietrza do reaktora MBR, - WLZ zasilania urządzeń, b)adaptację osadnika poziomego na reaktor MBR, c)modernizację technologii oczyszczania poprzez wymianę urządzeń w: - punkcie zlewnym i zbiorniku wyrównawczym ścieków dowożonych, - budynku kraty, - piaskownika wirowego, - bloku biologicznym obejmującym komory: defosfatacji, denitry?kacji, nitry?kacji, - pompowni, - stacji mechanicznego odwadniania osadu, d)remont komór: zbiornika wyrównawczego, bloku biologicznego, tacy zbiornika PIX, e)remont pomieszczeń budynku kraty, budynku stacji mechanicznego odwadnia osadu f) modernizacja instalacji elektrycznej i AKPiA. Projekt wpisuje się w założenia V osi priorytetowej, realizaując cel temat. 6 Zachowanie i ochrona środowiska przyrodniczego oraz wspieranie efektywnego gospodarowania zasobami, efektem realizacji projektu będzie ulepszenie procesu oczyszczonia ścieków co przełoży się na poprawę stanu środowiska naturalnego poprzez ograniczenie ilości zanieczyszczeń emitowanych do wód. (Polish)
    0 references
    Upgrade project for existing urban waste water treatment plant in Wydmines. The plant is located in the department from the Wipamine in the w.Mzuchówka. no 385, which is the property of PKiz sp. z o.o., has been built in 1996 to 1998. The plant is used for the operation of the PLWM060 PLWM agglomeration by 2668 p.e.. The main reason for the planned MBT plant is to exploit existing facilities and facilities. Despite the lower initial volumes of wastewater entering, the pollution loads in the effluent are higher than planned. The high concentrations of impurities in the effluent cause recurrent operational difficulties with the effect of periodic exceedances of the limit value for total nitrogen in the effluent. The scope of the project includes: construction: — storage of dehydrated sediment, — operation of the MBR reactor, — the leachate channel from the wind, — the air pipeline to the MBR reactor, — WLZ of power supply, (b) the adaptation of the horizontal settler to the MBR reactor, (c) the upgrading of the treatment technology by replacing the equipment in: — the catchment area and of the compensation reservoir for feeder waste, — the building of the taps, — gravel sandbox, — biological block comprising the enclosure: ‘desfosfatation, denitry?’, ‘Nitra’, ‘pumping station’, (d) the renovation of the chambers: equalisation reservoir, unit of biological unit, tank PIX, (e) renovation of the premises of the building of the grille, the building of the station of mechanical drainage of the sludge (f) modernisation of the electrical installation and the AKPiA. The project is in line with the objective of the V priority axis. 6 Conservation and protection of the natural environment and the promotion of resource efficiency, the project will lead to an improvement in the wastewater treatment process, which will improve the environment by reducing the amount of pollutants emitted into water. (English)
    0 references

    Identifiers

    RPWM.05.02.00-28-0020/18
    0 references