Thermal renovation of a municipal building in the village of Gwarki on plot No 79/15 (Q132286)

From EU Knowledge Graph
Revision as of 16:57, 26 March 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal renovation of a municipal building in the village of Gwarki on plot No 79/15
Project in Poland financed by DG Regio

    Statements

    0 references
    1,841,767.56 zloty
    0 references
    442,024.2144 Euro
    13 January 2020
    0 references
    2,302,209.45 zloty
    0 references
    552,530.268 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    21 June 2018
    0 references
    31 October 2020
    0 references
    GMINA PŁOŚNICA
    0 references

    53°16'28.6"N, 20°0'36.7"E
    0 references
    Projekt realizowany będzie na terenie Gminy Płośnica w miejscowości Gródki. Zakres rzeczowy proj. obejmuje termomodernizację budynku gminnego: docieplenie ścian zewn. styropianem o gr. 15cm, docieplenie ścian piwnic nad gruntem styropianem o gr. 16cm, docieplenie ścian piwnic poniżej gruntu styrop. o gr. 16cm, docieplenie podłogi na gruncie (posadzki w piwnicy) styrop. o gr 10 cm, wymianę okien zewn. na nowe z pakietem 3 szybowym. Wsp. Uw dla całego okna nie większy niż 0,85 dla okien kond. nadziemnych oraz 0,90 dla okien kondygnacji podziemnej (piwnicy), wymianę drzwi zewn. na nowe o wsp. Uw dla całego zestawu 1,3, usprawnienie systemu c.w.u. poprzez zmianę jednego centralnego systemu ogrzewania wody użytkowej na szereg lokalnych podgrzewaczy (jeden na grupę punktów poboru w jednym pomieszczeniu lub kilku sąsiadujących bezpośrednio ze sobą pomieszczeniach). Nowy system oparty na podgrzewaczach elektrycznych pojemnościowych. Zapotrzeb. na energię elektr. pokrywać ma instalacja fotowoltaiczna zamontowana na dachu budynku, montaż instalacji fotowoltaicznej o mocy 34,16 kW, zapewniającej roczną produkcję energii elektr. na poziomie 30 000 kWh rocznie. Energia ta będzie wykorzystywana dla potrzeb przygotowanie c.w.u. oraz dla potrzeb oświetlenia budynku, wymianę instalacji c.o. wraz z poprawą jej parametrów poprzez zastosowanie regulacji miejscowej (głowice termostatyczne) oraz izolację rur c.o. W ramach proj. planuje się również wykorzystanie TiK. Głównym problemem, który stał się przyczyną inwestycji jest niska efektywność energetyczna budynku. Realizacja projektu wpłynie na osiągnięcie zał. celów oraz założeń i wskaźników określonych w SzOOP RPO WiM dla Osi Priorytetowej 4. Beneficjentem projektu będą użytkownicy budynku gminnego, mieszkańcy Gminy Płośnica. Etapy realizacji projektu to: przygotowanie dokum., złożenie wniosku, realizacja prac budowlanych i promocja projektu, monitoring realizacji projektu, rozliczenie projektu, nadzór nad inwest. eksploatacja. (Polish)
    0 references
    The project will be carried out in the town of Plansnica in the town of Groyki. The material scope includes the thermal modernisation of a municipal building: insulation of the internal wall 15 cm, insulation of the basement of the cellar of the styropian area by 16 cm, the heating of the basement of the basement below the ground at 16 cm, the heating of the floor on the ground (floor area in the cellar) between Mr 10 cm and the replacement of windows with an external window of 3 cm. WSP. UW for a window of no more than 0,85 for filled windows and 0,90 for ground floor windows (‘basement’), replacement of doors. UW for the whole set of 1,3, improving the performance of the service water system by changing the single central water heating system to a number of local heaters (one per collection point group in one room or several adjacent facilities directly to each other). New system based on capacitive heaters. The electricity needed was covered by a photovoltaic installation mounted on the roof of a building, the installation of a 34.16 kW photovoltaic installation to ensure an annual generation of electricity of 30 000 kWh per year. The energy will be used to prepare for the hot water supply and for the lighting needs of the building, the replacement of the heating system and the improvement of the parameters by applying local regulations (thermostatic heads) and the insulation of the service. The main problem that has led to the investment is the poor energy efficiency of the building. The implementation of the project will contribute to the annex’s objectives and indicators set out in the ROP WiM for the Priority Axis 4. The beneficiaries of the project will be the users of the municipal building, the local inhabitants of the town of the town of South town. The phases of the implementation of the project are: preparation of the accommodation, submission of the application, construction and promotion of the project, monitoring of project implementation, project settlement, monitoring of investment. (English)
    0 references

    Identifiers

    RPWM.04.03.01-28-0042/18
    0 references