Construction of a sewage treatment plant with an energy connection in the agglomeration of Korfantów. (Q115034)

From EU Knowledge Graph
Revision as of 16:03, 26 March 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of a sewage treatment plant with an energy connection in the agglomeration of Korfantów.
Project in Poland financed by DG Regio

    Statements

    0 references
    3,659,316.85 zloty
    0 references
    878,236.044 Euro
    13 January 2020
    0 references
    8,025,832.9 zloty
    0 references
    1,926,199.896 Euro
    13 January 2020
    0 references
    57.01 percent
    0 references
    22 December 2016
    0 references
    31 January 2020
    0 references
    GMINA KORFANTÓW
    0 references
    Wnioskodawcą i bezpośrednim beneficjentem projektu jest Gmina Korfantów. W imieniu Gminy powstałą infrastrukturą zarządzał będzie Zakład Gospodarki Komunalnej i Mieszkaniowej w Korfantowie (zakład budżetowy Gminy). Gmina Korfantów posiada niezbędną do wdrożenia projektu wiedzę wynikającą z bieżącej działalności zakładu i potwierdzającą zasadność inwestycji. Dysponuje również właściwym przygotowaniem organizacyjno-technicznym i posiada niezbędne decyzje administracyjne. Oczyszczalnia ścieków położona jest w granicach administracyjnych miasta Korfantów, przy ul. Stawowej, przy drodze do Włostowa. Teren przeznaczony pod budowę znajduje się na terenie istniejącej, ogrodzonej i działającej oczyszczalni ścieków oraz działce sąsiedniej (budowa nowego zjazdu z działki drogowej i dojazd do oczyszczalni). Działki, na których znajduje się istniejąca oczyszczalnia oraz na których projektuje się budowę nowych obiektów oczyszczalni ścieków stanowią własność Gminy. Inwestycja obejmuje budowę dwóch nowych reaktorów biologicznych, nowej pompowni ścieków surowych, nowej stacji przyjmowania ścieków dowożonych wraz z dwoma nowymi zbiornikami uśredniającymi, budowę nowego budynku mechanicznego podczyszczania ścieków surowych, dwóch nowych zbiorników na osad nadmierny oraz budowę nowego budynku technicznego, w którym przewiduje się lokalizację m.in. linii do odwadniania osadów. W ramach projektu przewiduje się także budowę nowego kolektora DN300 odprowadzającego ścieki z nowych reaktorów biologicznych, który zostanie włączony do istniejącego kolektora DN300 (przewidziany do remontu w ramach projektu). W ramach zagospodarowania terenu powstaną dwa miejsca postojowe. Wdrożenie projektu wiąże się z realizacją Dyrektywy Rady nr 91/271/EWG z dnia 21.05.1991 r. oraz KPOŚK. W wyniku uwzględnienia Aglomeracji Korfantów w zapisach Master Planu, jest ona zobowiązana do wywiązania się z zawartych w nim wytycznych i nakreślonych wartości docelowych w zakresie prowadzenia gospodarki ściekowej. (Polish)
    0 references
    The applicant and the direct beneficiary of the project are the Municipality of Korfantów. On behalf of the Municipality, the facility will be managed by the Municipal Economy and Housing Company in Korfantowie (municipal authority). The municipality of Korfants has the necessary knowledge to implement the project as a result of the current operation of the plant and confirms the merits of the investment. It also has the appropriate organisational and technical background and has the necessary administrative decisions. The waste water treatment plant is situated within the administrative boundaries of the town of Korfantów, at ul. Joint, on the road to power. The site is located in an existing, fenced and operating sewage treatment plant, as well as a neighbouring plot (construction of a new road plot and access to the treatment plant). The parcels on which the existing treatment plant is located and on which the construction of the new waste water treatment plant is designed are owned by the Municipality. The investment consists of the construction of two new biological reactors, a new sewage pumping station, a new sewage collecting station with two new average tanks, the construction of a new building for the mechanical pretreatment of crude waste water, two new sludge reservoirs and the construction of a new technical building which includes the location of, inter alia, the sludge drainage line. The project also foresees the construction of a new ND300 collector discharging waste water from new biological reactors to be included in the existing DN300 collector (planned for renovation under the project). Two parking places will be created in the area of the site. The implementation of the project involves the implementation of Council Directive 91/271/EEC of 21.05.1991 and the NUWWTP. As a result of the inclusion of Korfanta’s agglomeration in the Master Plan, it is obliged to comply with the guidelines set out in the Master Plan and the waste water management targets set out therein. (English)
    0 references

    Identifiers

    RPOP.05.04.00-16-0003/16
    0 references