Reconstruction of national road No 73 to national road No 94 in the town of Tarnów — stage I (Q85947)

From EU Knowledge Graph
Revision as of 14:28, 26 March 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Reconstruction of national road No 73 to national road No 94 in the town of Tarnów — stage I
Project in Poland financed by DG Regio

    Statements

    0 references
    14,589,987.35 zloty
    0 references
    3,501,596.9639999997 Euro
    13 January 2020
    0 references
    18,759,992.48 zloty
    0 references
    4,502,398.1952 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 April 2016
    0 references
    16 December 2019
    0 references
    TARNÓW - MIASTO NA PRAWACH POWIATU
    0 references

    50°1'33.6"N, 20°57'50.8"E
    0 references
    Celem projektu jest poprawa jakości połączenia miasta z siecią dróg TEN-T poprzez zwiększenie przepustowości DK73 w km 0+590-km 1+555,99 wg kilometrażu lokalnego, obniżenie kosztów eksploatacji pojazdów i poprawę bezpieczeństwa na analizowanym odcinku. (Polish)
    0 references
    The aim of the project is to improve the quality of the city’s connection to the TEN-T road network by increasing the capacity of the DK73 in km 0 + 590 km + 1 + 555,99 per kilometre of local distance, a reduction in the costs of operating the vehicles and improving safety on the calculated section. (English)
    0 references

    Identifiers

    POIS.04.02.00-00-0008/16
    0 references