Construction of the sorted municipal waste collection point (PSZOK) in the municipality of Radom (Q85127)

From EU Knowledge Graph
Revision as of 14:11, 26 March 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of the sorted municipal waste collection point (PSZOK) in the municipality of Radom
Project in Poland financed by DG Regio

    Statements

    0 references
    2,150,340.17 zloty
    0 references
    516,081.64079999994 Euro
    13 January 2020
    0 references
    3,149,429.71 zloty
    0 references
    755,863.1303999999 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 December 2020
    0 references
    GMINA MIASTA RADOMIA
    0 references
    Projekt polega na budowie stacjonarnego Punktu Selektywnego Zbierania Odpadów Komunalnych(PSZOK).Realizowany będzie w woj.maz.,w m.Radom – płd. część,w odległości ok.3km od centr. części miasta,na dz. o nr ewid.:2/6,3/4,3/5,208/8,85/6,84,85/8,położonych przy ul.Wjazdowej(mapa lokalizacji inwestycji-zał.nr5 do WoD).Grunty są własnością Gminy Miasta Radomia(GMR). Zakres proj.obejmują zadania: 1.Prace przygot.(50700,00zł netto; 62361,00zł brutto): -studium wykonalności(SW),-wniosek o dof.(WoD), -program funkcjonalno-użytkowy(PFU)z koncepcją, 2.Dokumentacja proj.(95875,00zł netto; 117926,25zł brutto): -Projekty wraz z kompletem uzgodnień i pozwoleniem na budowę -DTR,Instrukcje Technologiczne,Instrukcje stanowiskowe,Dokumentacja i UDT,Instrukcje BPH i p.poż. -Dok. powykonawcza -Dok. do uzyskania pozwolenia na użytk. wraz z pozwoleniem 3.Roboty budowlane(2282730,00zł netto;2807757,90zł brutto): -Powierzchnia utwardzona pod pow. rampy wielofunk. -Przyłącze mediów-energia elektryczna -Przyłącze i rozprowadzenie mediów–wodociąg -Kanalizacja deszczowa -Ogrodzenie terenu -Brama wjazdowa -Sieci teletechniczne -Zagosp. terenu,roboty wykończeniowe i remontowe -Wjazd(zjazd)z drogi publicz. -Budynek biurowo-socjalny(kontener) -Kontenery i pojemniki PSZOK -Dostawa i wyposażenie ścieżki edukac. -Dostawa i montaż wagi samochodowej 18t -Dostawa i montaż wagi platformowej 300kg -Wyposażenie warsztatu 4.Nadzór budowlany(34240,95zł netto;41116,36zł brutto): -nadzór nad realizacją 5.Informacja i promocja(99966,02zł netto;119268,20zł brutto): -działania informac.-promoc. -tablica informac.i pamiątk. (Polish)
    0 references
    The project consists of the construction of a fixed unit for selective waste collection (PSZOK).The scope of the measure consists of the following tasks:1.Works. (PLN 50700,00 net;PLN 62361,00 gross):— Feasibility study (STC), -request for DOF. (vd), functional and utility program (PFU) for the concept, 2.Documentation proj. (PLN 95875,00 net;PLN 117926,25 gross):— Projects with a set of arrangements and a permit for the construction of DTR, Technical Instructions, Posts, Documentation and UDT, BPH and postharvest instructions.— approx. as-built works to obtain authorisation for an operation with a 3.Construction work permit (PLN 2282730,00 net; PLN 2807757,90 gross):— Multi-funk area paved with a multistream framework.Connection and distribution of the mains electricity connection and distribution to the water catchment -ring of the area -Brama entrance — Teletechnical networks -Zagor-networks, completion and repair work for the road.Office and social buildings (container) -Container and PSZOK — Supply and training-path equipment.— Power supply and installation of 18 t -Supply and installation of platform weight 300 kg/equipment of workshop 4.Construction surveillance (PLN 34240,95 net; PLN 41116,36 gross):Implementation of 5.Information and publicity (PLN 99966,02 net; PLN 119268,20 gross):The activities of the information and/or communication activities.— a leaflet and a souvenir. (English)
    0 references

    Identifiers

    POIS.02.02.00-00-0012/17
    0 references