Construction of PV installations based on photovoltaics, solar collectors and heat pumps in the municipalities of Ombudsmen, Cieszyn and Solec on Vistula (Q108901)

From EU Knowledge Graph
Revision as of 13:21, 26 March 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of PV installations based on photovoltaics, solar collectors and heat pumps in the municipalities of Ombudsmen, Cieszyn and Solec on Vistula
Project in Poland financed by DG Regio

    Statements

    0 references
    8,646,732.81 zloty
    0 references
    2,075,215.8744 Euro
    13 January 2020
    0 references
    10,808,416.02 zloty
    0 references
    2,594,019.8447999996 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    1 February 2019
    0 references
    31 December 2020
    0 references
    GMINA RZECZNIÓW
    0 references

    51°14'51.7"N, 21°34'28.9"E
    0 references

    51°7'36.5"N, 21°26'33.4"E
    0 references

    51°8'6.0"N, 21°45'55.4"E
    0 references
    Projekt realizowany od 06.2017 do 11.2018 wyłącznie na obszarach wiejskich - w Gminach: Rzeczniów, Ciepielów, Solec nad Wisłą i w partnerstwie tych gmin. Łączna liczba nowo-wybudowanych instalacji OZE wynosi 506 sztuk. Łączna moc zainstalowana OZE wyniesie 1,98 MW z czego: 1271,04 kW to fotowoltaika, 515,20 kW to kolektory a 196,76 kW pompy ciepła. Łączna ilość energii produkowanej z OZE wyniesie rocznie 1919,45 MWh w tym: 1207,49MWh z fotowoltaiki, 196,76 MWh z pomp ciepła i 515,2 MWh z kolektorów. Tym samym suma energii produkowanej przez kolektory i solary jako drugi i trzeci rodzaj OZE wyniesie rocznie 711,96 MWh co stanowi 37% udziału energii produkowanej w ramach projektu. W efekcie realizacji projektu nastąpi wzrost wykorzystania energii OZE w odniesieniu do całkowitej energii zużytej i/lub produkowanej w obiektach objętych projektem – energia produkowana z OZE 1919,45 MWh stanowić będzie 92% aktualnie zużywanej energii (1919,45/2085,72 MWh x 100%). W konsekwencji nastąpi redukcja CO2 o 1495,6 tony rocznie. Koszty projektu wyniosą 10.808.416,02 PLN a dofinansowanie 8.646.732,81 PLN i 2.032.707,89 EUR, co stanowi 80% wszystkich wydatków kwalifikowalnych. Projekt charakteryzuje się wysoką efektywnością kosztową - wartość dofinansowania (nakład środków UE) na (A) 1 MW mocy zainstalowanej to 1.026.620,15 EUR (B) 1MWh mocy produkowanej to 1.059,005 EUR (C) na redukcję 1 tony CO2 rocznie to 1.359,125 EUR Projekt zakłada również opracowanie i dystrybucję gazetki – broszury promocyjno-informacyjnej o projekcie w celu zwiększenia świadomości ekologicznej pozostałych mieszkańców odnośnie OZE. (Polish)
    0 references
    Project between 06.2017 and 11.2018 only in rural areas: Ombudspersons, Cietelów, Solec over Vistula and in the partnership of these municipalities. The total number of newly built RES installations is 506. The total installed RES capacity will be 1.98 MW of which: 1 271.04 kW is a photovoltaic, 515.20 kW is the collector and 196.76 kW of the heat pump. The total amount of energy produced from RES will be 1 919.45 MWh per year including: 1 207.49 MWh from photovoltaics, 196.76 MWh of heat pumps and 515.2 MWh of collectors. Thus, the amount of energy produced by collectors and solar collectors as the second and third types of RES will amount to 711.96 MWh per year, representing a 37 % share of the energy produced by the project. As a result of the project, there will be an increase in the use of RES for the total energy consumed and/or produced in the project facilities — energy produced from RES 1 919.45 MWh would represent 92 % of the current energy consumption (1919,45/2085.72 MWh x 100 %). As a result, there will be a reduction in CO2 by 1495,6 tonnes per year. The costs of the project are PLN 10.808.416,02 and the financing of PLN 8.646.732,81 and EUR 2 032 707,89, which represents 80 % of the total eligible expenditure. The project is highly cost-effective — the value of funding (EU funds) for (A) 1 MW of installed capacity is EUR 1 026 620,15 (B) 1 MWh of power generated at EUR 1 059.005 MWh (C) for a reduction of 1 tonnes of CO2 per annum to EUR 1 359,125. the project also assumes the design and distribution of the newspaper — the promotion and information brochure on the project in order to increase the environmental awareness of the other inhabitants with regard to RES. (English)
    0 references

    Identifiers

    RPMA.04.01.00-14-6952/16
    0 references