Motorway D3, construction 0309/I Bošilec — Ševetín_1 (Q72373)

From EU Knowledge Graph
Revision as of 01:18, 26 March 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Motorway D3, construction 0309/I Bošilec — Ševetín_1
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    989,244,647.37 Czech koruna
    0 references
    39,569,785.8948 Euro
    10 January 2020
    0 references
    1,662,596,046.0 Czech koruna
    0 references
    66,503,841.84 Euro
    10 January 2020
    0 references
    59.5 percent
    0 references
    24 February 2016
    0 references
    29 February 2020
    0 references
    Ředitelství silnic a dálnic ČR
    0 references

    50°2'57.91"N, 14°26'32.86"E
    0 references
    14000
    0 references
    Předmětem projektu je výstavba dálnice D3 kategorie D 27,5/120 v úseku 0309/I Bošilec - Ševětín o celkové délce 8,137 km. Realizací výstavby dálnice D3 dojde k podstatnému zlepšení plynulosti dopravy a zvýšení bezpečnosti provozu. Z hlediska životního prostředí, plynulým provozem dojde ke snížení celkových emisí z dopravy v okolí stávající komunikace. (Czech)
    0 references
    The purpose of the project is the construction of a D3 motorway of category D 27,5/120, in section 0309/I, Bošilec — Ševetín, of an overall length of 8.137 km. The construction of the D3 motorway will improve substantially the flow of traffic and increase operational security. From an environmental point of view, there will be a reduction in overall transport emissions in the area surrounding existing roads. (English)