The Children’s Group Red Kostelec (Q55722)

From EU Knowledge Graph
Revision as of 18:05, 25 March 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
The Children’s Group Red Kostelec
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    3,001,798.8 Czech koruna
    0 references
    120,071.95199999999 Euro
    10 January 2020
    0 references
    3,531,528.0 Czech koruna
    0 references
    141,261.12 Euro
    10 January 2020
    0 references
    85 percent
    0 references
    1 November 2019
    0 references
    30 June 2022
    0 references
    MĚSTO ČERVENÝ KOSTELEC
    0 references
    0 references

    50°28'24.60"N, 16°5'44.77"E
    0 references
    54941
    0 references
    Nově vybudovaná DS.Údaje k dětské skupině (DS), o jejíž podporu žádáme:- Adresa místa provozu DS: Komenského 26, Č. Kostelec (adaptované prostory sloužící původně jako bytové)- Kapacita DS: 12 dětí- Projekt bude realizován od 1.11.2019 do 30.6.2022, z toho délka projektové fáze na vybudování (vznik) DS bude probíhat od 1.11.2019 do 31.12.2019. Od 1.1.2020 do 30.6.2022 poběží projektová fáze provozu DS-Forma zařízení péče o děti z hlediska uživatelů: Dětská skupina pro veřejnost (A) (Czech)
    0 references
    Newly constructed DS.Data to the Child Group (DS), for which support is requested: — Address of the DS: Koumenská 26, No. Kostelec (adapted areas originally used as housing) — Capacity of the DS: 12 The project will be implemented from 1.11.2019 to 30.6.2022, of which the design phase for the construction (creation) of the DS will take place between 1.11.2019 and 31.12.2019. From 1.1.2020 to 30.6.2022, the project phase of the operation DS-Form of the childcare facility from the point of view of users is: Public Children’s Group (A) (English)
    0 references

    Identifiers

    CZ.03.1.51/0.0/0.0/19_111/0014745
    0 references