Project Q4416050 in Poland
Language Label Description Also known as
English
Construction of the Gródek solar power plant
Project Q4416050 in Poland

    Statements

    0 references
    1,241,487.51 zloty
    0 references
    275,982.67 Euro
    0 references
    2,040,402.29 zloty
    0 references
    453,581.43 Euro
    0 references
    60.85 percent
    0 references
    14 January 2022
    0 references
    31 July 2022
    0 references
    PIOTR SZKUTNIK
    0 references

    53°7'2.39"N, 23°33'23.90"E
    0 references
    Przedsięwzięcie pod nazwą „Budowa elektrowni słonecznej Gródek” dotyczy budowy nowej instalacji fotowoltaicznej umożliwiającej produkcję energii elektrycznej za pomocą paneli fotowoltaicznych - urządzeń dokonujących konwersji promieniowania słonecznego na prąd elektryczny. Przewiduje się realizację inwestycji o mocy nominalnej 0,83013 kWp wraz z podłączeniem do sieci dystrybucyjnej/przesyłowej zgodnie z dokumentacją techniczną. Farma fotowoltaiczna zostanie zlokalizowana na działce o nr ewd. 944 położonej w obrębie ewidencyjnym Gródek, gm. Gródek. Instalacja fotowoltaiczna składać się będzie z następujących elementów: • Moduły fotowoltaiczne zamontowane na konstrukcji wsporczej. • Naziemna i podziemna infrastruktura elektryczna. • Inwertery. • Kablowa linia energetyczna. • Przyłącze elektroenergetyczne. • Kontenerowa stacja transformatorowa SN/nn • Inne niezbędne elementy infrastruktury związane z budową i eksploatacją elektrowni fotowoltaicznej ( ogrodzenie, system monitoringu wizyjnego) Projekt wprost realizuje Cel szczegółowy: Zwiększony udział rozproszonej produkcji energii ze źródeł odnawialnych Działania 5.1 RPOWP. Realizacja projektu przyczyni się do zwiększenia udziału energii odnawialnej w produkcji energii ogółem. Efektem realizacji działań będzie redukcja emisji CO2 i poprawa stanu środowiska. Przedsięwzięcie przyczyni się do osiągnięcia wskaźnika rezultatu RPOWP : Udział energii ze źródeł odnawialnych w końcowym zużyciu energii brutto z 15,5%w 2012 do 18,6% w 2023 r. Przedsięwzięcie jest gotowe do realizacji i zostanie zrealizowane do 06.2022r. Całkowity koszt inwestycji brutto - 3 444 216,38, koszty kwalifikowalne - 2 040 402,29 zł, dofinansowanie na poziomie - 1 241 487,51 zł. (Polish)
    0 references
    The project called “Construction of the Gródek Solar Power Plant” concerns the construction of a new photovoltaic installation enabling the production of electricity by means of photovoltaic panels — devices converting solar radiation into electric current. Investments with a nominal capacity of 0.83013 kWp are envisaged, including connection to the distribution/transmission network in accordance with the technical documentation. The photovoltaic farm will be located on a plot with no. 944 located within the registered area of Gródek, Gródek. The photovoltaic installation will consist of the following elements: • Photovoltaic modules mounted on a support structure. • Ground and underground electrical infrastructure. • Inverters. • Cable power line. • Power connection. • Container transformer station SN/nn • Other necessary infrastructure elements related to the construction and operation of a photovoltaic power plant (fence, video monitoring system) The project directly implements the specific objective: Increased share of distributed renewable energy production Measure 5.1 RPOWP. The implementation of the project will increase the share of renewable energy in total energy production. The effect of the measures will be to reduce CO2 emissions and improve the state of the environment. The project will contribute to achieving the RPOWP result indicator: The share of energy from renewable sources in gross final energy consumption from 15.5 % in 2012 to 18.6 % in 2023. The project is ready to be implemented and will be realised by 06.2022. Total cost of gross investment — 3 444 216.38, eligible costs — 2 040 402.29 PLN, co-financing at the level of — PLN 1 241 487.51. (English)
    21 October 2022
    0 references
    WOJ.: PODLASKIE, POW.: białostocki
    0 references

    Identifiers

    RPPD.11.01.00-20-0008/21
    0 references