Extension, reconstruction/modernisation of sewage treatment plant in Iłza (Q85317)

From EU Knowledge Graph
Revision as of 23:11, 27 October 2022 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Jump to navigation Jump to search
Project Q85317 in Poland
Language Label Description Also known as
English
Extension, reconstruction/modernisation of sewage treatment plant in Iłza
Project Q85317 in Poland

    Statements

    0 references
    2,625,164.64 zloty
    0 references
    583,574.1 Euro
    13 January 2020
    0 references
    3,088,428.99 zloty
    0 references
    686,557.76 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 September 2015
    0 references
    30 September 2018
    0 references
    GMINA IŁŻA
    0 references
    0 references
    0 references

    51°20'8.84"N, 21°11'31.81"E
    0 references
    Projekt realizowany jest na terenie aglomeracji Iłża - 4 500 RLM. Przedmiotem Projektu jest rozbudowa / modernizacja oczyszczalni ścieków w Iłży. Planowana jest przebudowa oczyszczalni ścieków komunalnych 1 szt. Ilość suchej masy poddawana procesom przetwarzania to 0,29 tys. Mg/rok. W ramach projektu nie zostaną podłączeni żadni nowi mieszkańcy. (Polish)
    0 references
    The project is implemented in the area of the Iłża agglomeration – 4 500 RLM. The subject of the project is the extension/modernisation of the sewage treatment plant in Iłza. The reconstruction of municipal waste water treatment plants is planned 1 units. The amount of dry matter undergoing processing is 0.29 thousand. Mg/year. No new residents will be connected within the project. (English)
    14 October 2020
    0 references
    Le projet est mis en œuvre dans l’agglomération d’Iłża — 4 500 EH. Le projet a pour objet l’extension/la modernisation de la station d’épuration des eaux usées d’Iłża. Il est prévu de reconstruire la station d’épuration des eaux urbaines résiduaires 1 pcs. La quantité de matière sèche traitée est de 0,29 000. Mg/an. Aucun nouveau résident ne sera connecté au projet. (French)
    30 November 2021
    0 references
    Das Projekt wird im Ballungsraum Iłża durchgeführt – 4 500 EW. Gegenstand des Projekts ist die Erweiterung/Upgradierung der Kläranlage in Iłża. Es ist geplant, die kommunale Abwasserbehandlungsanlage umzubauen 1 Stück. Die Menge der verarbeiteten Trockenmasse beträgt 0,29 Tausend. Mg/Jahr. Keine neuen Bewohner werden mit dem Projekt verbunden sein. (German)
    7 December 2021
    0 references
    Het project wordt uitgevoerd in de agglomeratie Iłża — 4 500 i.e. Het doel van het project is de uitbreiding/verbetering van de waterzuiveringsinstallatie in Iłża. Het is de bedoeling de stedelijke afvalwaterzuiveringsinstallatie 1 st. te herbouwen. De hoeveelheid verwerkte droge stof bedraagt 0,29 duizend. Mg/jaar. Er zullen geen nieuwe bewoners verbonden zijn met het project. (Dutch)
    16 December 2021
    0 references
    Il progetto è attuato nell'agglomerato di Iłża — 4 500 a.e. L'obiettivo del progetto è l'ampliamento/miglioramento dell'impianto di trattamento delle acque reflue di Iłża. Si prevede di ricostruire l'impianto di trattamento delle acque reflue urbane 1 pz. La quantità di sostanza secca lavorata è 0,29 mila. Mg/anno. Nessun nuovo residente sarà collegato al progetto. (Italian)
    16 January 2022
    0 references
    El proyecto se ejecuta en la aglomeración de Iłża: 4 500 e-h. El objeto del proyecto es la ampliación/mejora de la planta de tratamiento de aguas residuales de Iłża. Está previsto reconstruir la planta de tratamiento de aguas residuales urbanas 1 pcs. La cantidad de materia seca procesada es de 0,29 mil. Mg/año. Ningún nuevo residente estará conectado al proyecto. (Spanish)
    19 January 2022
    0 references
    Projektet er gennemført i området af IÅża byområde â EUR 4 500 RLM. Projektets emne er udvidelse/modernisering af spildevandsrensningsanlægget i IÅza. Genopbygningen af kommunale spildevandsrensningsanlæg er planlagt 1 enheder. Den mængde tørstof, der er under forarbejdning, er 0,29 tusind. Mg/år. Ingen nye beboere vil blive forbundet med projektet. (Danish)
    26 July 2022
    0 references
    Το έργο υλοποιείται στην περιοχή του οικισμού Iża â 4 500 RLM. Αντικείμενο του έργου είναι η επέκταση/εκσυγχρονισμός της μονάδας επεξεργασίας λυμάτων στην IÅza. Η ανακατασκευή μονάδων επεξεργασίας αστικών λυμάτων έχει προγραμματιστεί για 1 μονάδα. Η ποσότητα ξηράς ουσίας που υποβάλλεται σε επεξεργασία είναι 0,29 χιλιάδες. Mg/έτος. Δεν θα συνδεθούν νέοι κάτοικοι στο πλαίσιο του έργου. (Greek)
    26 July 2022
    0 references
    Projekt se provodi na području aglomeracije IÅţa â EUR 4500 RLM. Predmet projekta je proširenje/modernizacija uređaja za pročišćavanje otpadnih voda u IÅzi. Planirana je rekonstrukcija komunalnih uređaja za pročišćavanje otpadnih voda 1 jedinica. Količina suhe tvari koja se obrađuje iznosi 0,29 tisuća. Mg/godina. Novi stanovnici neće biti povezani u okviru projekta. (Croatian)
    26 July 2022
    0 references
    Proiectul este implementat în zona aglomerării Iża â EUR 4 500 RLM. Obiectul proiectului este extinderea/modernizarea stației de epurare a apelor uzate din IÅza. Reconstrucția stațiilor municipale de tratare a apelor uzate este planificată pentru 1 unitate. Cantitatea de substanță uscată supusă prelucrării este de 0,29 mii. Mg/an. Niciun nou rezident nu va fi conectat în cadrul proiectului. (Romanian)
    26 July 2022
    0 references
    Projekt sa realizuje v oblasti aglomerácie IÅ 0,25a 4 500 RLM. Predmetom projektu je rozšírenie/modernizácia čistiarne odpadových vôd v IÅze. Rekonštrukcia komunálnych čistiarní odpadových vôd je plánovaná 1 blok. Množstvo sušiny, ktorá sa spracováva, je 0,29 tisíc. Mg/rok. V rámci projektu nebudú prepojení žiadni noví obyvatelia. (Slovak)
    26 July 2022
    0 references
    Il-proġett huwa implimentat fil-qasam tal-agglomerazzjoni IÅża EUR 4 500 RLM. Is-suġġett tal-proġett huwa l-estensjoni/modernizzazzjoni tal-impjant tat-trattament tad-drenaġġ f’IÅza. Ir-rikostruzzjoni tal-impjanti muniċipali tat-trattament tal-ilma mormi hija ppjanata 1 unità. L-ammont ta’ materja niexfa li tkun qed tiġi pproċessata huwa ta’ 0.29 elf. Mg/sena. L-ebda resident ġdid mhu se jkun konness fi ħdan il-proġett. (Maltese)
    26 July 2022
    0 references
    O projeto é executado na área da aglomeração Iża EUR 4500 RLM. O projeto tem por objeto a ampliação/modernização da estação de tratamento de águas residuais de IÅza. A reconstrução das estações municipais de tratamento de águas residuais está prevista 1 unidade. A quantidade de matéria seca em processo de transformação é de 0,29 mil. Mg/ano. Nenhum novo residente será conectado dentro do projeto. (Portuguese)
    26 July 2022
    0 references
    Hanke toteutetaan IÅża-taajamassa 4 500 RLM:n alueella. Hankkeen aiheena on IÅzan jätevedenpuhdistamon laajennus/nykyaikaistaminen. Yhdyskuntajätevesien käsittelylaitosten kunnostaminen on suunniteltu yhdeksi yksiköksi. Jalostettavan kuiva-aineen määrä on 0,29 tuhatta. Mg/vuosi. Projektiin ei liity uusia asukkaita. (Finnish)
    26 July 2022
    0 references
    Projekt se izvaja na območju aglomeracije IÅÅ⁄2a EUR 4500 RLM. Predmet projekta je razširitev/posodobitev čistilne naprave za čiščenje odplak v IÅzi. Rekonstrukcija čistilnih naprav za komunalno odpadno vodo je načrtovana 1 enota. Količina suhe snovi, ki se predeluje, je 0,29 tisoč. Mg/leto. Noben novi prebivalec ne bo povezan v okviru projekta. (Slovenian)
    26 July 2022
    0 references
    Projekt je realizován v oblasti aglomerace Iża: 4 500 RLM. Předmětem projektu je rozšíření/modernizace čistírny odpadních vod v IÅze. Rekonstrukce čistírny komunálních odpadních vod je plánována 1 ks. Množství sušiny, která prochází zpracováním, je 0,29 tisíc. Mg/rok. V rámci projektu nebudou propojeni žádní noví obyvatelé. (Czech)
    26 July 2022
    0 references
    Projektas įgyvendinamas Iża aglomeracijos rajone 4 500 RLM. Projekto objektas – Izos nuotekų valymo įrenginių išplėtimas/modernizavimas. Komunalinių nuotekų valymo įrenginių rekonstrukcija planuojama 1 blokas. Perdirbamos sausosios medžiagos kiekis yra 0,29 tūkst. Mg per metus. Projekte nebus prisijungę nauji gyventojai. (Lithuanian)
    26 July 2022
    0 references
    Projekts tiek īstenots Iża aglomerācijas teritorijā â EUR 4500 RLM. Projekta priekšmets ir notekūdeņu attīrīšanas iekārtas paplašināšana/modernizācija Ižā. Sadzīves notekūdeņu attīrīšanas iekārtu rekonstrukcija plānota 1 gab. Apstrādājamās sausnas daudzums ir 0,29 tūkstoši. Mg/gadā. Projektā netiks savienoti jauni iedzīvotāji. (Latvian)
    26 July 2022
    0 references
    Проектът се изпълнява в района на агломерацията IÅża â EUR 4500 RLM. Предметът на проекта е разширяването/модернизацията на пречиствателната станция за отпадъчни води в IÅza. Планирано е реконструкция на общински пречиствателни станции за отпадъчни води 1 блок. Количеството сухо вещество, което е в процес на преработка, е 0,29 хиляди. Mg/година. Нови жители няма да бъдат свързани в рамките на проекта. (Bulgarian)
    26 July 2022
    0 references
    A projektet az Iża agglomeráció 4500 RLM területén hajtják végre. A projekt tárgya az Åzai szennyvíztisztító telep bővítése/modernizálása. A települési szennyvíztisztító telepek felújítását 1 egységre tervezik. A feldolgozás alatt álló szárazanyag mennyisége 0,29 ezer. Mg/év. A projekten belül nem lesznek új lakosok. (Hungarian)
    26 July 2022
    0 references
    Tá an tionscadal i bhfeidhm i réimse an ceirtleán IÅža â EUR 4 500 RLM. Is é ábhar an tionscadail ná síneadh/nuachóiriú an ghléasra cóireála séarachais in IÅza. Tá atógáil na ngléasraí cóireála fuíolluisce cathrach beartaithe 1 aonad. Is é 0.29 míle méid an ábhair thirim atá á phróiseáil. Mg/bliain. Ní bheidh aon chónaitheoirí nua ceangailte laistigh den tionscadal. (Irish)
    26 July 2022
    0 references
    Projektet genomförs i området kring tätorten Iża â 4 500 EUR RLM. Ämnet för projektet är utbyggnad/modernisering av avloppsreningsverket i IÅza. Rekonstruktionen av kommunala avloppsreningsverk planeras 1 enheter. Mängden torrsubstans som bearbetas är 0,29 000. Mg/år. Inga nya invånare kommer att anslutas inom projektet. (Swedish)
    26 July 2022
    0 references
    Projekt viiakse ellu Iża linnastu piirkonnas 4500 RLM-i ulatuses. Projekti teema on IÅza reoveepuhasti laiendamine/ajakohastamine. Asulareoveepuhastite rekonstrueerimine on planeeritud 1 ühik. Töödeldava kuivaine kogus on 0,29 tuhat. Mg/aastas. Projektiga ei ühendata uusi elanikke. (Estonian)
    26 July 2022
    0 references
    WOJ.: MAZOWIECKIE, POW.: radomski
    0 references

    Identifiers

    POIS.02.03.00-00-0092/17
    0 references