Thermal modernisation of the former Synagogue in Busku -Zdrój managed by Artemis Robert Dusza (Q127609)

From EU Knowledge Graph
Revision as of 13:35, 27 October 2022 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Jump to navigation Jump to search
Project Q127609 in Poland
Language Label Description Also known as
English
Thermal modernisation of the former Synagogue in Busku -Zdrój managed by Artemis Robert Dusza
Project Q127609 in Poland

    Statements

    0 references
    263,493.66 zloty
    0 references
    58,574.64 Euro
    13 January 2020
    0 references
    405,374.89 zloty
    0 references
    90,114.84 Euro
    13 January 2020
    0 references
    65.0 percent
    0 references
    1 June 2019
    0 references
    31 December 2020
    0 references
    ROBERT DUSZA - "ARTEMIS"
    0 references
    0 references

    50°27'20.99"N, 20°47'56.36"E
    0 references
    Projekt obejmuje zadania inwestycyjne polegające na wykonaniu prac termomodernizacyjnych w Synagodze w Buzku Zdrój ( w części niewynajmowanej) modernizacja systemu CWU. Wymiana oświetlenia na LED.Instalacja elektrowni PV w okresie 06.2019 - 12.2020.Zakupione w ramach projektu środki trwałe będą nowe. Wskaźnikami są:Liczba wybudowanych jednostek wytwarzania energii cieplnej z OZE [szt.]1;Liczba wybudowanych jednostek wytwarzania energii elektrycznej z OZE [szt.]1;Liczba zmodernizowanych energetycznie budynków (szt.)1;Liczba przedsiębiorstw,które w wyniku wsparcia poprawiły efektywność energetyczną[szt.]1;Liczba przedsiębiorstw otrzymujących dotacje(CI 2)1;Liczba przedsiębiorstw otrzymujących wsparcie(CI 1)1;Powierzchnia użytkowa budynków poddanych termomodernizacji [m2]660,83;Inwestycje prywatne uzupełniające wsparcie publiczne dla przedsiębiorstw (dotacje) (CI 6) [zł].274 276,50;Zmniejszenie zużycia energii końcowej w wyniku realizacji projektów [GJ/rok]587,41;Ilość zaoszczędzonej energii cieplnej [GJ/rok]574,35;Szacowany roczny spadek emisji gazów cieplarnianych [tony równoważnika CO2] (CI 34)4,20;Ilość zaoszczędzonej energii elektrycznej [MWh/rok]1,17.Cele projektu są zgodne z celami RPOWŚ na lata 2014-2020 w ramach osi priorytetowej III Efektywna i zielona energia,w zakresie priorytetu inwestycyjnego Priorytet inwestycyjny 4.b. promowanie efektywności energetycznej i korzystania z odnawialnych źródeł energii w przedsiębiorstwach. Cele szczegółowe projektu odpowiadają priorytetowi inwestycyjnemu 4.3 i są spójne z celami głównym i szczegółowym Umowy Partnerstwa.Projekt odnosi się do następujących celów szczegółowych priorytetu III w RPO WŚ 2014- 2020:-Zwiększona efektywności energetyczna przedsiębiorstw prowadzących działalność w województwie świętokrzyskim Zgodnie z SzOOP WŚ(RPO WS)na lata 2014-2020, w zakresie EFRR projekt wpisuje się w Działanie 3.2 (Polish)
    0 references
    The project includes investment tasks consisting of carrying out thermal modernisation works in the Synagogue in Buzek Zdrój (in the non-rented part) modernising the CWU system. Replacement of lighting with LED.Installation of PV power plant in the period 06.2019-12.2020.The fixed assets purchased under the project will be new. The number of energy generation units (e.g.) (Perces of energy consumptions)1; Number of undertakings which, as a result of the support, have improved energy efficiency[pc]1;Number of enterprises receiving grants(CI 2)1;Number of enterprises receiving support(CI 1)1; The specific objectives of the project correspond to the investment priority 4.3 and are consistent with the main and specific objectives of the Partnership Agreement.The project refers to the following specific objectives of Priority III in ROP WWW 2014-2020:-Increased energy efficiency of enterprises operating in Świętokrzyskie Voivodship According to the SzOOP of WWS for 2014-2020, the ERDF project is part of Measure 3.2 (English)
    21 October 2020
    0 references
    Le projet comprend des tâches d’investissement consistant à réaliser des travaux de thermomodernisation dans la synagogue de Buzek Zdrój (dans la partie non louée) modernisation du système CWU. Remplacement de l’éclairage par LED.Installation de la centrale photovoltaïque au cours de la période 06.2019-12.2020.Acheté dans le cadre du projet sera de nouveaux atouts. Indicateurs: unités de production de chaleur SER construites [pcs]1;Nombre d’unités de production d’électricité SER construites [pcs]1;Nombre d’entreprises ayant amélioré l’efficacité énergétique[poste]1;Nombre d’entreprises bénéficiant de subventions (IC 2)1;Nombre d’entreprises bénéficiant d’un soutien (IC 1)1; surface utilisable des bâtiments soumis à rénovation thermique [m²]660, 83;Investissements privés complétant le soutien public aux entreprises (subventions) (CI 6) [PLN] 274,50;Réduction de la consommation finale d’énergie à la suite de projets [GJ/an]587,41;Quantité d’énergie thermique économisée [GJ/an]574,35;Réduction annuelle estimée des émissions de gaz à effet de serre [tonnes d’équivalent CO2] (IC 34)4, 20; quantité d’électricité économisée [MWh/an]1,17.Les objectifs du projet sont conformes aux objectifs du RPOWŚ 2014-2020 au titre de l’axe prioritaire III «Énergie efficace et verte», dans le cadre de la priorité d’investissement priorité 4.b. promouvoir l’efficacité énergétique et l’utilisation des sources d’énergie renouvelables dans les entreprises. Les objectifs spécifiques du projet correspondent à la priorité d’investissement 4.3 et sont cohérents avec les objectifs principaux et spécifiques de l’accord de partenariat. Le projet concerne les objectifs spécifiques suivants de la priorité III dans le ROP WŚ 2014-2020: — Amélioration de l’efficacité énergétique des entreprises opérant dans la voïvodie de Świętokrzyskie. (French)
    2 December 2021
    0 references
    Das Projekt umfasst Investitionsaufgaben, die in der Durchführung von Thermomodernisierungsarbeiten in der Synagoge in Buzek Zdrój (teilweise nicht vermietet) der Modernisierung des CWU-Systems bestehen. Ersatz der Beleuchtung durch LED.Installation des PV-Kraftwerks im Zeitraum 06.2019-12.2020.Im Rahmen des Projektes werden neue Anlagen erworben. Indikatoren: EE-Wärmeerzeugungseinheiten, konstruiert [pcs]1;Anzahl der EE-Stromerzeugungseinheiten, die [pcs]1 gebaut wurden;Anzahl der energiemodifizierten Gebäude (Stück)1;Anzahl der Unternehmen, die durch die Förderung die Energieeffizienz verbessert haben[item]1;Anzahl der Unternehmen, die Zuschüsse erhalten(CI 2)1;Anzahl der Unternehmen, die Unterstützung erhalten(CI 1)1; Nutzfläche von Gebäuden, die einer thermischen Renovierung unterzogen werden [m²]660,83;Private Investitionen zur Ergänzung der öffentlichen Unterstützung von Unternehmen (Finanzhilfen) (CI 6) [PLN].274 276,50;Verringerung des Endenergieverbrauchs infolge von Projekten [GJ/Jahr]587,41;Anzahl der eingesparten Wärmeenergie [GJ/Jahr]574,35;Schätzte jährliche Verringerung der Treibhausgasemissionen [Tonnen CO2-Äquivalent] (CI 34)4, 20;Quantität des eingesparten Stroms [MWh/Jahr]1,17.Die Ziele des Projekts entsprechen den Zielen des RPOWŚ 2014-2020 im Rahmen der Prioritätsachse III Effektive und grüne Energie im Rahmen der Investitionspriorität Investitionspriorität 4.b. Förderung der Energieeffizienz und Nutzung erneuerbarer Energiequellen in Unternehmen. Die spezifischen Ziele des Projekts entsprechen der Investitionspriorität 4.3 und stehen im Einklang mit den wichtigsten und spezifischen Zielen der Partnerschaftsvereinbarung. Das Projekt bezieht sich auf die folgenden spezifischen Ziele der Priorität III im ROP WŚ 2014-2020: Verbesserung der Energieeffizienz von Unternehmen, die in der Woiwodschaft Świętokrzyskie tätig sind. (German)
    8 December 2021
    0 references
    Het project omvat investeringstaken die bestaan in de uitvoering van thermomoderniseringswerken in de Synagoge in Buzek Zdrój (in het gedeelte niet gehuurd) modernisering van het CWU-systeem. Vervanging van verlichting door LED.Installatie van PV-centrale in de periode 06.2019-12.2020.Aangeboden als onderdeel van het project zal nieuwe activa zijn. Indicatoren: RES-warmteopwekkingseenheden gebouwd [pcs]1;Aantal installaties voor de opwekking van elektriciteit uit hernieuwbare bronnen gebouwd [pcs]1;Aantal energiegemodificeerde gebouwen (st.)1;Aantal ondernemingen dat als gevolg van de steun de energie-efficiëntie heeft verbeterd[item]1;Aantal ondernemingen die subsidies ontvangen(CI 2)1;Aantal ondernemingen die steun ontvangen(CI 1)1; bruikbare oppervlakte van gebouwen die onderworpen zijn aan thermische renovatie [m²]660, 83;Private-investeringen ter aanvulling van overheidssteun aan ondernemingen (subsidies) (CI 6) [PLN].274 276,50;Vermindering van het eindenergieverbruik als gevolg van projecten [GJ/jaar]587,41;Kwantiteit van de bespaarde thermische energie [GJ/jaar]574,35;Geraamde jaarlijkse vermindering van de broeikasgasemissies [ton CO2-equivalent] (CI 34)4,4 20;Kwantiteit van de bespaarde elektriciteit [MWh/jaar]1,17.De doelstellingen van het project zijn in overeenstemming met de doelstellingen van de RPOWŚ 2014-2020 in het kader van prioritaire as III Effectieve en groene energie, binnen het toepassingsgebied van investeringsprioriteit 4b. bevordering van energie-efficiëntie en het gebruik van hernieuwbare energiebronnen in ondernemingen. De specifieke doelstellingen van het project komen overeen met investeringsprioriteit 4.3 en zijn in overeenstemming met de belangrijkste en specifieke doelstellingen van de partnerschapsovereenkomst. Het project heeft betrekking op de volgende specifieke doelstellingen van prioriteit III in het ROP WŚ 2014-2020:-Verbeterde energie-efficiëntie van ondernemingen die actief zijn in het woiwodschap Świętokrzyskie. (Dutch)
    17 December 2021
    0 references
    Il progetto comprende compiti di investimento consistenti nell'esecuzione di lavori di termomodernizzazione nella Sinagoga di Buzek Zdrój (nella parte non affittata) ammodernamento del sistema CWU. Sostituzione dell'illuminazione con LED.Installazione della centrale fotovoltaica nel periodo 06.2019-12.2020.Prescelto come parte del progetto saranno nuovi asset. Indicatori: unità di generazione di calore da fonti rinnovabili costruite [pcs]1;Numero di unità di produzione di energia elettrica da fonti rinnovabili costruite [pcs]1;Numero di edifici modificati dall'energia (pcs.)1;Numero di imprese che, grazie al sostegno, hanno migliorato l'efficienza energetica[voce]1;Numero di imprese che ricevono sovvenzioni(CI 2)1;Numero di imprese che ricevono sostegno(CI 1)1; superficie utilizzabile di edifici soggetti a ristrutturazione termica [m²]660, 83;Investimenti privati che integrano il sostegno pubblico alle imprese (sovvenzioni) (CI 6) [PLN].274 276,50;Riduzione del consumo finale di energia a seguito dei progetti [GJ/anno]587,41;Quantità di energia termica risparmiata [GJ/anno]574,35;Riduzione annua stimata delle emissioni di gas a effetto serra [tonnellate di CO2 equivalente] (CI 34)4, 20; quantità di energia elettrica risparmiata [MWh/anno]1,17.Gli obiettivi del progetto sono in linea con gli obiettivi della RPOWŚ 2014-2020 nell'ambito dell'asse prioritario III Energia efficace e verde, nell'ambito della priorità d'investimento prioritaria 4.b. promuovere l'efficienza energetica e l'uso di fonti energetiche rinnovabili nelle imprese. Gli obiettivi specifici del progetto corrispondono alla priorità di investimento 4.3 e sono coerenti con gli obiettivi principali e specifici dell'accordo di partenariato. Il progetto si riferisce ai seguenti obiettivi specifici della priorità III del POR WŚ 2014-2020: — Miglioramento dell'efficienza energetica delle imprese che operano nel voivodato di Świętokrzyskie. (Italian)
    15 January 2022
    0 references
    El proyecto incluye tareas de inversión consistentes en la ejecución de obras de termomodernización en la Sinagoga de Buzek Zdrój (en la parte no alquilada) modernización del sistema CWU. Sustitución de la iluminación por led.La instalación de la central fotovoltaica en el período 06.2019-12.2020. Adquirida como parte del proyecto serán nuevos activos. Indicadores: unidades de generación de calor de FER construidas [pcs]1;Número de unidades de generación de electricidad FER construidas [pcs]1;Número de edificios modificados con energía (pcs)1;Número de empresas que, como resultado de la ayuda, han mejorado la eficiencia energética[partida]1;Número de empresas que reciben subvenciones (IC 2)1; Número de empresas que reciben apoyo(IC 1)1; Área utilizable de edificios sujetos a renovación térmica [m²]660, 83;Inversión privada que complementa el apoyo público a las empresas (subvenciones) (IC 6) [PLN].274 276,50;Reducción del consumo final de energía como resultado de proyectos [GJ/año]587,41;Cantidad de energía térmica ahorrada [GJ/año]574,35;Reducción anual estimada de las emisiones de gases de efecto invernadero [toneladas equivalentes de CO2] (IC 34)4, 20; cantidad de electricidad ahorrada [MWh/año]1,17.Los objetivos del proyecto están en consonancia con los objetivos del RPOWŚ 2014-2020 en el marco del eje prioritario III Energía eficaz y verde, dentro del ámbito de la prioridad de inversión Prioridad de inversión 4.b. fomento de la eficiencia energética y el uso de fuentes de energía renovables en las empresas. Los objetivos específicos del proyecto corresponden a la prioridad de inversión 4.3 y son coherentes con los objetivos principales y específicos del Acuerdo de Asociación. El proyecto se refiere a los siguientes objetivos específicos de la Prioridad III en el ROP WŚ 2014-2020: — Mejora de la eficiencia energética de las empresas que operan en el Voivodato de Świętokrzyskie. (Spanish)
    18 January 2022
    0 references
    Projekt hõlmab investeerimisülesandeid, mis seisnevad termilise moderniseerimise teostamises Buzek Zdr³j sünagoogis (rentimata osas), ajakohastades CWU süsteemi. Valgustuse asendamine LED-ga.Puuduelektrijaama paigaldamine ajavahemikul 06.2019–12.2020.Projekti raames ostetud põhivarad on uued. Energiatootmisüksuste arv (nt) (energiatarbimine)1; Nende ettevõtjate arv, kes on toetuse tulemusel energiatõhusust parandanud[tk]1;toetust saavate ettevõtete arv(CI 2)1;toetust saavate ettevõtete arv(CI 1)1; Projekti erieesmärgid vastavad investeerimisprioriteedile 4.3 ning on kooskõlas partnerluslepingu põhi- ja erieesmärkidega. Projekt viitab 2014.–2020. aasta piirkondliku rakenduskava III prioriteedi järgmistele konkreetsetele eesmärkidele:- ÅwiÄtokrzyskie vojevoodkonnas tegutsevate ettevõtete energiatõhususe suurendamine. Vastavalt WWSi 2014.–2020. aasta tegevuskavale on ERFi projekt osa meetmest 3.2. (Estonian)
    27 July 2022
    0 references
    Projektas apima investicines užduotis, kurias sudaro šilumos modernizavimo darbai Sinagogoje Buzek Zdrój (nenuomojamoje dalyje), modernizuojant CWU sistemą. Apšvietimo pakeitimas LED.PV jėgainės įrengimas laikotarpiu 06.2019–12.2020. Pagal projektą įsigytas ilgalaikis turtas bus naujas. Energijos gamybos vienetų skaičius (pvz.) (energijos sąnaudų kiekis)1; Įmonių, kurios dėl paramos pagerino energijos vartojimo efektyvumą[pc]1, skaičius;Dotacijas gaunančių įmonių skaičius(CI 2)1; paramą gaunančių įmonių skaičius(CI 1)1; Konkretūs projekto tikslai atitinka investicinį prioritetą 4.3 ir atitinka pagrindinius ir konkrečius partnerystės sutarties tikslus. Projektas susijęs su šiais konkrečiais ROP WWW 2014–2020 m. III prioriteto tikslais: – Padidėjęs Šiaulių vaivadijoje veikiančių įmonių energijos vartojimo efektyvumas Pagal WWS SzOOP 2014–2020 metams, ERPF projektas yra 3.2 priemonės dalis. (Lithuanian)
    27 July 2022
    0 references
    Projekt uključuje investicijske poslove koji se sastoje od provođenja radova termičke modernizacije u Sinagogi u Buzeku Zdró³ju (u nenaručenom dijelu) modernizaciji sustava CWU. Zamjena rasvjete LED.Instalacija fotonaponske elektrane u razdoblju 06.2019 – 12.2020. Dugotrajna sredstva kupljena u okviru projekta bit će nova. Broj jedinica za proizvodnju energije (npr.) (Percesi potrošnje energije)1; Broj poduzeća koja su kao rezultat potpore poboljšala energetsku učinkovitost[pc]1;Broj poduzeća koja primaju bespovratna sredstva(CI 2)1;Broj poduzeća koja primaju potporu(CI 1)1; Specifični ciljevi projekta odgovaraju investicijskom prioritetu 4.3 i u skladu su s glavnim i specifičnim ciljevima Sporazuma o partnerstvu. Projekt se odnosi na sljedeće specifične ciljeve Prioriteta III u ROP WWW 2014 – 2020:-Povećana energetska učinkovitost poduzeća koja posluju u ÅwiÄtokrzyskie Voivodship Prema SzOOP WWS za razdoblje 2014. – 2020., projekt EFRR je dio mjere 3.2. (Croatian)
    27 July 2022
    0 references
    Το έργο περιλαμβάνει επενδυτικά καθήκοντα που συνίστανται στην εκτέλεση εργασιών θερμικού εκσυγχρονισμού στη Συναγωγή στο Buzek Zdrój (στο μη ενοικιασμένο τμήμα) για τον εκσυγχρονισμό του συστήματος CWU. Αντικατάσταση φωτισμού με LED.Εγκατάσταση φωτοβολταϊκού σταθμού κατά την περίοδο 06.2019-12.2020.Τα πάγια περιουσιακά στοιχεία που αγοράστηκαν στο πλαίσιο του έργου θα είναι νέα. Τον αριθμό των μονάδων παραγωγής ενέργειας (π.χ.) (Τα είδη κατανάλωσης ενέργειας)1· Αριθμός επιχειρήσεων οι οποίες, ως αποτέλεσμα της στήριξης, βελτίωσαν την ενεργειακή απόδοση[pc]1·Αριθμός επιχειρήσεων που λαμβάνουν επιχορηγήσεις(CI 2)1·Αριθμός επιχειρήσεων που λαμβάνουν στήριξη(CI 1)1· Οι ειδικοί στόχοι του έργου αντιστοιχούν στην επενδυτική προτεραιότητα 4.3 και συνάδουν με τους κύριους και ειδικούς στόχους της συμφωνίας εταιρικής σχέσης.Το έργο αναφέρεται στους ακόλουθους ειδικούς στόχους της προτεραιότητας III στο ΠΕΠ WWW 2014-2020:-Αυξημένη ενεργειακή απόδοση των επιχειρήσεων που δραστηριοποιούνται στο βοεβοδάτο ÅwiÄtokrzyskie Σύμφωνα με το SzOOP του WWS για την περίοδο 2014-2020, το έργο ΕΤΠΑ αποτελεί μέρος του Μέτρου 3.2 (Greek)
    27 July 2022
    0 references
    Projekt zahŕňa investičné úlohy spočívajúce v realizácii tepelnej modernizácie v synagóge v Buzeku Zdrój (v neprenajatej časti) modernizácie systému CWU. Výmena osvetlenia LED.Inštalácia fotovoltickej elektrárne v období 06.2019 – 12.2020.Bezplatné aktíva zakúpené v rámci projektu budú nové. Počet jednotiek na výrobu energie (napr.) (Perces of energy consumptions)1; Počet podnikov, ktoré v dôsledku podpory zlepšili energetickú účinnosť[pc]1;Počet podnikov prijímajúcich granty (CI 2)1;Počet podnikov prijímajúcich podporu (CI 1)1; Špecifické ciele projektu zodpovedajú investičnej priorite 4.3 a sú v súlade s hlavnými a konkrétnymi cieľmi partnerskej dohody. Projekt sa vzťahuje na tieto konkrétne ciele priority III v ROP WW 2014 – 2020:-Zvýšená energetická efektívnosť podnikov pôsobiacich v ÅwiÄtokrzyskie vojvodstve Podľa SzOOP WWS na roky 2014 – 2020, projekt EFRR je súčasťou opatrenia 3.2. (Slovak)
    27 July 2022
    0 references
    Hankkeeseen sisältyy investointitehtäviä, jotka koostuvat lämpövoimaloiden nykyaikaistamisesta Buzek Zdrój:n synagogassa (ei-vuokratussa osassa), jolla nykyaikaistetaan CWU-järjestelmää. Valaistuksen korvaaminen LED-valolla. PV-voimalaitoksen asentaminen ajanjaksolla 06.2019–12.2020. Hankkeen yhteydessä ostettava käyttöomaisuus tulee olemaan uutta. Energiantuotantoyksiköiden lukumäärä (esim.) (energiankulutuksen osuudet)1; Niiden yritysten lukumäärä, jotka ovat tuen ansiosta parantaneet energiatehokkuutta[pc]1;avustuksia saavien yritysten lukumäärä(CI 2)1;tukea saavien yritysten lukumäärä(CI 1)1; Hankkeen erityistavoitteet vastaavat investointiprioriteettia 4.3 ja ovat kumppanuussopimuksen pää- ja erityistavoitteiden mukaisia. Hankkeessa viitataan seuraaviin erityistavoitteisiin, jotka sisältyvät WWWWW:n 2014–2020 painopisteeseen III: – ÅwiÄtokrzyskie Voivodship -alueella toimivien yritysten energiatehokkuuden lisääminen WWS:n vuosina 2014–2020 laatiman SzOOP:n mukaan EAKR-hanke on osa toimenpidettä 3.2. (Finnish)
    27 July 2022
    0 references
    A projekt olyan beruházási feladatokat foglal magában, amelyek a Buzek Zdró³j zsinagógában a CWU rendszer korszerűsítését célzó termálkorszerűsítési munkálatok elvégzésére irányulnak. A világítás cseréje LED-del.A fotovillamos erőmű beépítése a 06.2019–12.2020 közötti időszakban.A projekt keretében vásárolt állóeszközök újak lesznek. Az energiatermelő egységek száma (pl.) (Energiafogyasztás mértéke)1; Azon vállalkozások száma, amelyek a támogatás eredményeként javították az energiahatékonyságot[pc]1;a vissza nem térítendő támogatásban részesülő vállalkozások száma(CI 2)1;A támogatásban részesülő vállalkozások száma(CI 1)1; A projekt konkrét célkitűzései megfelelnek a 4.3. beruházási prioritásnak, és összhangban vannak a partnerségi megállapodás fő és konkrét célkitűzéseivel.A projekt a 2014–2020-as időszakra vonatkozó ROP III. prioritásának alábbi konkrét célkitűzéseire utal:-Az ÅwiÄtokrzyskie vajdaságban működő vállalkozások energiahatékonyságának növelése A WWS 2014–2020-as SzOOP-ja szerint az ERFA projekt a 3.2. intézkedés részét képezi. (Hungarian)
    27 July 2022
    0 references
    Součástí projektu jsou investiční úkoly spočívající v provádění tepelných modernizačních prací v Synagoze v Buzek Zdrój (v nepronajímané části) modernizace systému CWU. Výměna osvětlení za LED.Instalace fotovoltaické elektrárny v období 06.2019–12.2020.Trvalý majetek zakoupený v rámci projektu bude nový. Počet jednotek výroby energie (např.) (možnost spotřeby energie)1; Počet podniků, které v důsledku podpory zlepšily energetickou účinnost[pc]1; počet podniků, které dostávají granty(CI 2)1; počet podniků, které dostávají podporu(CI 1)1; Specifické cíle projektu odpovídají investiční prioritě 4.3 a jsou v souladu s hlavními a specifickými cíli dohody o partnerství. Projekt odkazuje na následující specifické cíle priority III v ROP WWW 2014–2020:-Zvýšená energetická účinnost podniků působících v ÅwiÄtokrzyskie Voivodship Podle SzOOP WWS na období 2014–2020 je projekt EFRR součástí opatření 3.2 (Czech)
    27 July 2022
    0 references
    Projekts ietver ieguldījumu uzdevumus, kas ietver siltummodernizācijas darbu veikšanu sinagogā Buzek Zdrój (nenomātajā daļā) CWU sistēmas modernizēšanai. Nomaiņa apgaismojums ar LED.Instalācija PV spēkstacijas periodā 06.2019–12.2020.Pamatlīdzekļi, kas iegādāti saskaņā ar projektu būs jauns. Enerģijas ražošanas vienību skaits (piem.,) (enerģijas patēriņa cenas)1; To uzņēmumu skaits, kuri atbalsta rezultātā ir uzlabojuši energoefektivitāti[pc]1;dotācijas saņemošo uzņēmumu skaits(CI 2)1;atbalstu saņēmušo uzņēmumu skaits(CI 1)1; Projekta konkrētie mērķi atbilst 4.3. investīciju prioritātei un atbilst partnerības nolīguma galvenajiem un konkrētajiem mērķiem.Projekts attiecas uz šādiem konkrētiem III prioritātes mērķiem ROP WWW 2014–2020:-Palielināta energoefektivitāte uzņēmumiem, kas darbojas Åwiokrzyskie vojevodistē. Saskaņā ar WWS SzOOP 2014.-2020. gadam ERAF projekts ir daļa no 3.2. pasākuma. (Latvian)
    27 July 2022
    0 references
    Áirítear leis an tionscadal tascanna infheistíochta arb é atá iontu oibreacha nuachóirithe teirmeach a dhéanamh sa tsionagóg i Buzek Zdrój (sa chuid nach bhfuil ar cíos) córas CWU a nuachóiriú. Soilsiú a athsholáthar le LED.Suiteáil gléasra cumhachta PV sa tréimhse 06.2019-12.2020.Beidh na sócmhainní seasta a ceannaíodh faoin tionscadal nua. Líon na n-aonad giniúna fuinnimh (e.g.) (Perces of energy consumptions)1; Líon na ngnóthas a bhfuil feabhas curtha acu, mar thoradh ar an tacaíocht, ar éifeachtúlacht fuinnimh[pc]1;Líon na bhfiontar a fhaigheann deontais (CI 2)1;Líon na bhfiontar a fhaigheann tacaíocht (CI 1)1; Freagraíonn cuspóirí sonracha an tionscadail do thosaíocht infheistíochta 4.3 agus tá siad comhsheasmhach le príomhchuspóirí agus cuspóirí sonracha an Chomhaontaithe Comhpháirtíochta.Tagraíonn an tionscadal do chuspóirí sonracha Tosaíocht III in WWW ROP 2014-2020:-Éifeachtúlacht fuinnimh mhéadaithe na bhfiontar a oibríonn in ÅwiÄtokrzyskie Voivodship De réir SzOOP WWS do 2014-2020, tá tionscadal CFRE mar chuid de Bheart 3.2 (Irish)
    27 July 2022
    0 references
    Projekt vključuje investicijske naloge, ki obsegajo izvedbo toplotnih posodobitev v Sinagogi v Buzeku Zdróju (v nenajetem delu) za posodobitev sistema CWU. Zamenjava razsvetljave z LED.Vgradnja fotonapetostne elektrarne v obdobju 06.2019–12.2020.Stalna sredstva, kupljena v okviru projekta, bodo nova. Število enot za proizvodnjo energije (npr.) (mesta porabe energije)1; Število podjetij, ki so zaradi podpore izboljšala energetsko učinkovitost[pc]1;Število podjetij, ki prejemajo nepovratna sredstva (CI 2)1;Število podjetij, ki prejemajo podporo(CI 1)1; Posebni cilji projekta ustrezajo prednostni naložbi 4.3 in so skladni z glavnimi in specifičnimi cilji partnerskega sporazuma. Projekt se nanaša na naslednje specifične cilje III. prednostne naloge v obdobju 2014–2020: – Povečana energetska učinkovitost podjetij, ki delujejo v ÅwiÄtokrzyskie Voivodshipu, v skladu s SzOOP WWS za obdobje 2014–2020, je projekt ESRR del ukrepa 3.2. (Slovenian)
    27 July 2022
    0 references
    Проектът включва инвестиционни задачи, състоящи се в извършване на дейности за модернизация на топлинната енергия в синагогата в Buzek Zdrój (в частта, която не е наета под наем), като се модернизира системата на CWU. Подмяна на осветлението с LED.Инсталация на фотоволтаична централа в периода 06.2019—12.2020.Държавите активи, закупени по проекта, ще бъдат нови. Броя на единиците за производство на енергия (напр.) (брой на енергопотреблението)1; Брой предприятия, които в резултат на подкрепата са подобрили енергийната ефективност[pc]1;Брой предприятия, получаващи безвъзмездни средства (CI 2)1;Брой предприятия, получаващи подкрепа(CI 1)1; Конкретните цели на проекта съответстват на инвестиционен приоритет 4.3 и са в съответствие с основните и специфичните цели на споразумението за партньорство.Проектът се отнася до следните конкретни цели на приоритет III в РОП WWW 2014—2020: — Повишена енергийна ефективност на предприятията, извършващи дейност във ÅwiÄtokrzyskie Voivodship Съгласно SzOOP на WWS за 2014—2020 г. проектът по ЕФРР е част от мярка 3.2 (Bulgarian)
    27 July 2022
    0 references
    Il-proġett jinkludi kompiti ta’ investiment li jikkonsistu fit-twettiq ta’ xogħlijiet ta’ modernizzazzjoni termali fis-Synagogue f’Buzek Zdrój (fil-parti mhux mikrija) li timmodernizza s-sistema CWU. Is-sostituzzjoni tat-tidwil bil-LED.Installazzjoni ta’ impjant tal-enerġija PV fil-perjodu bejn is-06.2019–12.2020.L-assi fissi mixtrija taħt il-proġett se jkunu ġodda. L-għadd ta’ unitajiet ta’ ġenerazzjoni tal-enerġija (eż.) (Ir-rendiment tal-konsum tal-enerġija)1; Numru ta’ impriżi li, bħala riżultat tal-appoġġ, tejbu l-effiċjenza enerġetika[pc]1;Għadd ta’ intrapriżi li jirċievu għotjiet(CI 2)1;Għadd ta’ intrapriżi li jirċievu appoġġ(CI 1)1; L-objettivi speċifiċi tal-proġett jikkorrispondu għall-prijorità ta’ investiment 4.3 u huma konsistenti mal-objettivi ewlenin u speċifiċi tal-Ftehim ta’ Sħubija. Il-proġett jirreferi għall-objettivi speċifiċi li ġejjin tal-Prijorità III fir-ROP WWW 2014–2020: — Żieda fl-effiċjenza enerġetika tal-intrapriżi li joperaw f’ÅwiÄtokrzyskie Voivodship Skont l-SzOOP ta’ WWS għall-2014–2020, il-proġett tal-FEŻR huwa parti mill-Miżura 3.2 (Maltese)
    27 July 2022
    0 references
    O projeto inclui tarefas de investimento que consistem na realização de obras de modernização térmica na Sinagoga em Buzek Zdrój (na parte não alugada) modernizando o sistema CWU. Substituição da iluminação com LED.Instalação da central fotovoltaica no período 06.2019 — 12.2020.Os ativos fixos adquiridos no âmbito do projeto serão novos. O número de unidades de produção de energia (por exemplo) (Perzes de consumo de energia)1; Número de empresas que, em resultado do apoio, melhoraram a eficiência energética[pc]1;Número de empresas que beneficiam de subvenções(IC 2)1;Número de empresas que beneficiam de apoio(IC 1)1; Os objetivos específicos do projeto correspondem à prioridade de investimento 4.3 e são coerentes com os objetivos principais e específicos do Acordo de Parceria. O projeto refere-se aos seguintes objetivos específicos da Prioridade III do ROP WWW 2014-2020:-Aumento da eficiência energética das empresas que operam na voivodia de ÅwiÄtokrzyskie De acordo com o SzOOP da WWS para 2014-2020, o projeto do FEDER faz parte da Medida 3.2 (Portuguese)
    27 July 2022
    0 references
    Projektet omfatter investeringsopgaver, der består i at gennemføre termiske moderniseringsarbejder i synagogen i Buzek Zdrój (i den ikke-lejede del) modernisering af CWU-systemet. Udskiftning af belysning med LED.Installation af solcelleanlæg i perioden 06.2019-12.2020.De anlægsaktiver, der købes under projektet, vil være nye. Antallet af energiproduktionsenheder (f.eks.) (forbrugsperioder)1 Antal virksomheder, der som følge af støtten har forbedret energieffektiviteten[pc]1Antal virksomheder, der modtager tilskud(CI 2)1Antal virksomheder, der modtager støtte(CI 1)1 Projektets specifikke mål svarer til investeringsprioritet 4.3 og er i overensstemmelse med de vigtigste og specifikke mål i partnerskabsaftalen. Projektet henviser til følgende specifikke mål i prioritet III i ROP WWW 2014-2020:-Øget energieffektivitet for virksomheder, der opererer i ÅwiÄtokrzyskie Voivodship Ifølge SzOOP for WWS for 2014-2020 er EFRU-projektet en del af foranstaltning 3.2. (Danish)
    27 July 2022
    0 references
    Proiectul include sarcini de investiții constând în realizarea de lucrări de modernizare termică în Sinagoga din Buzek Zdrój (în partea neînchiriată) modernizarea sistemului CWU. Înlocuirea iluminatului cu LED-uri.Instalarea centralei electrice fotovoltaice în perioada 06.2019-12.2020. Activele fixe achiziționate în cadrul proiectului vor fi noi. Numărul de unități generatoare de energie (de exemplu) (Persoane de consum de energie)1; Numărul de întreprinderi care, ca urmare a sprijinului, au îmbunătățit eficiența energetică [pc]1;Numărul de întreprinderi care primesc granturi(CI 2)1;Numărul de întreprinderi care primesc sprijin(CI 1)1; Obiectivele specifice ale proiectului corespund priorității de investiții 4.3 și sunt în concordanță cu obiectivele principale și specifice ale Acordului de parteneriat. Proiectul se referă la următoarele obiective specifice ale priorității III în ROP WWW 2014-2020: – Creșterea eficienței energetice a întreprinderilor care își desfășoară activitatea în Voievodatul ÅwiÄtokrzyskie Potrivit SzOOP al WWS pentru perioada 2014-2020, proiectul FEDR face parte din Măsura 3.2 (Romanian)
    27 July 2022
    0 references
    Projektet omfattar investeringsuppgifter som består i att genomföra värmemoderniseringsarbeten i synagogan i Buzek Zdrój (i den icke-hyrda delen) som moderniserar CWU-systemet. Byte av belysning mot LED.Installation av solcellskraftverk under perioden 06.2019–12.2020.De fasta tillgångar som köps inom ramen för projektet kommer att vara nya. Antalet energiproduktionsenheter (t.ex.) (energiförbrukningens gång)1. Antal företag som till följd av stödet har förbättrat energieffektiviteten[pc]1.Antal företag som får bidrag(CI 2)1.Antal företag som får stöd(CI 1)1. Projektets särskilda mål motsvarar investeringsprioriteringen 4.3 och är förenliga med partnerskapsöverenskommelsens viktigaste och specifika mål. Projektet avser följande särskilda mål för prioritering III i ROP WWW 2014–2020:-Ökad energieffektivitet hos företag som är verksamma i vojvodskapet ÅwiÄtokrzyskie Enligt SzOOP för WWS för 2014–2020 är Eruf-projektet en del av åtgärd 3.2. (Swedish)
    27 July 2022
    0 references
    WOJ.: ŚWIĘTOKRZYSKIE, POW.: buski
    0 references

    Identifiers

    RPSW.03.02.00-26-0080/18