Implementation of a new horizontal controlled drilling service to the company’s offer (Q4418508)

From EU Knowledge Graph
Revision as of 14:34, 26 October 2022 by DG Regio (talk | contribs) (‎Changed an Item: Import item from Poland)
Jump to navigation Jump to search
Project Q4418508 in Poland
Language Label Description Also known as
English
Implementation of a new horizontal controlled drilling service to the company’s offer
Project Q4418508 in Poland

    Statements

    0 references
    765,000.0 zloty
    0 references
    170,059.5 Euro
    0 references
    900,000.0 zloty
    0 references
    200,070.0 Euro
    0 references
    85.0 percent
    0 references
    14 July 2020
    0 references
    31 May 2021
    0 references
    ZAKŁAD USŁUG SPRZĘTOWO-TRANSPORTOWYCH S.C. A. BATOR, M. BATOR
    0 references

    51°13'57.72"N, 18°34'54.48"E
    0 references
    Projekt jest odpowiedzią na zidentyfikowane problemy i potrzeby Zakładu Usług Sprzętowo – Transportowych ZUST jak i jego klientów. Poprzedzony jest wnikliwą analizą branży oraz sytuacją gospodarczą spółki w wyniku pandemii COVID-19. Celem projektu jest przeciwdziałanie negatywnym skutkom wszechobecnie panującej od kilku miesięcy epidemii COVID-19 poprzez rozszerzenie oferty usługowej spółki ZUST o innowacyjną usługę bezwykopowych przewiertów horyzontalnych opartych na nowoczesnej technologii za pomocą specjalistycznej wiertnicy horyzontalnej (dedykowanej do prze-wiertów sterowanych). Projekt jest innowacyjny w skali przedsiębiorstwa, spółka nie posiada sprzętu, który jest przedmiotem inwestycjiMaszyna przewiertowa umożliwi bezinwazyj-ny montaż rurociągów (kanalizacyjnych, wodociągowych, tłocznych, telekomunikacyjnych) nawet powyżej 100 mb w jednym odcinku umożliwiając ominięcie przeszkód, kolizji, infrastruktury podziemnej i nadziemnej. Taka metoda wykonania inwestycji zwiększy konkurencyjność, wydajność a przede wszystkim obniży koszty wykonywania robót budowla-nych, umożliwi również pozyskanie nowych klientów. W zakresie inwestycyjnym projekt obejmie zakupu specjalistycznej innowacyjnej wiertnicy horyzontalnej wraz z dedykowanym kierunkowym systemem lokalizacji. Taki kształt projektu i stopień jego zawansowania gwarantują osiągnięcie zakładanych wskaźników rezultatu w następującym zakresie:  Liczba utrzymanych miejsc pracy kobiety / mężczyźni (wsparcie w związku z pandemią COVID-19) - 2 Reasumując projekt jest odpowiedzią na zidentyfikowane potrzeby firmy i klientówdotyczące rozszerzenia zakresu usług o przewierty bezwykopowe, które w obecnych czasach są poszukiwane ze względu na silne zurbanizowanie terenów zabudowanych (miejskich) oraz ze względu na pozytywny wpływ niniejszej technologii na środowisko naturalne. Projekt przyczyni się do polepszenia sytuacji przedsiębiorcy dotkniętego negatywnymiskutkami wystąpienia COVID-19 i potencjalnie zapobiegnie zm (Polish)
    0 references
    The project is a response to the identified problems and needs of the Equipment and Transport Services Department and its customers. It is preceded by a thorough analysis of the industry and the economic situation of the company as a result of the COVID-19 pandemic. The aim of the project is to counteract the negative effects of the widespread COVID-19 outbreak for several months by extending the service offer of Zust company to include an innovative service of trenchless horizontal drills based on modern technology by means of a specialised horizontal drilling rig (dedicated to controlled drills). The project is innovative in the scale of the company, the company does not have equipment that is the subject of the investmentThe drilling machine will enable the installation of pipelines (sewage, water supply, compression, telecommunications) even more than 100 m in one section, enabling the avoidance of obstacles, collisions, underground and aboveground infrastructure. Such a method of execution of the investment will increase competitiveness, efficiency and, above all, reduce the costs of performing construction works, and will also enable the acquisition of new customers. In the investment field, the project will include the purchase of a specialised innovative horizontal drilling rig with a dedicated directional location system. Such design and the degree of advancement of the project shall ensure that the expected result indicators are achieved in the following respects: Number of maintained female/men jobs (support due to the COVID-19 pandemic) — 2 Summary, the project is a response to the identified needs of the company and customers regarding the extension of the scope of services to include trenchless drilling, which are currently in demand due to the strong urbanisation of built-up (urban) areas and the positive impact of this technology on the environment. The project will improve the situation of entrepreneurs affected by the negative effects of COVID-19 and potentially prevent collusion (English)
    21 October 2022
    0 references
    The project is a response to the identified problems and needs of the Equipment and Transport Services Department and its customers. It is preceded by a thorough analysis of the industry and the economic situation of the company as a result of the COVID-19 pandemic. The aim of the project is to counteract the negative effects of the widespread COVID-19 outbreak for several months by extending the service offer of Zust company to include an innovative service of trenchless horizontal drills based on modern technology by means of a specialised horizontal drilling rig (dedicated to controlled drills). The project is innovative in the scale of the company, the company does not have equipment that is the subject of the investmentThe drilling machine will enable the installation of pipelines (sewage, water supply, compression, telecommunications) even more than 100 m in one section, enabling the avoidance of obstacles, collisions, underground and aboveground infrastructure. Such a method of execution of the investment will increase competitiveness, efficiency and, above all, reduce the costs of performing construction works, and will also enable the acquisition of new customers. In the investment field, the project will include the purchase of a specialised innovative horizontal drilling rig with a dedicated directional location system. Such design and the degree of advancement of the project shall ensure that the expected result indicators are achieved in the following respects: Number of maintained female/men jobs (support due to the COVID-19 pandemic) — 2 Summary, the project is a response to the identified needs of the company and customers regarding the extension of the scope of services to include trenchless drilling, which are currently in demand due to the strong urbanisation of built-up (urban) areas and the positive impact of this technology on the environment. The project will improve the situation of entrepreneurs affected by the negative effects of COVID-19 and potentially prevent collusion (English)