Extension with reconstruction of the kindergarten building in Wiśniowa (Q4425404)

From EU Knowledge Graph
Revision as of 07:59, 26 October 2022 by DG Regio (talk | contribs) (‎Changed an Item: Import item from Poland)
Jump to navigation Jump to search
Project Q4425404 in Poland
Language Label Description Also known as
English
Extension with reconstruction of the kindergarten building in Wiśniowa
Project Q4425404 in Poland

    Statements

    0 references
    3,197,102.96 zloty
    0 references
    710,715.99 Euro
    0 references
    4,262,803.98 zloty
    0 references
    947,621.32 Euro
    0 references
    75.0 percent
    0 references
    1 January 2021
    0 references
    31 December 2022
    0 references
    GMINA WIŚNIOWA
    0 references
    0 references

    49°46'30.29"N, 19°58'33.64"E
    0 references
    Projekt odpowiada na potrzeby zdiagnozowane w GPR, gdzie jednym z projektów podstawowych jest inwestycja rozbudowy z przebudową budynku przedszkola w Wiśniowej. Na potrzeby inwestycji opracowano dokumentację projektową określającą optymalny zakres prac poprawiających jakość funkcjonowania placówki oraz zwiększenie dostępu do oferowanych usług. Projekt obejmuje zadania: 1. Przebudowa i remont cz. istniejącej. Przebudowa piwnicy i parteru, rozbiórka ścian piętra, stropu nad piętrem oraz dachu. Skucie klatki schodowej od poziomu parteru wzwyż, skucie zadaszenia nad wejściem do jadalni, zadaszenia nad wejściem na istniejącą klatkę schodowa oraz schodów zewnętrznych. W miejsce skutych schodów powstaną zew. schody. W istn. cz. budynku planuje się wymianę stolarki okiennej i drzwiowej, instalacji wewn., ocieplenie oraz prace remontowe. W cz. istn., na poziomie parteru, będą się mieścić pom. socjalno-biurowe oraz jadalnia, na poziomie poddasza- żłobek z sanitariatami. 2. Rozbudowa W cz. dobudowanej znajdą się: dwie klatki schodowe, szatnia, sale przedszkolne wraz z sanitariatami. Pomieszczenia sal dla dzieci przedszkolnych oraz jadalnię zlokalizowano na parterze. Na terenie przedszkola wydzielono pom. socjalno-szatniowe dla personelu, pokój dyrektora oraz toalety dla pracowników. Wydzielono pom. na sprzęt porządkowy. Żywienie dzieci nie ulega zmianie, będzie się odbywać w systemie cateringowym. Wydzielono pom. dystrybucji posiłków oraz zmywalnię. 3. Zagospodarowanie otoczenia budynku. Likwidacja istn. utwardzeń chodnika. Rozbiórka pow. asfaltowej. Likwidacja i częściowa wymiana ogrodzeń. Budowa murku oporowego, chodników. Budowa i wyposażenie placu zabaw z elementami małej architektury (pow. 458 m2). Budowa zatoki manewrowej ppoż. Wykonanie kan. opadowej oraz przekładki przyłącza wody. Elementem projektu są: - Nadzór - Promocja - Koszty pośrednie Wnioskodawca dysponuje niezbędnym wyposażeniem, które będzie m.in. prz (Polish)
    0 references
    The project responds to the needs diagnosed in the GPR, where one of the basic projects is the development investment with the reconstruction of the kindergarten building in Wiśniowa. For the purpose of the investment, a project documentation was developed specifying the optimal scope of works improving the quality of the facility’s functioning and increasing access to the services offered. The project includes tasks: 1. Reconstruction and renovation of the existing part. Reconstruction of the basement and ground floor, demolition of the walls of the floor, ceiling above the floor and roof. Fastening the staircase from the level of the ground floor upwards, fastening the roof above the entrance to the dining room, roofing above the entrance to the existing staircase and external stairs. In place of the staircases there will be an outer staircase. In the real part of the building, it is planned to replace window and door joinery, internal installations, warming and renovation works. In the section, at the ground floor level, there will be a social and office space and a dining room, at the level of the attic- nurseries with sanitary facilities. 2. Expansion In addition, there will be: two staircases, a cloakroom, kindergarten rooms with sanitary facilities. The rooms for preschool children and the dining room are located on the ground floor. On the premises of the kindergarten were separated social and room room for staff, director’s room and toilets for employees. It was separated for cleaning equipment. The nutrition of children does not change, it will take place in the catering system. Food distribution and washing room were separated. 3. Development of the surroundings of the building. Liquidation of the pavement pavement. Demolition of the asphalt area. Decommissioning and partial replacement of fences. Construction of resistance wall, sidewalks. Construction and equipment of a playground with elements of small architecture (POW. 458 m²). Construction of fire maneuvering bay. Execution of can. rainfall and water connection divider. Part of the project are: — Supervision — Promotion — Indirect costs The applicant has the necessary equipment, which will include: (English)
    0 references
    WOJ.: MAŁOPOLSKIE, POW.: myślenicki
    0 references

    Identifiers

    RPMP.11.02.00-12-0680/17
    0 references