Construction of a bicycle path along district road No 2411P on the greenery section — Pławce (Q4423105)

From EU Knowledge Graph
Revision as of 23:28, 25 October 2022 by DG Regio (talk | contribs) (‎Changed an Item: Import item from Poland)
Jump to navigation Jump to search
Project Q4423105 in Poland
Language Label Description Also known as
English
Construction of a bicycle path along district road No 2411P on the greenery section — Pławce
Project Q4423105 in Poland

    Statements

    0 references
    2,884,060.95 zloty
    0 references
    641,126.75 Euro
    0 references
    3,393,012.9 zloty
    0 references
    754,266.77 Euro
    0 references
    85.0 percent
    0 references
    1 August 2020
    0 references
    31 May 2022
    0 references
    POWIAT ŚREDZKI
    0 references
    0 references

    52°10'48.43"N, 17°15'42.34"E
    0 references
    Przedmiotem projektu jest budowa ścieżki rowerowej wzdłuż drogi powiatowej 2411P na odcinku Zielniki - Pławce wraz z systemem oświetlenia. Zakres prac:• wykonanie nawierzchni ścieżki rowerowej wraz z podb.• wykonanie bieżącej konserwacji rowu• wykonanie bieżącej konserwacji poboczy• wykonanie opasek z humusu• instalację oświetlenia – 30 szt. lamp solarnych ledowych (zasilanych panelem fotowolt.), zamontowanych w miejscowościach: Zielniki, Romanowo i Pławce• wykonanie organizacji ruchu i urządzeń BRD (jak w p.3.4)• wykonanie 3 miejsc postojowych typu Bike amp; Ride o powierzchni 8m2 dla rowerów w miejscowościach Zielniki, Romanowo i Pławce, po 5 stanowisk dla rowerów każde.Łączna długość ścieżki rowerowej wynosi 4435 m.W wyniku realizacji projektu ruch rowerowy zostanie przesunięty poza jezdnię, przez co poprawi się jakość i bezpieczeństwo komunikacji, zarówno rowerzystów, jak i osób zmotoryzowanych. Po zrealizowaniu inwestycji powstaną dużo szersze możliwości wyboru sposobu komunikacji oraz zwiększy się atrakcyjność komunikacji rowerowej i publ., wzrośnie liczba osób korzystających z transportu rowerowego. Projekt przewiduje zastosowanie w rejonie przejazdów i przejść dla pieszych obniżenia krawężników oraz specjalnych płytek ryflowanych dla ułatwienia poruszania się os. niepełnosprawnych ruchowo i niewidomych.Projekt bezpośrednio przyczyni się do stworzenia infr. dającej możliwość bezp., komfortowego dostępu do transportu zbiorowego. Projekt ma na celu przystosowanie układu ścieżek rowerowych i infrastruktury towarzyszącej do potrzeb komunik. powiatu w ramach popularyzacji mobilności miejskiej.W ramach projektu przepr. zostanie także kampania na rzecz popularyzacji transportu niskoemisyjnego, w szczególności transportu rowerowego.Wskaźniki produktu: Długość wspartej infrastruktury rowerowej: 4 435 m Liczba stanowisk postojowych w wybudowanych obiektach „Bamp;R”: 15 sztLiczba wybudowanych obiektów „Bamp;R”: 3 szt.Liczba akcji i kampanii promocyjnych: 2 szt (Polish)
    0 references
    The subject of the project is the construction of a bicycle path along the 2411P district road on the greenery section — Pławce with the lighting system. Scope of work:• execution of bicycle path pavement along with podb.• execution of current ditch maintenance• execution of current maintenance of the sideways• production of humus bands• installation of lighting — 30 pcs. of solar led lamps (powered with photovoltaic panel), installed in localities: Herbariums, Romanowo and Pławce• execution of traffic organisation and BRD equipment (as in p. 3.4)• execution of 3 parking spaces type Bike amp; Ride with an area of 8 m² for bicycles in the towns of Zielniki, Romanowo and Pławce, 5 stations for bicycles each.The total length of the bicycle path is 4 435 m.As a result of the project, bicycle traffic will be moved beyond the roadway, which will improve the quality and safety of communication, both cyclists and motorised people. Once the investment has been completed, there will be much wider possibilities to choose the mode of communication and increase the attractiveness of cycling and publ transport, the number of people using bicycle transport will increase. The project provides for the use in the area of crossings and pedestrian crossings for lowering curbs and special rigged tiles to facilitate movement of persons with disabilities and the blind.The project will directly contribute to the creation of an infr. allowing for a safe, comfortable access to public transport. The project aims to adapt the layout of bicycle paths and accompanying infrastructure to the needs of the district as part of the popularisation of urban mobility.The project will also include a campaign to popularise low-emission transport, in particular bicycle transport.Product indicators: Length of supported bicycle infrastructure: 4 435 m Number of parking stations in built “Bamp;R” facilities: 15 pcs Number of buildings built “Bamp;R”: 3 pcs.Number of campaigns and promotional campaigns: 2 pcs (English)
    0 references
    WOJ.: WIELKOPOLSKIE, POW.: średzki
    0 references
    0 references

    Identifiers

    RPWP.03.03.01-30-0023/20
    0 references