Continuation of the extension of eco-mobility chains in Olsztyn (Q4427840)

From EU Knowledge Graph
Revision as of 19:13, 25 October 2022 by DG Regio (talk | contribs) (‎Changed an Item: Import item from Poland)
Jump to navigation Jump to search
Project Q4427840 in Poland
Language Label Description Also known as
English
Continuation of the extension of eco-mobility chains in Olsztyn
Project Q4427840 in Poland

    Statements

    0 references
    726,145.25 zloty
    0 references
    161,422.09 Euro
    0 references
    854,288.53 zloty
    0 references
    189,908.34 Euro
    0 references
    85.0 percent
    0 references
    24 July 2020
    0 references
    31 December 2022
    0 references
    GMINA OLSZTYN
    0 references

    53°46'36.19"N, 20°28'40.01"E
    0 references
    PrzedmiotemPROJEKTUjest 1 PRZEBUDOWAinfrastrukturyPIESZEJzlokalizowanejWciąguULzientaryMALEWSKIEJetapVUlicaTAstanowiCIĄGpołączeniaDROGOWEGOzGM.BarczewoIgm.Dywity.JestTOjedyneWtymOBSZARZElokalnePOŁĄCZENIEdrogoweMDZgminami.Podst.CELEMprojektowanejPRZEBUDOWYinfrastrukturyPIESZEJwODNIESIENIUdoPRZEDMIOTOWEGOzadania jest:poprawa bezpieczeństwa pieszych i innych uczestników ruchu poprzez odpowiednią separację ruchu,wykonanie nowej nawierzchni chodników,ułożenie dwudzielnych rur osłonowych oraz Elementów BRD:oznakowania POZIOMEGO-oznakowanie poziome(płytki typu "STOP",„kocie oczka”) 2 Budowa KOMUNIKACYJNYCH ścieżek pieszo-rowerowych,budowa Łącznika mdz.ul.Niepodległości a Łynostradą-Budowa ciągu pieszo-rowero.Zad.jest elementem trasy rowerowej"Łynostrada”prowadzącej wzdłuż rzeki Łyny z Os.Brzeziny poprzez os.Podgrodzie,P.Centralny, P.Podgrodzie i Las Miejski,aż do granic Olsztyna.Pl.zakres to brakujący element–łącznik mdz.ul.Niepodległości a Łynostradą.Podst.celem budowy łącznika jest:zapewnienie ciągłości i spójności trasy pieszo-rowerowej,poprawa bezpieczeństwa pieszych i rowerzystów poprzez wykonanie nowej nawierzchni ciągu,elementówBRD-ogrodzenia od str.szpitala,poręczy ochronnych wzdłuż pochylni 3 Etap II i III przebudowy ul.Iwaszkiewicza–w ramach inwestycji planowana jest budowa drogi dla rowerów i przebudowa ciągówPieszych oraz połączenie tej drogi z ciągiem pieszo-rowerowym w ramach inwestycji budowa komunikacyjnych ścieżek rowerowych w Olsztynie EtapIV trasa rowerowa Łynostrada (szlak jest kontynuowany zarówno na terenie gm.Stawiguda jak i Dywity).Podst.celem proj.budowy i przebudowy jest:poprawa bezpieczeństwa pieszych i rowerzystów poprzez wybudowanie nowego fragmentu drogi dla pieszych i rowerów,przebudowę istn.ciągu pieszego po stronie wschodniej.EL.BRD:oznakowanie poziome IpionoweORAZbalustradyOchronneProjektPoprawi Zrównoważoną mobilność mieszkańcówMOFi jest zgodny zSZOOP RPO WiM 2014-2020Działanie 4.4Poddziałanie4.4.1Termin realizacji projektu2020-2022 (Polish)
    0 references
    The subject of the projectis 1 PRODUCTION of an infrastructure of the sixlocatedinduction of the infrastructures of the United States of America and the United States of America.They are the only part of the road transport system.Subsequent.Subject-designedinfrastructuresinfrastructuresfor the first time jest:poprawa safety of pedestrians and other traffic participants through proper separation of traffic, new pavement pavement, installation of two-part curtain pipes and BRD elements: horizontal marking-horizontal marking(plates of type "STOP",“catch eyelets”) 2 Construction of COMMUNICATIONAL walking-bike paths,construction of mdz.ul Connector.Independence and Łynostrada-Construction of walking-row tracks.Zad.is an element of the cycle route "Łynostrada” leading along the river Łyna from Os.Brzeziny through osgrodzie, P.Centralny, P.Podgrodzie and Urban Forest,until to the borders of Olsztyn.Pl.range is the missing element-connector mdz.ul.Independence and Łynostrada.Podst.Objective of construction of the connector jest:zapewnienie continuity and consistency of the walking-bike route,improving the safety of pedestrians and cyclists by making a new surface of the thrust,BRD-fence elements from the hospital, safety rails along the 3 rd stage II and III reconstruction of Iwaszkiewicza street — as part of the investment, the construction of a road for bicycles and reconstruction of the pedestrian routes and the connection of this road with the pedestrian-bike route as part of the investment is planned for the construction of transport bike paths in Olsztyn EtapIV bike route Łynostrada (the route is continued both in the area of Stawiguda and Dywity).Podst. Purpose of the project: construction and reconstruction jest:poprawa of pedestrian and cyclists safety by building a new section of the road for pedestrians and bicycles, reconstruction of the pedestrian route on the east side.EL.BRD: horizontal marking IpionoweORAZbalustradyProtectiveProjectSustainable mobility of residentsMOFi is compliant with SZOOP ROP WiM 2014-2020Action 4.4Sub-measure4.4.1Project period2020-2022 (English)
    0 references
    WOJ.: WARMIŃSKO-MAZURSKIE, POW.: Olsztyn
    0 references

    Identifiers

    RPWM.04.04.01-28-0003/20
    0 references