Thermomodernisation of primary school buildings in Hejdyk and the Large Boiler (Q4427807)
Jump to navigation
Jump to search
Project Q4427807 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermomodernisation of primary school buildings in Hejdyk and the Large Boiler |
Project Q4427807 in Poland |
Statements
2,013,867.73 zloty
0 references
447,682.8 Euro
0 references
2,372,046.8 zloty
0 references
527,306.0 Euro
0 references
84.9 percent
0 references
13 July 2017
0 references
30 June 2023
0 references
GMINA PISZ
0 references
Projekt „Termomodernizacja budynków szkół podstawowych w Hejdyku i Kotle Dużym” należących do Gminy Pisz-głęboka kompleksowa modernizacjia, tj. m.in. prace termomodernizacyjne wskazane w audytach oraz zmiany w sposobach ogrzewania uwzględniające OZE. SP Kocioł Duży ROBOTY KWALIFIKOWALNE- Modernizacja przegród: Drzwi zewn. do kotłowni "Wentylacja grawitacyjna", Strop nad piwnicą, Strop pod poddaszem, Ściana zewn., Modernizacja systemu grzewczego; Kompleksowe wykonanie instalacji fotowoltaicznej o mocy PDC 6,8 kWp (maks. osiągnięta moc AC 6,05 kW); Wykonanie nowej instalacji elektrycznej, usunięcie kolizji na zewn. budynku szkoły. NIEKWALIFIKOWALNE- roboty uzupełniające; instalacja odgromowa, uziom zn, połączenia, audyt ex-post. SP Hejdyk ROBOTY KWALIFIKOWALNE- Modernizacja przegród: luksfery "Wentylacja grawitacyjna", Strop nad piwnicą, Strop pod poddaszem stary, Strop pod poddaszem nowy, Ściana fundamentowa, Drzwi zewn "Wentylacja grawitacyjna", Ściana zewn., Ściana zewn. rozbudowy, Okno "Wentylacja grawitacyjna"; Modern. systemu CWU, Modern. systemu grzewczego; Wykonanie instalacji fotowoltaicznej moc PDC 6,8 kWp (maks. osiągnięta moc AC 6,05 kW); Wykonanie nowej instalacji elektrycznej; Usunięcie kolizji instalacji na zew. budynku związanych z termomodernizacją NIEKWALIFIKOWALNE- instalacja odgromowa, uziom otokowy, połączenia; badania i pomiary odbiorcze inst. odgromowej, audyt ex-post. Planowany uzysk rocznego zmniejszenia zapotrzebowania na energię: SP Hejdyk: 81,07%; SP Kocioł Duży: 82,87%, czyli średnio dla wszystkich budynków o 81,97% (Polish)
0 references
Project “Termomodernisation of primary school buildings in Hejdyk and Duży Boiler” belonging to the Municipality of Pisz-deep comprehensive modernisation, i.e. thermomodernisation works indicated in audits and changes in heating methods taking into account RES. SP Boiler Large Qualifical WORKS- Modernisation of partitions: External doors to the boiler room “Gravity Ventilation”, Strop above the basement, Ceiling under the attic, Exterior wall, Modernisation of the heating system; Comprehensive execution of a photovoltaic installation with a PDC power of 6.8 kWp (maximum achieved power AC 6.05 kW); Construction of a new electrical installation, removal of collisions on the outside of the school building. Unqualified — complementary works; lightning protection installation, ground zn, connections, ex-post audit. SP Hejdyk KWALIFIKOWALNE ROBOTY- Modernisation of partitions: luxuries “Gravity Ventilation”, Ceiling above the basement, Ceiling under the attic old, ceiling under the attic new, Foundation wall, Exterior door “Gravity ventilation”, Exterior wall, Exterior wall expansion, Window “Gravity ventilation”; Modern. CWU system, Modern. heating system; Photovoltaic installation PDC power 6.8 kWp (max. achieved power AC 6.05 kW); Construction of a new electrical installation; Removal of collisions of installations on the outside of the building related to the thermal modernisation of the unqualified — lightning protection system, pedestal ground, connections; lightning protection tests and measurements, ex-post audit. Planned annual reduction in energy demand: Sp Hejdyk: 81.07 %; SP Large Boiler: 82.87 %, on average for all buildings by 81.97 % (English)
0 references
WOJ.: WARMIŃSKO-MAZURSKIE, POW.: piski
0 references
Identifiers
RPWM.04.03.01-28-0056/20
0 references