Reconstruction of the power grid with a voltage of SN enabling the connection of electricity generation units from renewable energy sources in the Suskie district stage III (Q4421052)

From EU Knowledge Graph
Revision as of 15:11, 24 October 2022 by DG Regio (talk | contribs) (‎Changed an Item: Import item from Poland)
Jump to navigation Jump to search
Project Q4421052 in Poland
Language Label Description Also known as
English
Reconstruction of the power grid with a voltage of SN enabling the connection of electricity generation units from renewable energy sources in the Suskie district stage III
Project Q4421052 in Poland

    Statements

    0 references
    975,302.95 zloty
    0 references
    216,809.85 Euro
    0 references
    2,891,500.0 zloty
    0 references
    642,780.45 Euro
    0 references
    33.73 percent
    0 references
    21 December 2020
    0 references
    31 March 2022
    0 references
    TAURON DYSTRYBUCJA SPÓŁKA AKCYJNA
    0 references
    0 references
    Realizacja projektu zapewni prawidłowe funkcjonowanie sieci elektroenergetycznych na terenie wybranych miejscowości powiatu suskiego poszerzając możliwość przyłączania nowych jednostek wytwarzania energii elektrycznej ze źródeł odnawialnych w rozproszeniu. W gminach Stryszawa i Budzów, w których zlokalizowany jest projekt planowany jest znaczący wzrost ilości instalacji OZE wytwarzających energię elektryczną. Zadania polegają w przeważającej części na przebudowie istniejących sieci energetycznych SN. Przebudowy planuje się z uwagi na zły stan techniczny sieci zużyte przewody, słupy, niewystarczające przekroje przewodów oraz znaczenie tych odcinków w zapewnieniu właściwych parametrów pracy całej sieci.Zadania w ramach projektu:Zadanie 1. Przebudowa elektroenergetycznej sieci SN 15kV GPZ Sucha Stryszawa odgałęzienie Hucisko Ośrodek Etap I;Zadanie 2. Przebudowa elektroenergetycznej sieci SN 15kV GPZ Sucha Stryszawa odgałęzienie Hucisko Ośrodek Etap II;Zadanie 3. Przebudowa elektroenergetycznej sieci napowietrznokablowej SN 15kV GPZ Sucha Zembrzyce odgałęzienie Bieńkówka Góra Etap I.Inwestycja poprawi poziom niezawodności pracy sieci elektroenergetycznej oraz zapewni stabilne źródło zasilania dla obecnych i przyszłych odbiorców energii elektrycznej w regionie. Realizacja zadań pozwoli Wnioskodawcy skuteczniej zarządzać energią elektryczną wytworzoną w ramach OZE.Wybrane rozwiązania techniczne oraz architektoniczne, przebudowa linii napowietrznych oraz kablowych, są rozwiązaniami najkorzystniejszymi dla ww. obszarów. Wybrano rozwiązania najbardziej korzystne kosztowo i jednocześnie akceptowalne przez właścicieli gruntów.Ciąg dalszy w punkcie Q. (Polish)
    0 references
    The implementation of the project will ensure the proper functioning of electricity grids in selected towns of the Suskie district, extending the possibility of connecting new units of electricity generation from renewable sources in dispersion. In the municipalities of Stryszawa and Budzów, where the project is located, a significant increase in the number of RES installations generating electricity is planned. The tasks consist for the most part of the reconstruction of the existing power grids of the SC. Reconstruction is planned due to poor technical condition of the network used wires, poles, insufficient wire cross-sections and the importance of these sections in ensuring proper parameters of operation of the entire network. Reconstruction of the power grid SN 15 kV GPZ Sucha Stryszawa branch branch Hucisko Center Stage I;Task 2. Reconstruction of the power grid SN 15 kV GPZ Sucha Stryszawa branch branch Hucisko Center Stage II;Task 3. Reconstruction of the overhead cable network SN 15 kV GPZ Sucha Zembrzyce branch Bieńkówka Góra Stage I. The investment will improve the reliability of the power grid operation and provide a stable power source for current and future electricity consumers in the region. Implementation of the tasks will allow the Applicant to manage more effectively the electricity generated within the RES. Selected technical and architectural solutions, reconstruction of overhead and cable lines, are the most advantageous solutions for the above-mentioned areas. The most cost-benefit and at the same time acceptable solutions were chosen by landowners.Continue in point Q. (English)
    21 October 2022
    0 references
    WOJ.: MAŁOPOLSKIE, POW.: suski
    0 references

    Identifiers

    RPMP.04.01.02-12-0043/20
    0 references