Change of use with reconstruction of the palace and western outbuilding in the palace and park complex at ul. Oh, that’s it. Bronisława Markiewicza 4 in Młochów for facilities with a relaxing and gastronomic function with accommodation facilities — guest rooms with internal installations: water, sewage, thermal — gas boiler room, electric boiler room and construction of internal road and sidewalks (Q4430713)

From EU Knowledge Graph
Revision as of 15:00, 24 October 2022 by DG Regio (talk | contribs) (‎Changed an Item: Import item from Poland)
Jump to navigation Jump to search
Project Q4430713 in Poland
Language Label Description Also known as
English
Change of use with reconstruction of the palace and western outbuilding in the palace and park complex at ul. Oh, that’s it. Bronisława Markiewicza 4 in Młochów for facilities with a relaxing and gastronomic function with accommodation facilities — guest rooms with internal installations: water, sewage, thermal — gas boiler room, electric boiler room and construction of internal road and sidewalks
Project Q4430713 in Poland

    Statements

    0 references
    999,869.08 zloty
    0 references
    222,270.9 Euro
    0 references
    2,544,843.64 zloty
    0 references
    565,718.74 Euro
    0 references
    39.29 percent
    0 references
    1 July 2020
    0 references
    31 December 2022
    0 references
    GMINA NADARZYN
    0 references
    Projekt realizowany jest przez Gminę Nadarzyn. Celem głównym projektu jest zwiększenie dostępności do kultury wraz z rozwojem oferty działań w tym zakresie. Zakres projektu obejmuje renowację i adaptację historycznego obiektu zabytkowego Oficyny Zachodniej w Młochowie w celu zachowania dotychczasowych funkcji obiektu zabytkowego, a także nadaniu mu nowych funkcji użytkowych (z przeznaczeniem na cele kulturalne i edukacyjne), w tym również w połączeniu z działalnością komercyjną. Projekt jest I-ym etapem realizacji przedsięwzięcia dotyczącego przebudowy Pałacu i Oficyny Zachodniej w zespole pałacowo-parkowym przy ul. ks. B. Markiewicza 4 w Młochowie, ze zmianą sposobu użytkowania na fukcję wypoczynkowo-gastronomiczną z zapleczem noclegowym (pokoje gościnne). Aplikowany projekt dotyczy przebudowy i zmiany sposobu użytkowania obiektu Oficyny Zachodniej wraz z instalacjami wewnętrznymi: wodną, kanalizacyjną, cieplną – kotłownia gazowa, elektryczną. Projekt zawiera następujące zadania, które realizowane będą zgodnie z opracowaną i gotową dokumentacją projektowo-kosztorysową : I. Prace przygotowawcze W ramach tej fazy są realizowane zadania związane z przygotowaniem projektu do realizacji – w szczególności: Opracowanie studium wykonalności projektu wraz z analizą popytu wykazującą zapotrzebowanie na projekt. Dokumentacja techniczna wraz z niezbędnymi ekspertyzami została wykonana na wcześniejszym etapie. II. Promocja projektu W tej fazie realizowane są zadania związane z przygotowaniem i dystrybucją naklejek i ulotek. Przygotowane naklejki będą służyć do oklejenia wytypowanych środków transportowych w celu promowania projektu i jego realizacji ze środków UE. Zostanie również wykonana tablica informacyjno-pamiątkowa. III. Prace inwestycyjne: budowlane, w tym: elewacje, klatkę schodową, częściowe docieplenie budynku, montaż windy, roboty instalacyjne elektryczne i teletechniczne, wod-kan, wentylacji i inne. (Polish)
    0 references
    The project is implemented by the Municipality of Nadarzyn. The main objective of the project is to increase accessibility to culture along with the development of the offer of activities in this area. The scope of the project includes the renovation and adaptation of the historic building of the Western Office in Młochów in order to preserve the existing functions of the historic building, as well as to give it new functional functions (for cultural and educational purposes), including in combination with commercial activities. The project is the first stage of the project concerning the reconstruction of the Palace and Western Outbuilding in the palace and park complex at Fr. B. Markiewicza 4 in Młochów, with the change of use to a holiday and catering function with accommodation facilities (hospital rooms). The applied project concerns the reconstruction and change of the manner of use of the Western Outbuilding facility together with internal installations: water, sewerage, thermal — gas boiler room, electric. The project contains the following tasks, which will be carried out in accordance with the developed and ready-made design and cost estimates documentation: I. Preparatory work During this phase, tasks related to the preparation of the project for implementation are carried out — in particular: Development of a feasibility study of the project together with a demand analysis demonstrating the need for the project. The technical documentation together with the necessary expertise was made at an earlier stage. I MEAN, I'M SORRY. In this phase, tasks related to the preparation and distribution of stickers and leaflets are carried out. The prepared stickers will be used to glue selected means of transport in order to promote the project and its implementation from EU funds. An information and commemorative board will also be made. III. Investment work: construction, of which: facades, staircase, partial insulation of the building, installation of elevators, electrical and teletechnical installation works, water-can, ventilation and others. (English)
    0 references
    WOJ.: MAZOWIECKIE, POW.: pruszkowski
    0 references

    Identifiers

    RPMA.05.03.00-14-G820/20
    0 references