Use of renewable energy for heating buildings from WZURIB (Q4419680)

From EU Knowledge Graph
Revision as of 14:20, 24 October 2022 by DG Regio (talk | contribs) (‎Changed an Item: Adding translation)
Jump to navigation Jump to search
Project Q4419680 in Poland
Language Label Description Also known as
English
Use of renewable energy for heating buildings from WZURIB
Project Q4419680 in Poland

    Statements

    0 references
    126,704.53 zloty
    0 references
    28,166.42 Euro
    0 references
    194,930.07 zloty
    0 references
    43,332.95 Euro
    0 references
    65.0 percent
    0 references
    1 April 2023
    0 references
    30 December 2023
    0 references
    WŁODAWSKI ZAKŁAD USŁUG REMONTOWYCH I BUDOWLANYCH SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    Celem projektu jest zmiana system ogrzewania i c.w.u. w budynku firmy WZURIB sp.z.o.o. z wysokoemisyjnego kotła spalającego węgiel kamienny na system oparty na OZE. W ramach projektu planowane jest montaż : - pomp ciepła powietrze - woda o łącznej mocy 60 kW do ogrzewania budynków, - instalacji fotowoltaicznej o mocy ok. 15 kW na dachu budynku w celu zasilenia pomp ciepła. - buforu z gorącą wodą stanowiącego magazyn energii cieplnej. Założeniem projektu poza zmniejszeniem emisji spalin jest samowystarczalność systemu grzewczego. Osiągnięte to ma być dzięki instalacji fotowoltaicznej, której moc dobrana została pod zapotrzebowanie pomp ciepła na energię elektryczną. Dzięki zastosowaniu bufora ciepła - magazynu energii, możliwe będzie gromadzenie energii cieplnej na momenty, w których chwilowe zapotrzebowanie przewyższać będzie wydajność systemu. (Polish)
    0 references
    The aim of the project is to change the heating and heating system in the building of WZURIB sp.z.o.o. from a high-emission boiler burning hard coal to a system based on RES. As part of the project, it is planned to install: — air heat pumps — water with a total power of 60 kW for heating buildings, — photovoltaic installation with a power of approx. 15 kW on the roof of the building to power heat pumps. — hot water buffer constituting a thermal energy storage. The assumption of the project, apart from reducing exhaust emissions, is the self-sufficiency of the heating system. This is to be achieved thanks to the photovoltaic installation, the power of which was selected for the demand of heat pumps for electricity. Thanks to the use of a heat buffer — an energy storage, it will be possible to collect heat energy at moments when the instantaneous demand will exceed the efficiency of the system. (English)
    21 October 2022
    0 references
    The aim of the project is to change the heating and heating system in the building of WZURIB sp.z.o.o. from a high-emission boiler burning hard coal to a system based on RES. As part of the project, it is planned to install: — air heat pumps — water with a total power of 60 kW for heating buildings, — photovoltaic installation with a power of approx. 15 kW on the roof of the building to power heat pumps. — hot water buffer constituting a thermal energy storage. The assumption of the project, apart from reducing exhaust emissions, is the self-sufficiency of the heating system. This is to be achieved thanks to the photovoltaic installation, the power of which was selected for the demand of heat pumps for electricity. Thanks to the use of a heat buffer — an energy storage, it will be possible to collect heat energy at moments when the instantaneous demand will exceed the efficiency of the system. (English)
    0 references
    WOJ.: LUBELSKIE, POW.: włodawski
    0 references
    0 references

    Identifiers

    RPLU.15.01.00-06-0320/22
    0 references