“Modernisation of Odrzański locks on the section in the management of Gliwice Gliwice – adaptation to the third class of the waterway” Phase II (Q85875)

From EU Knowledge Graph
Revision as of 08:37, 22 October 2022 by DG Regio (talk | contribs) (‎Changed an Item: Import item from Poland)
Jump to navigation Jump to search
Project Q85875 in Poland
Language Label Description Also known as
English
“Modernisation of Odrzański locks on the section in the management of Gliwice Gliwice – adaptation to the third class of the waterway” Phase II
Project Q85875 in Poland

    Statements

    0 references
    41,408,723.51 zloty
    0 references
    9,205,159.24 Euro
    13 January 2020
    0 references
    48,716,145.49 zloty
    0 references
    10,829,599.14 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2016
    0 references
    31 December 2019
    0 references
    PAŃSTWOWE GOSPODARSTWO WODNE WODY POLSKIE
    0 references
    0 references

    50°18'4.0"N, 18°39'44.3"E
    0 references

    50°23'29.8"N, 18°36'39.2"E
    0 references

    50°21'34.9"N, 18°24'29.9"E
    0 references
    Projekt polega na wykoniu kompleksowych prac budowlanych prowadzących do modernizacji dwóch śluz na Kanale Gliwickim - Łabędy i Dzierżno. Wykonanie prac pozwoli na skrócenie okresu śluzowania na śluzie Łabędy o 7 minut, a na śkuzie Dzierżno o 10 minut. (Polish)
    0 references
    The project consists of the completion of complex construction works leading to the modernisation of two locks on the Gliwice Canal – the Elbe and Dzierżno. The completion of the works will reduce the locking period at the Swan mucus by 7 minutes, and on Śkuza Dzierżno by 10 minutes. (English)
    14 October 2020
    0 references
    Le projet consiste à achever des travaux de construction complets menant à la modernisation de deux écluses sur le canal Gliwice — Łabędy et Dzierżno. L’exécution des travaux réduira de 7 minutes la période de fermeture de l’écluse de Łabędy et de 10 minutes sur la Śkuzie Dzierżno. (French)
    30 November 2021
    0 references
    Das Projekt besteht in der Fertigstellung umfassender Bauarbeiten, die zur Modernisierung von zwei Schleusen auf dem Gliwice-Kanal – Łabędy und Dzierżno – führen. Die Ausführung der Arbeiten wird die Sperrfrist auf der Schleuse Łabędy um 7 Minuten und auf der Śkuzie Dzierżno um 10 Minuten verkürzen. (German)
    7 December 2021
    0 references
    Het project bestaat uit de voltooiing van uitgebreide bouwwerkzaamheden die leiden tot de modernisering van twee sluizen op het Gliwice-kanaal — Łabędy en Dzierżno. De uitvoering van de werkzaamheden zal de vergrendelingsperiode van de Łabędy-sluis met 7 minuten verkorten, en op de Śkuzie Dzierżno met 10 minuten. (Dutch)
    16 December 2021
    0 references
    Il progetto consiste nel completare i lavori di costruzione completi che portano all'ammodernamento di due chiuse sul Canale di Gliwice — Łabędy e Dzierżno. L'esecuzione dei lavori ridurrà di 7 minuti il periodo di chiusura della serratura di Łabędy e di 10 minuti sul Śkuzie Dzierżno. (Italian)
    16 January 2022
    0 references
    El proyecto consiste en completar las obras de construcción que conduzcan a la modernización de dos esclusas en el canal de Gliwice: Łabędy y Dzierżno. La ejecución de las obras reducirá el período de bloqueo en la cerradura de Łabędy en 7 minutos, y en el Śkuzie Dzierżno en 10 minutos. (Spanish)
    19 January 2022
    0 references
    Projektet består i færdiggørelse af komplekse anlægsarbejder, der fører til modernisering af to sluser på Gliwicekanalen Elben og Dzierżno. Afslutningen af ​​arbejdet vil reducere låseperioden på Swan slim med 7 minutter, og på Åkuza Dzierżno med 10 minutter. (Danish)
    26 July 2022
    0 references
    Το έργο συνίσταται στην ολοκλήρωση των σύνθετων κατασκευαστικών εργασιών που οδηγούν στον εκσυγχρονισμό δύο κλειδαριών στο κανάλι Gliwice â EUR Elbe και Dzierżno. Η ολοκλήρωση των εργασιών θα μειώσει την περίοδο κλειδώματος στη βλέννα του Κύκνου κατά 7 λεπτά, και στο Åkuza Dzierżno κατά 10 λεπτά. (Greek)
    26 July 2022
    0 references
    Projekt se sastoji od završetka složenih građevinskih radova koji vode modernizaciji dviju brava na kanalu Gliwice â EUR Elbe i Dzieršno. Završetak radova smanjit će razdoblje zaključavanja u sluzi Swana za 7 minuta, a na Škuzi Dzieršno za 10 minuta. (Croatian)
    26 July 2022
    0 references
    Proiectul constă în finalizarea lucrărilor complexe de construcție care duc la modernizarea a două ecluze pe canalul Gliwice, Elba și Dzierżno. Finalizarea lucrărilor va reduce perioada de blocare la mucusul lebedei cu 7 minute, iar pe Åkuza Dzierżno cu 10 minute. (Romanian)
    26 July 2022
    0 references
    Projekt pozostáva z dokončenia komplexných stavebných prác vedúcich k modernizácii dvoch plavebných komôr na kanáli Gliwice â EUR Labe a DzierÅ 0,25no. Dokončenie prác skráti dobu uzamykania v hliene Swan o 7 minút a na Škuze DzierÅ 0,25no o 10 minút. (Slovak)
    26 July 2022
    0 references
    Il-proġett jikkonsisti fit-tlestija ta ‘xogħlijiet ta’ kostruzzjoni kumplessi li jwasslu għall-modernizzazzjoni ta ‘żewġ serraturi fuq il-kanal Gliwice EUR l Elbe u Dzierżno. It-tlestija tax-xogħlijiet se tnaqqas il-perjodu ta ‘qfil fil-mukus Swan b’7 minuti, u fuq Åkuza Dzierżno b’10 minuti. (Maltese)
    26 July 2022
    0 references
    O projeto consiste na conclusão de obras complexas conducentes à modernização de duas eclusas no Canal Gliwice âEUR Elba e Dzierżno. A conclusão das obras reduzirá o período de bloqueio no muco cisne em 7 minutos, e em Åkuza Dzierżno em 10 minutos. (Portuguese)
    26 July 2022
    0 references
    Hanke koostuu monimutkaisten rakennustöiden loppuunsaattamisesta, jotka johtavat Gliwicen kanavan kahden lukon nykyaikaistamiseen Elbe ja Dzierżno. Töiden valmistuminen lyhentää joutsenliman lukitusaikaa 7 minuutilla ja Åkuza Dzierżnoa 10 minuutilla. (Finnish)
    26 July 2022
    0 references
    Projekt je sestavljen iz dokončanja kompleksnih gradbenih del, ki vodijo do posodobitve dveh ključavnic na kanalu Gliwice – Laba in DzierÅ 0,25no. Zaključek del bo skrajšal obdobje zaklepanja na sluzi labodov za 7 minut in na Åkuzi DzierÅ 0,25no za 10 minut. (Slovenian)
    26 July 2022
    0 references
    Projekt spočívá v dokončení komplexních stavebních prací vedoucích k modernizaci dvou zámků na kanálu Gliwice Labe a Dzierżno. Dokončení prací zkrátí dobu zamykání na Swanském hlenu o 7 minut a na Åkuze Dzierżno o 10 minut. (Czech)
    26 July 2022
    0 references
    Projektą sudaro kompleksinių statybos darbų, kurių metu modernizuojamos dvi spynos ant Gliwice kanalo Elbės ir Dzierž¼no, užbaigimas. Pabaigus darbus, užrakinimo laikotarpis prie gulbės gleivių sutrumpės 7 minutėmis, o Åkuza Dzier¼no – 10 minučių. (Lithuanian)
    26 July 2022
    0 references
    Projekts sastāv no sarežģītu būvdarbu pabeigšanas, kas noved pie divu slēdzeņu modernizācijas uz Gliwice kanāla Elbas un Dzierżno. Darbu pabeigšana samazinās bloķēšanas periodu pie Swan gļotas par 7 minūtēm, bet Åkuza Dzierżno — par 10 minūtēm. (Latvian)
    26 July 2022
    0 references
    Проектът се състои в завършването на сложни строителни работи, водещи до модернизацията на две ключалки на канала Gliwice â EUR Elbe и Dzierżno. Завършването на строителните работи ще намали периода на заключване на лебедовата слуз със 7 минути, а на Åkuza Dzierżno с 10 минути. (Bulgarian)
    26 July 2022
    0 references
    A projekt a Gliwice-csatorna két zsilipjének korszerűsítését eredményező komplex építési munkálatok befejezéséből áll. A munkálatok befejezése 7 perccel, az Åkuza Dzierżno-n pedig 10 perccel csökkenti a hattyú nyálka zsilipjét. (Hungarian)
    26 July 2022
    0 references
    Is éard atá sa tionscadal ar chríochnú na n-oibreacha tógála casta as a dtiocfaidh nuachóiriú ar dhá ghlais ar an Chanáil Gliwice â EUR an Elbe agus DzierÅţno. Laghdóidh críochnú na n-oibreacha an tréimhse glasála ag an mucus Swan faoi 7 nóiméad, agus ar Åkuza Dzieržno faoi 10 nóiméad. (Irish)
    26 July 2022
    0 references
    Projektet består av slutförandet av komplexa byggarbeten som leder till modernisering av två slussar på Gliwice kanal â EUR Elbe och Dzierżno. Slutförandet av arbetet kommer att minska låstiden vid Svanslem med 7 minuter, och på Åkuza Dzierżno med 10 minuter. (Swedish)
    26 July 2022
    0 references
    Projekt seisneb keeruliste ehitustööde lõpuleviimises, mis viivad kahe luku moderniseerimiseni Gliwice kanalil – Elbe ja Dzierżno’l. Tööde lõpuleviimine vähendab lukustusperioodi 7 minuti võrra ja Åkuza Dzierżno Åkuza Dzierżno 10 minuti võrra. (Estonian)
    26 July 2022
    0 references
    WOJ.: ŚLĄSKIE, POW.: Gliwice
    0 references
    WOJ.: ŚLĄSKIE, POW.: gliwicki
    0 references

    Identifiers

    POIS.03.02.00-00-0001/16
    0 references